Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹4.9 L+₹17,611.66 (3.75%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹5.0 L+₹29,352.76 (6.25%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹5.0 L+₹29,352.76 (6.25%)Rejected-Finance | L4 | Rejected-Finance L4 Bidder |
Tender Value
₹5.9 L
EMD Value
₹58,706
Closing Date
31 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Improvement work using cement concrete on the lane near Everest Dry Cleaners, located in Gandhinagar under Ward-49, Zone-04.
2026_NNKAN_1201990_1
832/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-49
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹58,706
17 Nov 2026
28 Oct 2026
31 Oct 2026
28 Oct 2026
31 Oct 2026
28 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 264 | sqm | 67 | ₹17,688 |
| 2 | Earth Work-E/W in Excavation in trenches for foundation pipe cable in ordinary soil including 1.5left and 50m and dressing of side and ramming of bottom and disposal of surplus axcavated earth Earth work in execavation in foundation and under plinth area lift 1.5 m lead 30 m with all charges complete. | 22.38 | cum | 174 | ₹3,893.25 |
| 3 | Concrete/R.C.C. Work-4.1.8 Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm (nominal size) | 5.45 | cum | 5,740 | ₹31,283 |
| 4 | Providing and laying and jointing of 300mm dