Loading…
Loading…
Tender Value
₹9030.4 Cr
EMD Value
₹90.3 Cr
Closing Date
20 Aug 2026, 11:00 am
Pramod Kumar Singh
NHAI HQ
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
2026_NHAI_277031_1
NHAI/MH/ Ahilyanagar-Solapur-Akkalkot /Pkg-II
Open Tender
Civil Works
Item Rate
1095 days
NHAI HQ
Please refer Tender documents.
8 documents required · 8 mandatory
₹9.1 L
NHAI HQ
₹90.3 Cr
NHAI HQ
20 Aug 2026
9 May 2026
21 Aug 2026
9 May 2026
20 Aug 2026
9 May 2026
10 Jun 2026
NIT no. NHAI/MH/ Ahilyanagar-Solapur-Akkalkot/Pkg-II dated 08.05.2026
Name of Work Section-1: Construction of 6-lane access controlled greenfield highway from Ahilyanagar (km 290.000) to Hasapur (km 512.000) and Section-2: Operation & Maintenance of existing highways from Start of Ahilyanagar Bypass (km 0.000) to Walunj Junction (km 29.280) of NH-160 & NH-61; Walunj Junction (km 9.980) to Chapadgaon (km 80.390) of NH-561A; Chapadgaon (Karmala) (km 80.390) to Tembhurni (km 139.700) of NH-561A; Tembhurni (km 150.050) to Solapur (km 251.325) of NH-65; and Solapur (km 99.400) to Akkalkot (km 138.352) of NH-150E in the State of Maharashtra on BOT (Toll) Mode.
Name of the Firm
In Percentage (In %) In Words
Total Quoted Value (Premium)
Or In Rupees In Words
Total Quoted Value (Grant)
Note: Bidder is required to quote either Premium or Grant
Letter comprising the Financial Bid
(Refer Clauses 2.1.5, 2.11.1 and 3.2)
(NOT TO BE SUBMITTED IN THE TECHINCAL Bid)
The General Manager (T)
National Highways Authority of India
G-5&6, Sector 10, Dwarka,
New Delhi - 110 075
Sub: Section-1: Construction of 6-lane access controlled greenfield highway from Ahilyanagar (km 290.000) to Hasapur (km 512.000) and Section-2: Operation & Maintenance of existing highways from Start of Ahilyanagar Bypass (km 0.000) to Walunj Junction (km 29.280) of NH-160 & NH-61; Walunj Junction (km 9.980) to Chapadgaon (km 80.390) of NH-561A; Chapadgaon (Karmala) (km 80.390) to Tembhurni (km 139.700) of NH-561A; Tembhurni (km 150.050) to Solapur (km 251.325) of NH-65; and Solapur (km 99.400) to Akkalkot (km 138.352) of NH-150E in the State of Maharashtra on BOT (Toll) Mode.
With reference to your RFP document dated 08.05.2026, I/we, having examined the Bidding Documents and understood their contents, hereby submit my/our Bid for the aforesaid Project. The Bid is unconditional and unqualified
2. I/ We acknowledge that the Authority will be relying on the information provided in the Bid and the documents accompanying the Bid for selection of the Concessionaire for the aforesaid Project, and we certify that all information provided in the Bid are true and correct; nothing has been omitted which renders such information misleading; and all documents accompanying the Bid are true copies of their respective originals
3. The Bid has been quoted by me/us after taking into consideration all the terms and conditions stated in the RFP, Draft Concession Agreement and its Schedules, our own estimates of traffic and costs and after a careful assessment of the site and all own the conditions that may affect the Project traffic and cost and implementation of the Project.
4. I/ We acknowledge the right of the Authority to reject our Bid without assigning any reason or otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on any account whatsoever.
5. In the event of my/ our being declared as the Selected Bidder, I/we agree to enter into a Concession Agreement in accordance with the draft that has been provided to me/us prior to the Bid Due Date. We agree not to seek any changes in the aforesaid draft and agree to abide by the same
6. I/ We shall keep this offer valid for 120 (one hundred and twenty) days from the Bid Due Date specified in the RFP
7. I/ We hereby submit our Bid and offer:
a Premium in the form of revenue share at the rate of ….... % (…… percent [in words]) of the Realizable Fee from the Project in the second year post Project Completion Date to the Authority, which shall be increased by 1% (one percent) of the Realizable Fee for every subsequent year for the remaining Concession Period. [require a Grant of Rs. …… (Rupees ………………………… only)] for undertaking the aforesaid Project in accordance with the Bidding Documents and the Concession Agreement.
Yours faithfully,
Place: (Signature, name and designation of the Authorised Signatory )
Name & seal of Bidder/Lead Member:........................................
Class III DSC ID of Authorised Signatory :.............................
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
NIT.pdf
Tender Documents • 0.38 MB
DCA for BOT (Toll)_Nashik-Solapur Pkg-2 dt. 08.05.2026.pdf
Tender Documents • 1.77 MB
Financial Bid_Pkg-II.xls
Tender Documents • 0.06 MB
Nashik-Solapur_RFP BOT(T) dt. 08.05.2026.pdf
Tender Documents • 1.05 MB
Corrigendum-IIPkgII.pdf
PDF • 0.19 MB
Signage Plan_Signage Plan_290 to 330.500.pdf
PDF • 8.18 MB
Signage Plan_Signage Plan_330.500 to 370.pdf
PDF • 4.48 MB
Signage Plan_Signage Plan_370 to 415.500.pdf
PDF • 3.72 MB
Signage Plan_Signage Plan_415.500 to 450.00.pdf
PDF • 3.69 MB
Signage Plan_Signage Plan_450 to 486.pdf
PDF • 5.19 MB
Signage Plan_Signage Plan_486 to 512.pdf
PDF • 3.16 MB
COR-1.pdf
PDF • 1.65 MB
DPR Report.pdf
PDF • 46.00 MB
Drainage P&P_Drainage P&P_Km 290 to Km 330.500.pdf
PDF • 7.08 MB
Drainage P&P_Drainage P&P_Km 330.500 to Km 370.pdf
PDF • 5.60 MB
Drainage P&P_Drainage P&P_Km 370 to Km 415.500.pdf
PDF • 5.63 MB
Drainage P&P_Drainage P&P_Km 415.500 to Km 450.pdf
PDF • 3.19 MB
Drainage P&P_Drainage P&P_Km 450 to Km 486.pdf
PDF • 9.26 MB
Drainage P&P_Drainage P&P_Km 486 to Km 512.pdf
PDF • 5.57 MB
KMLs_Section 1_Ahilyanagar_Hasapur.kmz
PDF • 2.06 MB
KMLs_Section 2.kmz
PDF • 0.06 MB
Revised GADs_01_MJB_324377_MJB_DRG_GAD_R2.pdf
PDF • 0.91 MB
Revised GADs_01_MJB_327524_MJB_DRG_GAD_R2.pdf
PDF • 0.88 MB
Revised GADs_01_MJB_334104_MJB_DRG_GAD_R2.pdf
PDF • 1.10 MB
Revised GADs_01_MJB_352589_MJB_DRG_GAD_R2.pdf
PDF • 0.85 MB
Revised GADs_01_MJB_373100_MJB_DRG_GAD_R2.pdf
PDF • 0.80 MB
Revised GADs_01_MJB_378979_MJB_DRG_GAD_R2.pdf
PDF • 1.19 MB
Revised GADs_01_MJB_395987_MJB_DRG_GAD_R2.pdf
PDF • 0.76 MB
Revised GADs_01_MJB_398119_MJB_DRG_GAD_R2.pdf
PDF • 0.76 MB
Revised GADs_01_MJB_406293_MJB_DRG_GAD_R2.pdf
PDF • 0.79 MB
Revised GADs_01_MJB_410573_MJB_DRG_GAD_R2.pdf
PDF • 0.65 MB
Revised GADs_01_MJB_412232_MJB_DRG_GAD_R2.pdf
PDF • 0.73 MB
Revised GADs_01_MJB_422195_MJB_DRG_GAD_R2.pdf
PDF • 0.70 MB
Revised GADs_01_MJB_436155_MJB_DRG_GAD_R2.pdf
PDF • 1.59 MB
Revised GADs_01_MJB_450421_MJB_DRG_GAD_R2.pdf
PDF • 0.74 MB
Revised GADs_01_MJB_469032_MJB_DRG_GAD_R2.pdf
PDF • 0.85 MB
Revised GADs_01_MJB_475385_MJB_DRG_GAD_R2.pdf
PDF • 0.74 MB
Revised GADs_02_MIB_MIB GIRDER_1127_MIB_DRG_GAD_R2.pdf
PDF • 0.77 MB
Revised GADs_02_MIB_MIB GIRDER_1250_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
Revised GADs_02_MIB_MIB GIRDER_1530_MIB_GAD_DRG_R2.pdf
PDF • 0.84 MB
Revised GADs_02_MIB_MIB GIRDER_1632_MIB_GAD_DRG.pdf_INT.pdf
PDF • 0.50 MB
Revised GADs_02_MIB_MIB GIRDER_291103_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
Revised GADs_02_MIB_MIB GIRDER_291638_MIB_DRG_GAD_R2.pdf
PDF • 0.98 MB
Revised GADs_02_MIB_MIB GIRDER_297187_MIB_DRG_GAD_R2.pdf
PDF • 0.54 MB
Revised GADs_02_MIB_MIB GIRDER_303711_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
Revised GADs_02_MIB_MIB GIRDER_327824_MIB_DRG_GAD_R2_.pdf
PDF • 0.42 MB
Revised GADs_02_MIB_MIB GIRDER_334208_MIB_DRG_GAD_R2.pdf
PDF • 0.61 MB
Revised GADs_02_MIB_MIB GIRDER_334895_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_02_MIB_MIB GIRDER_336388_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
Revised GADs_02_MIB_MIB GIRDER_337190_MIB_DRG_GAD_R2.pdf
PDF • 0.83 MB
Revised GADs_02_MIB_MIB GIRDER_339049_MIB_DRG_GAD_R2.pdf
PDF • 0.81 MB
Revised GADs_02_MIB_MIB GIRDER_339563_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
Revised GADs_02_MIB_MIB GIRDER_340855_MIB_DRG_GAD_R2.pdf
PDF • 0.77 MB
Revised GADs_02_MIB_MIB GIRDER_341307_MIB_DRG_GAD_R2.pdf
PDF • 0.50 MB
Revised GADs_02_MIB_MIB GIRDER_341589_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
Revised GADs_02_MIB_MIB GIRDER_342060_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
Revised GADs_02_MIB_MIB GIRDER_343407_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
Revised GADs_02_MIB_MIB GIRDER_343801_MIB_DRG_GAD_R2.pdf
PDF • 0.65 MB
Revised GADs_02_MIB_MIB GIRDER_348856_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
Revised GADs_02_MIB_MIB GIRDER_353343_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_02_MIB_MIB GIRDER_354815_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
Revised GADs_02_MIB_MIB GIRDER_357531_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
Revised GADs_02_MIB_MIB GIRDER_362387_MIB_DRG_GAD_R2.pdf
PDF • 0.70 MB
Revised GADs_02_MIB_MIB GIRDER_363064_MIB_DRG_GAD_R2.pdf
PDF • 0.57 MB
Revised GADs_02_MIB_MIB GIRDER_364888_MIB_DRG_GAD_R2.pdf
PDF • 0.74 MB
Revised GADs_02_MIB_MIB GIRDER_376349_MIB_DRG_GAD_R2.pdf
PDF • 0.53 MB
Revised GADs_02_MIB_MIB GIRDER_380032_MIB_DRG_GAD_R2.pdf
PDF • 0.70 MB
Revised GADs_02_MIB_MIB GIRDER_381839_MIB_DRG_GAD_R2.pdf
PDF • 0.74 MB
Revised GADs_02_MIB_MIB GIRDER_382614_MIB_DRG_GAD_R2.pdf
PDF • 0.99 MB
Revised GADs_02_MIB_MIB GIRDER_388480_MIB_DRG_GAD_R2.pdf
PDF • 0.57 MB
Revised GADs_02_MIB_MIB GIRDER_390711_MIB_DRG_GAD_R2.pdf
PDF • 0.56 MB
Revised GADs_02_MIB_MIB GIRDER_392060_MIB_DRG_GAD_R2.pdf
PDF • 1.10 MB
Revised GADs_02_MIB_MIB GIRDER_392145_MIB_DRG_GAD_R2.pdf
PDF • 0.56 MB
Revised GADs_02_MIB_MIB GIRDER_392418_MIB_DRG_GAD_R2.pdf
PDF • 0.46 MB
Revised GADs_02_MIB_MIB GIRDER_393932_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
Revised GADs_02_MIB_MIB GIRDER_394045_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
Revised GADs_02_MIB_MIB GIRDER_396494_MIB_DRG_GAD_R2.pdf
PDF • 0.67 MB
Revised GADs_02_MIB_MIB GIRDER_399292_MIB_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_02_MIB_MIB GIRDER_409379_MIB_DRG_GAD_R2.pdf
PDF • 0.84 MB
Revised GADs_02_MIB_MIB GIRDER_412382_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
Revised GADs_02_MIB_MIB GIRDER_415590_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
Revised GADs_02_MIB_MIB GIRDER_417009_MIB_DRG_GAD_R2.pdf
PDF • 1.12 MB
Revised GADs_02_MIB_MIB GIRDER_418131_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
Revised GADs_02_MIB_MIB GIRDER_421973_MIB_DRG_GAD_R2.pdf
PDF • 0.70 MB
Revised GADs_02_MIB_MIB GIRDER_422664_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
Revised GADs_02_MIB_MIB GIRDER_427461_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
Revised GADs_02_MIB_MIB GIRDER_427757_MIB_DRG_GAD_R2.pdf
PDF • 0.50 MB
Revised GADs_02_MIB_MIB GIRDER_431139_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
Revised GADs_02_MIB_MIB GIRDER_431564_MIB_DRG_GAD_R2.pdf
PDF • 0.47 MB
Revised GADs_02_MIB_MIB GIRDER_433580_MIB_DRG_GAD_R2.pdf
PDF • 0.98 MB
Revised GADs_02_MIB_MIB GIRDER_433830_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
Revised GADs_02_MIB_MIB GIRDER_434314_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.56 MB
Revised GADs_02_MIB_MIB GIRDER_435028_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
Revised GADs_02_MIB_MIB GIRDER_435906_MIB_DRG_GAD_R2.pdf
PDF • 1.13 MB
Revised GADs_02_MIB_MIB GIRDER_438355_MIB_DRG_GAD_R2.pdf
PDF • 0.61 MB
Revised GADs_02_MIB_MIB GIRDER_438974_MIB_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_02_MIB_MIB GIRDER_442383_MIB_DRG_GAD_R2.pdf
PDF • 0.53 MB
Revised GADs_02_MIB_MIB GIRDER_443305_MIB_DRG_GAD_R2.pdf
PDF • 0.76 MB
Revised GADs_02_MIB_MIB GIRDER_443690_MIB_DRG_GAD_R2.pdf
PDF • 0.59 MB
Revised GADs_02_MIB_MIB GIRDER_449424_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
Revised GADs_02_MIB_MIB GIRDER_451072_MIB_DRG_GAD_R2.pdf
PDF • 0.69 MB
Revised GADs_02_MIB_MIB GIRDER_453620_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
Revised GADs_02_MIB_MIB GIRDER_456353_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.79 MB
Revised GADs_02_MIB_MIB GIRDER_458076_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.63 MB
Revised GADs_02_MIB_MIB GIRDER_458195_MIB_DRG_GAD_R2.pdf
PDF • 0.61 MB
Revised GADs_02_MIB_MIB GIRDER_458821_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
Revised GADs_02_MIB_MIB GIRDER_461558_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.51 MB
Revised GADs_02_MIB_MIB GIRDER_464184_MIB_DRG_GAD_R2.pdf
PDF • 0.75 MB
Revised GADs_02_MIB_MIB GIRDER_469675_MIB_DRG_GAD_R2.pdf
PDF • 0.99 MB
Revised GADs_02_MIB_MIB GIRDER_471708_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
Revised GADs_02_MIB_MIB GIRDER_472665_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_02_MIB_MIB GIRDER_475066_MIB_DRG_GAD_R2.pdf
PDF • 0.69 MB
Revised GADs_02_MIB_MIB GIRDER_476823_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_02_MIB_MIB GIRDER_482406_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.59 MB
Revised GADs_02_MIB_MIB GIRDER_482690_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
Revised GADs_02_MIB_MIB GIRDER_484327_MIB_DRG_GAD_R2.pdf
PDF • 0.45 MB
Revised GADs_02_MIB_MIB GIRDER_485258_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
Revised GADs_02_MIB_MIB GIRDER_486240_MIB_DRG_GAD_R2.pdf
PDF • 0.59 MB
Revised GADs_02_MIB_MIB GIRDER_487775_MIB_DRG_GAD_R2.pdf
PDF • 0.48 MB
Revised GADs_02_MIB_MIB GIRDER_489285_MIB_DRG_GAD_R2.pdf
PDF • 0.43 MB
Revised GADs_02_MIB_MIB GIRDER_489603_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
Revised GADs_02_MIB_MIB GIRDER_491533_MIB_DRG_GAD_R2.pdf
PDF • 0.79 MB
Revised GADs_02_MIB_MIB GIRDER_493302_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_02_MIB_MIB GIRDER_494645_MIB_DRG_GAD_R2.pdf
PDF • 0.54 MB
Revised GADs_02_MIB_MIB GIRDER_495540_MIB_DRG_GAD_R3.pdf
PDF • 0.54 MB
Revised GADs_02_MIB_MIB GIRDER_495742_MIB_DRG_GAD_R2.pdf
PDF • 0.64 MB
Revised GADs_02_MIB_MIB GIRDER_496818_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
Revised GADs_02_MIB_MIB GIRDER_498569_MIB_DRG_GAD_R2.pdf
PDF • 0.73 MB
Revised GADs_02_MIB_MIB GIRDER_498993_MIB_DRG_GAD_R2.pdf
PDF • 0.55 MB
Revised GADs_02_MIB_MIB GIRDER_501541_MIB_GAD_DRG_R2.pdf
PDF • 0.55 MB
Revised GADs_04_PORTAL FRAME_PIPE LINE_309800_PF-PL_DRG_GAD_R2.pdf
PDF • 0.44 MB
Revised GADs_04_PORTAL FRAME_PIPE LINE_402800_P-PL_DRG_GAD_R2.pdf
PDF • 0.31 MB
Revised GADs_04_PORTAL FRAME_PIPE LINE_408454_PF-PL_DRG_GAD_R2.pdf
PDF • 0.48 MB
Revised GADs_04_PORTAL FRAME_PIPE LINE_428976_PF-PL_DRG_GAD_R2.pdf
PDF • 0.25 MB
Revised GADs_04_PORTAL FRAME_PIPE LINE_435823_PF-PL_DRG_GAD_R2.pdf
PDF • 0.24 MB
Revised GADs_06_BC_BC TABLE_R1.pdf
PDF • 0.81 MB
Revised GADs_06_BC_TYP_BC_DRG_GAD_R2.pdf
PDF • 27.36 MB
Revised GADs_07_HPC_TYP_HPC_DRG_GAD_R2.pdf
PDF • 4.56 MB
Revised GADs_08_MISC_1_RET_DRG_GAD_R2.pdf
PDF • 0.38 MB
Revised GADs_08_MISC_2_MISC_DRG_GAD_R2.pdf
PDF • 0.21 MB
Revised GADs_GS_10_AOP_448420__AOP_DRG_GAD_R2.pdf
PDF • 0.59 MB
Revised GADs_GS_11_BS_TABLE R2.pdf
PDF • 0.24 MB
Revised GADs_GS_11_BS_TYP_BS_DRG_GAD_R2.pdf
PDF • 8.99 MB
Revised GADs_GS_12_UP CUM CULVERT_329993_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.47 MB
Revised GADs_GS_12_UP CUM CULVERT_350402_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_GS_12_UP CUM CULVERT_372676_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.51 MB
Revised GADs_GS_12_UP CUM CULVERT_378196_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_GS_12_UP CUM CULVERT_380618_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_GS_12_UP CUM CULVERT_397156_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.54 MB
Revised GADs_GS_1_ROB_391600_ROB_DRG_GAD.pdf
PDF • 1.26 MB
Revised GADs_GS_1_ROB_421282_GAD_R2.pdf
PDF • 1.28 MB
Revised GADs_GS_1_ROB_470768_ROB_DRG_GAD_R2.pdf
PDF • 0.75 MB
Revised GADs_GS_2_INTERCHANGES_R3_488921_VOP_DRG_GAD_R1.pdf
PDF • 0.56 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-348345-1415_VUP_GAD_R3.pdf
PDF • 0.71 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-348345-347901_VUP_GAD_R3.pdf
PDF • 0.61 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-348345-348345_VUP_GAD_R3.pdf
PDF • 1.01 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-420293-1434_VUP_GAD_R3.pdf
PDF • 0.71 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-420293-420295_VUP_GAD_R3.pdf
PDF • 0.98 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-420293-420895_VUP_GAD_R3.pdf
PDF • 0.57 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-469456-1357_VUP_GAD_R3.pdf
PDF • 0.70 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-469456-469456_VUP_GAD_R3.pdf
PDF • 0.90 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-469456-470078_VUP_GAD_R3.pdf
PDF • 0.58 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT-488224-488224_VUP_GAD_R3.pdf
PDF • 0.92 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT_520(CR)_INT_VUP_GAD_R1.pdf
PDF • 0.58 MB
Revised GADs_GS_2_INTERCHANGES_R3_DT_775(CR)_INT_VUP_GAD_1X30.pdf
PDF • 0.35 MB
Revised GADs_GS_3_VOP_290455_VOP_DRG_R1_RSK_30d.pdf
PDF • 0.48 MB
Revised GADs_GS_3_VOP_295228_VOP_DRG_GAD_R2.pdf
PDF • 0.48 MB
Revised GADs_GS_3_VOP_296196_VOP_DRG_GAD_R2.pdf
PDF • 0.48 MB
Revised GADs_GS_3_VOP_338036_VOP_DRG_GAD_R2.pdf
PDF • 0.50 MB
Revised GADs_GS_3_VOP_356316_VOP_DRG_GAD_R2.pdf
PDF • 0.50 MB
Revised GADs_GS_3_VOP_360592_VOP_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_GS_3_VOP_368583_VOP_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_GS_3_VOP_495018_VOP_DRG_GAD_R2.pdf
PDF • 0.27 MB
Revised GADs_GS_3_VOP_498002-VOP_DRG_GAD_R2.pdf
PDF • 0.27 MB
Revised GADs_GS_4_VUP_299158_VUP_DRG_GAD_R2.pdf
PDF • 0.65 MB
Revised GADs_GS_4_VUP_327906_VUP_DRG_GAD_R3.pdf
PDF • 0.77 MB
Revised GADs_GS_4_VUP_363635_VUP_DRG_GAD_R3.pdf
PDF • 0.86 MB
Revised GADs_GS_4_VUP_384469_VUP_DRG_GAD_R3.pdf
PDF • 0.63 MB
Revised GADs_GS_4_VUP_408716_VUP_DRG_GAD_R3.pdf
PDF • 0.83 MB
Revised GADs_GS_4_VUP_416316_VUP_DRG_GAD_R3.pdf
PDF • 0.62 MB
Revised GADs_GS_4_VUP_436829_VUP_DRG_GAD_R2.pdf
PDF • 0.56 MB
Revised GADs_GS_4_VUP_444946_VUP_DRG_GAD_R3.pdf
PDF • 0.78 MB
Revised GADs_GS_5_VIADUCT_309100-309700_VD_DRG-GAD_R2.pdf
PDF • 1.50 MB
Revised GADs_GS_5_VIADUCT_311550-313100_VD_DRG_GAD_R2.pdf
PDF • 2.75 MB
Revised GADs_GS_5_VIADUCT_313680-314230_VD_DRG_GAD_R0.pdf
PDF • 1.35 MB
Revised GADs_GS_6_LVUP_LVUP_1X12 FOR MAIN LOOP.pdf
PDF • 0.50 MB
Revised GADs_GS_6_LVUP_TABLE R2.pdf
PDF • 0.06 MB
Revised GADs_GS_6_LVUP_TYP_LVUP_DRG_GAD_R2.pdf
PDF • 4.39 MB
Revised GADs_GS_7_LVUP CUM CULVERT_301732_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.54 MB
Revised GADs_GS_7_LVUP CUM CULVERT_322868_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 1.01 MB
Revised GADs_GS_7_LVUP CUM CULVERT_370227_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.75 MB
Revised GADs_GS_7_LVUP CUM CULVERT_374966_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.55 MB
Revised GADs_GS_7_LVUP CUM CULVERT_376806_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_GS_7_LVUP CUM CULVERT_378856_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.89 MB
Revised GADs_GS_7_LVUP CUM CULVERT_382796_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.61 MB
Revised GADs_GS_7_LVUP CUM CULVERT_386828_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.56 MB
Revised GADs_GS_7_LVUP CUM CULVERT_395036_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.61 MB
Revised GADs_GS_7_LVUP CUM CULVERT_402898_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_GS_7_LVUP CUM CULVERT_409462_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.53 MB
Revised GADs_GS_7_LVUP CUM CULVERT_422817_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.75 MB
Revised GADs_GS_7_LVUP CUM CULVERT_430238_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.93 MB
Revised GADs_GS_7_LVUP CUM CULVERT_431684_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
Revised GADs_GS_7_LVUP CUM CULVERT_432743_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.89 MB
Revised GADs_GS_7_LVUP CUM CULVERT_439587_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.65 MB
Revised GADs_GS_7_LVUP CUM CULVERT_442064_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.65 MB
Revised GADs_GS_7_LVUP CUM CULVERT_457573_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.66 MB
Revised GADs_GS_7_LVUP CUM CULVERT_468239_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.52 MB
Revised GADs_GS_7_LVUP CUM CULVERT_492549_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.53 MB
Revised GADs_GS_7_LVUP CUM CULVERT_508097_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.50 MB
Revised GADs_GS_9_AUP_470900_AUP_DRG_GAD_R2.pdf
PDF • 0.65 MB
Revised GADs_GS_9_AUP_478600_AUP_DRG_GAD_R2.pdf
PDF • 0.57 MB
Revised GADs_GS_9_AUP_497250_DRG_GAD_R2.pdf
PDF • 0.53 MB
Revised GADs_GS_9_AUP_499900_AUP_DRG_GAD_R2.pdf
PDF • 0.58 MB
Revised GADs_GS_9_AUP_502051_DRG_GAD_R2.pdf
PDF • 0.68 MB
Revised Plan & Profile_Interchange Drawings.pdf
PDF • 42.78 MB
Revised Plan & Profile_PPD_Km 290 to Km 330.500.pdf
PDF • 7.26 MB
Revised Plan & Profile_PPD_Km 330.50 to Km 370.00.pdf
PDF • 4.06 MB
Revised Plan & Profile_PPD_Km 370.00 to Km 415.500.pdf
PDF • 4.65 MB
Revised Plan & Profile_PPD_Km 415.50 to Km 450.00.pdf
PDF • 5.25 MB
Revised Plan & Profile_PPD_Km 450.00 to Km 486.00.pdf
PDF • 4.32 MB
Revised Plan & Profile_PPD_Km 486.00 to Km 512.00.pdf
PDF • 3.35 MB
Revised Plan & Profile_SR PPD.pdf
PDF • 1.95 MB
Revised Utility Relocation Plan_Utility Relocation Plan-Km 450 to Km 486.pdf
PDF • 22.55 MB
Revised Utility Relocation Plan_Utility Relocation Plan_Km 290 to Km 330.500.pdf
PDF • 24.97 MB
Revised Utility Relocation Plan_Utility Relocation Plan_Km 330.500 to Km 370.pdf
PDF • 27.67 MB
Revised Utility Relocation Plan_Utility Relocation Plan_Km 370 to Km 415.500.pdf
PDF • 26.61 MB
Revised Utility Relocation Plan_Utility Relocation Plan_Km 415.500 to Km 450.pdf
PDF • 22.46 MB
Revised Utility Relocation Plan_Utility Relocation Plan_Km 486 to Km 512.pdf
PDF • 19.48 MB
PREBID.pdf
PDF • 16.22 MB
COR-1.pdf
PDF • 1.65 MB
GADPPD6.rar
PDF • 21.41 MB
GADPPD5.rar
PDF • 38.00 MB
GADPPD4.rar
PDF • 38.00 MB
GADPPD3.rar
PDF • 38.00 MB
GADPPD2.rar
PDF • 38.00 MB
Plan and Profile Drawings_Interchange Drawings.pdf
PDF • 43.21 MB
Plan and Profile Drawings_PPD_Km 290 to Km 330.500.pdf
PDF • 7.15 MB
Plan and Profile Drawings_PPD_Km 330.50 to Km 370.00.pdf
PDF • 4.06 MB
Plan and Profile Drawings_PPD_Km 370.00 to Km 415.500.pdf
PDF • 4.65 MB
Plan and Profile Drawings_PPD_Km 415.50 to Km 450.00.pdf
PDF • 4.97 MB
Plan and Profile Drawings_PPD_Km 450.00 to Km 486.00.pdf
PDF • 4.32 MB
Plan and Profile Drawings_PPD_Km 486.00 to Km 512.00.pdf
PDF • 2.85 MB
Plan and Profile Drawings_SR PPD.pdf
PDF • 1.98 MB
GADs_01_MJB_324377_MJB_DRG_GAD_R2.pdf
PDF • 0.91 MB
GADs_01_MJB_327524_MJB_DRG_GAD_R2.pdf
PDF • 0.88 MB
GADs_01_MJB_334104_MJB_DRG_GAD_R2.pdf
PDF • 1.10 MB
GADs_01_MJB_352589_MJB_DRG_GAD_R2.pdf
PDF • 0.85 MB
GADs_01_MJB_373100_MJB_DRG_GAD_R2.pdf
PDF • 0.80 MB
GADs_01_MJB_378979_MJB_DRG_GAD_R2.pdf
PDF • 1.19 MB
GADs_01_MJB_395987_MJB_DRG_GAD_R2.pdf
PDF • 0.76 MB
GADs_01_MJB_398119_MJB_DRG_GAD_R2.pdf
PDF • 0.76 MB
GADs_01_MJB_406293_MJB_DRG_GAD_R2.pdf
PDF • 0.79 MB
GADs_01_MJB_410573_MJB_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_01_MJB_412232_MJB_DRG_GAD_R2.pdf
PDF • 0.73 MB
GADs_01_MJB_422195_MJB_DRG_GAD_R2.pdf
PDF • 0.70 MB
GADs_01_MJB_436155_MJB_DRG_GAD_R2.pdf
PDF • 1.59 MB
GADs_01_MJB_450421_MJB_DRG_GAD_R2.pdf
PDF • 0.74 MB
GADs_01_MJB_469032_MJB_DRG_GAD_R2.pdf
PDF • 0.85 MB
GADs_01_MJB_475385_MJB_DRG_GAD_R2.pdf
PDF • 0.74 MB
GADs_02_MIB_MIB GIRDER_1127_MIB_DRG_GAD_R2.pdf
PDF • 0.77 MB
GADs_02_MIB_MIB GIRDER_1250_MIB_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_02_MIB_MIB GIRDER_1530_MIB_GAD_DRG_R2.pdf
PDF • 0.84 MB
GADs_02_MIB_MIB GIRDER_291103_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
GADs_02_MIB_MIB GIRDER_291638_MIB_DRG_GAD_R2.pdf
PDF • 0.98 MB
GADs_02_MIB_MIB GIRDER_297187_MIB_DRG_GAD_R2.pdf
PDF • 0.54 MB
GADs_02_MIB_MIB GIRDER_303711_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
GADs_02_MIB_MIB GIRDER_327824_MIB_DRG_GAD_R2_.pdf
PDF • 0.42 MB
GADs_02_MIB_MIB GIRDER_334208_MIB_DRG_GAD_R2.pdf
PDF • 0.61 MB
GADs_02_MIB_MIB GIRDER_334895_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_02_MIB_MIB GIRDER_336388_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
GADs_02_MIB_MIB GIRDER_337190_MIB_DRG_GAD_R2.pdf
PDF • 0.83 MB
GADs_02_MIB_MIB GIRDER_339049_MIB_DRG_GAD_R2.pdf
PDF • 0.81 MB
GADs_02_MIB_MIB GIRDER_339563_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
GADs_02_MIB_MIB GIRDER_340855_MIB_DRG_GAD_R2.pdf
PDF • 0.77 MB
GADs_02_MIB_MIB GIRDER_341307_MIB_DRG_GAD_R2.pdf
PDF • 0.50 MB
GADs_02_MIB_MIB GIRDER_341589_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
GADs_02_MIB_MIB GIRDER_342060_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
GADs_02_MIB_MIB GIRDER_343407_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
GADs_02_MIB_MIB GIRDER_343801_MIB_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_02_MIB_MIB GIRDER_348856_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
GADs_02_MIB_MIB GIRDER_353343_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_02_MIB_MIB GIRDER_354815_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
GADs_02_MIB_MIB GIRDER_357531_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
GADs_02_MIB_MIB GIRDER_362387_MIB_DRG_GAD_R2.pdf
PDF • 0.70 MB
GADs_02_MIB_MIB GIRDER_363064_MIB_DRG_GAD_R2.pdf
PDF • 0.57 MB
GADs_02_MIB_MIB GIRDER_364888_MIB_DRG_GAD_R2.pdf
PDF • 0.74 MB
GADs_02_MIB_MIB GIRDER_376349_MIB_DRG_GAD_R2.pdf
PDF • 0.53 MB
GADs_02_MIB_MIB GIRDER_380032_MIB_DRG_GAD_R2.pdf
PDF • 0.70 MB
GADs_02_MIB_MIB GIRDER_381839_MIB_DRG_GAD_R2.pdf
PDF • 0.74 MB
GADs_02_MIB_MIB GIRDER_382614_MIB_DRG_GAD_R2.pdf
PDF • 0.99 MB
GADs_02_MIB_MIB GIRDER_388480_MIB_DRG_GAD_R2.pdf
PDF • 0.57 MB
GADs_02_MIB_MIB GIRDER_390711_MIB_DRG_GAD_R2.pdf
PDF • 0.56 MB
GADs_02_MIB_MIB GIRDER_392060_MIB_DRG_GAD_R2.pdf
PDF • 1.10 MB
GADs_02_MIB_MIB GIRDER_392145_MIB_DRG_GAD_R2.pdf
PDF • 0.56 MB
GADs_02_MIB_MIB GIRDER_392418_MIB_DRG_GAD_R2.pdf
PDF • 0.46 MB
GADs_02_MIB_MIB GIRDER_393932_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
GADs_02_MIB_MIB GIRDER_394045_MIB_DRG_GAD_R2.pdf
PDF • 0.66 MB
GADs_02_MIB_MIB GIRDER_396494_MIB_DRG_GAD_R2.pdf
PDF • 0.67 MB
GADs_02_MIB_MIB GIRDER_399292_MIB_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_02_MIB_MIB GIRDER_409379_MIB_DRG_GAD_R2.pdf
PDF • 0.84 MB
GADs_02_MIB_MIB GIRDER_412382_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
GADs_02_MIB_MIB GIRDER_415590_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
GADs_02_MIB_MIB GIRDER_417009_MIB_DRG_GAD_R2.pdf
PDF • 1.12 MB
GADs_02_MIB_MIB GIRDER_418131_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
GADs_02_MIB_MIB GIRDER_421973_MIB_DRG_GAD_R2.pdf
PDF • 0.70 MB
GADs_02_MIB_MIB GIRDER_422664_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
GADs_02_MIB_MIB GIRDER_427461_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
GADs_02_MIB_MIB GIRDER_427757_MIB_DRG_GAD_R2.pdf
PDF • 0.50 MB
GADs_02_MIB_MIB GIRDER_431139_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
GADs_02_MIB_MIB GIRDER_433580_MIB_DRG_GAD_R2.pdf
PDF • 0.98 MB
GADs_02_MIB_MIB GIRDER_433830_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
GADs_02_MIB_MIB GIRDER_435028_MIB_DRG_GAD_R2.pdf
PDF • 0.57 MB
GADs_02_MIB_MIB GIRDER_435906_MIB_DRG_GAD_R2.pdf
PDF • 1.13 MB
GADs_02_MIB_MIB GIRDER_438355_MIB_DRG_GAD_R2.pdf
PDF • 0.61 MB
GADs_02_MIB_MIB GIRDER_438974_MIB_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_02_MIB_MIB GIRDER_442383_MIB_DRG_GAD_R2.pdf
PDF • 0.56 MB
GADs_02_MIB_MIB GIRDER_443305_MIB_DRG_GAD_R2.pdf
PDF • 0.76 MB
GADs_02_MIB_MIB GIRDER_443690_MIB_DRG_GAD_R2.pdf
PDF • 0.59 MB
GADs_02_MIB_MIB GIRDER_449424_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
GADs_02_MIB_MIB GIRDER_451072_MIB_DRG_GAD_R2.pdf
PDF • 0.69 MB
GADs_02_MIB_MIB GIRDER_453620_MIB_DRG_GAD_R2.pdf
PDF • 0.62 MB
GADs_02_MIB_MIB GIRDER_458195_MIB_DRG_GAD_R2.pdf
PDF • 0.61 MB
GADs_02_MIB_MIB GIRDER_458821_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
GADs_02_MIB_MIB GIRDER_464184_MIB_DRG_GAD_R2.pdf
PDF • 0.75 MB
GADs_02_MIB_MIB GIRDER_469675_MIB_DRG_GAD_R2.pdf
PDF • 0.99 MB
GADs_02_MIB_MIB GIRDER_471708_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
GADs_02_MIB_MIB GIRDER_472665_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_02_MIB_MIB GIRDER_475066_MIB_DRG_GAD_R2.pdf
PDF • 0.69 MB
GADs_02_MIB_MIB GIRDER_476823_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_02_MIB_MIB GIRDER_482690_MIB_DRG_GAD_R2.pdf
PDF • 0.52 MB
GADs_02_MIB_MIB GIRDER_484327_MIB_DRG_GAD_R2.pdf
PDF • 0.45 MB
GADs_02_MIB_MIB GIRDER_485258_MIB_DRG_GAD_R2.pdf
PDF • 0.51 MB
GADs_02_MIB_MIB GIRDER_486240_MIB_DRG_GAD_R2.pdf
PDF • 0.59 MB
GADs_02_MIB_MIB GIRDER_487775_MIB_DRG_GAD_R2.pdf
PDF • 0.75 MB
GADs_02_MIB_MIB GIRDER_489285_MIB_DRG_GAD_R2.pdf
PDF • 0.43 MB
GADs_02_MIB_MIB GIRDER_489603_MIB_DRG_GAD_R2.pdf
PDF • 0.63 MB
GADs_02_MIB_MIB GIRDER_491533_MIB_DRG_GAD_R2.pdf
PDF • 0.79 MB
GADs_02_MIB_MIB GIRDER_493302_MIB_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_02_MIB_MIB GIRDER_494645_MIB_DRG_GAD_R2.pdf
PDF • 0.54 MB
GADs_02_MIB_MIB GIRDER_495555_MIB_DRG_GAD_R2.pdf
PDF • 0.59 MB
GADs_02_MIB_MIB GIRDER_495742_MIB_DRG_GAD_R2.pdf
PDF • 0.64 MB
GADs_02_MIB_MIB GIRDER_496818_MIB_DRG_GAD_R2.pdf
PDF • 0.60 MB
GADs_02_MIB_MIB GIRDER_497250_MIB_DRG_GAD_R2.pdf
PDF • 0.53 MB
GADs_02_MIB_MIB GIRDER_498569_MIB_DRG_GAD_R2.pdf
PDF • 0.73 MB
GADs_02_MIB_MIB GIRDER_498993_MIB_DRG_GAD_R2.pdf
PDF • 0.55 MB
GADs_02_MIB_MIB GIRDER_501557_MIB_GAD_DRG_R2.pdf
PDF • 0.63 MB
GADs_02_MIB_MIB GIRDER_502051_MIB_DRG_GAD_R2.pdf
PDF • 0.68 MB
GADs_04_PORTAL FRAME_PIPE LINE_309800_PF-PL_DRG_GAD_R2.pdf
PDF • 0.44 MB
GADs_04_PORTAL FRAME_PIPE LINE_402800_P-PL_DRG_GAD_R2.pdf
PDF • 0.31 MB
GADs_04_PORTAL FRAME_PIPE LINE_408454_PF-PL_DRG_GAD_R2.pdf
PDF • 0.48 MB
GADs_04_PORTAL FRAME_PIPE LINE_428976_PF-PL_DRG_GAD_R2.pdf
PDF • 0.25 MB
GADs_04_PORTAL FRAME_PIPE LINE_435823_PF-PL_DRG_GAD_R2.pdf
PDF • 0.24 MB
GADs_06_BC_BC TABLE_R1.pdf
PDF • 0.81 MB
GADs_06_BC_TYP_BC_DRG_GAD_R2.pdf
PDF • 27.36 MB
GADs_07_HPC_TYP_HPC_DRG_GAD_R2.pdf
PDF • 4.56 MB
GADs_08_MISC_1_RET_DRG_GAD_R2.pdf
PDF • 0.38 MB
GADs_08_MISC_2_MISC_DRG_GAD_R2.pdf
PDF • 0.21 MB
GADs_GS_10_AOP_448420__AOP_DRG_GAD_R2.pdf
PDF • 0.59 MB
GADs_GS_11_BS_TABLE R2.pdf
PDF • 0.24 MB
GADs_GS_11_BS_TYP_BS_DRG_GAD_R2.pdf
PDF • 8.99 MB
GADs_GS_12_UP CUM CULVERT_329993_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.47 MB
GADs_GS_12_UP CUM CULVERT_350402_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_GS_12_UP CUM CULVERT_372676_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.51 MB
GADs_GS_12_UP CUM CULVERT_378196_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_GS_12_UP CUM CULVERT_380618_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_GS_12_UP CUM CULVERT_397156_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.54 MB
GADs_GS_12_UP CUM CULVERT_431564_MIB_DRG_GAD_R2.pdf
PDF • 0.47 MB
GADs_GS_12_UP CUM CULVERT_434314_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.56 MB
GADs_GS_12_UP CUM CULVERT_456353_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.79 MB
GADs_GS_12_UP CUM CULVERT_458076_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.63 MB
GADs_GS_12_UP CUM CULVERT_461558_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.51 MB
GADs_GS_12_UP CUM CULVERT_482406_UP-CUL_DRG_GAD_R2.pdf
PDF • 0.59 MB
GADs_GS_1_ROB_391600_ROB_DRG_GAD.pdf
PDF • 1.26 MB
GADs_GS_1_ROB_421282_GAD_R2.pdf
PDF • 1.28 MB
GADs_GS_1_ROB_470768_ROB_DRG_GAD_R2.pdf
PDF • 0.75 MB
GADs_GS_2_INTERCHANGES_R3_488921_VOP_DRG_GAD_R1.pdf
PDF • 0.56 MB
GADs_GS_2_INTERCHANGES_R3_DT-348345-1415_VUP_GAD_R3.pdf
PDF • 0.71 MB
GADs_GS_2_INTERCHANGES_R3_DT-348345-347901_VUP_GAD_R3.pdf
PDF • 0.61 MB
GADs_GS_2_INTERCHANGES_R3_DT-348345-348345_VUP_GAD_R3.pdf
PDF • 1.01 MB
GADs_GS_2_INTERCHANGES_R3_DT-420293-1434_VUP_GAD_R3.pdf
PDF • 0.71 MB
GADs_GS_2_INTERCHANGES_R3_DT-420293-420295_VUP_GAD_R3.pdf
PDF • 0.98 MB
GADs_GS_2_INTERCHANGES_R3_DT-420293-420895_VUP_GAD_R3.pdf
PDF • 0.57 MB
GADs_GS_2_INTERCHANGES_R3_DT-469456-1357_VUP_GAD_R3.pdf
PDF • 0.70 MB
GADs_GS_2_INTERCHANGES_R3_DT-469456-469456_VUP_GAD_R3.pdf
PDF • 0.90 MB
GADs_GS_2_INTERCHANGES_R3_DT-469456-470078_VUP_GAD_R3.pdf
PDF • 0.58 MB
GADs_GS_2_INTERCHANGES_R3_DT-488224-488224_VUP_GAD_R3.pdf
PDF • 0.92 MB
GADs_GS_2_INTERCHANGES_R3_DT_520(CR)_INT_VUP_GAD_R1.pdf
PDF • 0.58 MB
GADs_GS_2_INTERCHANGES_R3_DT_775(CR)_INT_VUP_GAD_1X30.pdf
PDF • 0.35 MB
GADs_GS_3_VOP_290455_VOP_DRG_R1_RSK_30d.pdf
PDF • 0.48 MB
GADs_GS_3_VOP_295228_VOP_DRG_GAD_R2.pdf
PDF • 0.48 MB
GADs_GS_3_VOP_296196_VOP_DRG_GAD_R2.pdf
PDF • 0.48 MB
GADs_GS_3_VOP_338036_VOP_DRG_GAD_R2.pdf
PDF • 0.50 MB
GADs_GS_3_VOP_356316_VOP_DRG_GAD_R2.pdf
PDF • 0.50 MB
GADs_GS_3_VOP_360592_VOP_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_GS_3_VOP_368583_VOP_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_GS_3_VOP_446395_VOP_DRG_R0.pdf
PDF • 0.51 MB
GADs_GS_3_VOP_495018_VOP_DRG_GAD_R2.pdf
PDF • 0.27 MB
GADs_GS_3_VOP_498002-VOP_DRG_GAD_R2.pdf
PDF • 0.27 MB
GADs_GS_4_VUP_299158_VUP_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_GS_4_VUP_327906_VUP_DRG_GAD_R3.pdf
PDF • 0.77 MB
GADs_GS_4_VUP_363635_VUP_DRG_GAD_R3.pdf
PDF • 0.86 MB
GADs_GS_4_VUP_384469_VUP_DRG_GAD_R3.pdf
PDF • 0.63 MB
GADs_GS_4_VUP_408716_VUP_DRG_GAD_R3.pdf
PDF • 0.83 MB
GADs_GS_4_VUP_416316_VUP_DRG_GAD_R3.pdf
PDF • 0.62 MB
GADs_GS_4_VUP_436829_VUP_DRG_GAD_R2.pdf
PDF • 0.56 MB
GADs_GS_4_VUP_444946_VUP_DRG_GAD_R3.pdf
PDF • 0.78 MB
GADs_GS_5_VIADUCT_309100-309700_VD_DRG-GAD_R2.pdf
PDF • 1.50 MB
GADs_GS_5_VIADUCT_311550-313100_VD_DRG_GAD_R2.pdf
PDF • 2.75 MB
GADs_GS_5_VIADUCT_313680-314230_VD_DRG_GAD_R0.pdf
PDF • 1.35 MB
GADs_GS_6_LVUP_LVUP_1X12 FOR MAIN LOOP.pdf
PDF • 0.50 MB
GADs_GS_6_LVUP_TYP_LVUP_DRG_GAD_R2.pdf
PDF • 4.39 MB
GADs_GS_7_LVUP CUM CULVERT_301732_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.54 MB
GADs_GS_7_LVUP CUM CULVERT_322868_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 1.01 MB
GADs_GS_7_LVUP CUM CULVERT_370227_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.75 MB
GADs_GS_7_LVUP CUM CULVERT_374966_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.55 MB
GADs_GS_7_LVUP CUM CULVERT_376806_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.58 MB
GADs_GS_7_LVUP CUM CULVERT_378856_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.89 MB
GADs_GS_7_LVUP CUM CULVERT_382796_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.61 MB
GADs_GS_7_LVUP CUM CULVERT_386828_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.56 MB
GADs_GS_7_LVUP CUM CULVERT_395036_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.61 MB
GADs_GS_7_LVUP CUM CULVERT_402898_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_GS_7_LVUP CUM CULVERT_409462_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.53 MB
GADs_GS_7_LVUP CUM CULVERT_422817_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.75 MB
GADs_GS_7_LVUP CUM CULVERT_430238_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.93 MB
GADs_GS_7_LVUP CUM CULVERT_431684_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.49 MB
GADs_GS_7_LVUP CUM CULVERT_432743_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.89 MB
GADs_GS_7_LVUP CUM CULVERT_439587_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_GS_7_LVUP CUM CULVERT_442064_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_GS_7_LVUP CUM CULVERT_455773_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.54 MB
GADs_GS_7_LVUP CUM CULVERT_457573_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.66 MB
GADs_GS_7_LVUP CUM CULVERT_468239_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.52 MB
GADs_GS_7_LVUP CUM CULVERT_492549_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.53 MB
GADs_GS_7_LVUP CUM CULVERT_508097_LVUP-CUL_DRG_GAD_R2.pdf
PDF • 0.50 MB
GADs_GS_9_AUP_470900_AUP_DRG_GAD_R2.pdf
PDF • 0.65 MB
GADs_GS_9_AUP_478600_AUP_DRG_GAD_R2.pdf
PDF • 0.57 MB
GADs_GS_9_AUP_499900_AUP_DRG_GAD_R2.pdf
PDF • 0.58 MB
TCS Drawings_P-II.pdf
PDF • 2.46 MB
Geotech Report_Geotech Report_Km 290 to Km 330.500.pdf
PDF • 1.35 MB
Geotech Report_Geotech Report_Km 330.500 to Km 370.pdf
PDF • 3.21 MB
Geotech Report_Geotech Report_Km 370 to Km 415.500.pdf
PDF • 3.26 MB
Geotech Report_Geotech Report_Km 415.500 to Km 450.pdf
PDF • 3.66 MB
Geotech Report_Geotech Report_Km 450 to Km 486.pdf
PDF • 6.84 MB
Geotech Report_Geotech Report_Km 486 to Km 512.pdf
PDF • 4.75 MB
Hydrology Report_Hydrology Report.pdf
PDF • 32.00 MB
Technical Schedule_Technical Schedules _Package-2_08.05.26.pdf
PDF • 5.63 MB
URPs_Utility Relocation Plan-Km 450 to Km 486.pdf
PDF • 26.40 MB
URPs_Utility Relocation Plan_Km 290 to Km 330.500.pdf
PDF • 27.80 MB
URPs_Utility Relocation Plan_Km 330.500 to Km 370.pdf
PDF • 28.94 MB
URPs_Utility Relocation Plan_Km 370 to Km 415.500.pdf
PDF • 29.87 MB
URPs_Utility Relocation Plan_Km 415.500 to Km 450.pdf
PDF • 25.28 MB
URPs_Utility Relocation Plan_Km 486 to Km 512.pdf
PDF • 19.46 MB
01 Horizontal Alignment Report ASA Road_Km 290+000 to Km 512+000.xls
PDF • 0.03 MB
04. Vertical Report_Km 290+000 to Km 512+000.xls
PDF • 0.15 MB
TDpart04.rar
PDF • 38.00 MB
TDpart03.rar
PDF • 38.00 MB
TDpart02.rar
PDF • 38.00 MB
TDpart01.rar
PDF • 38.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].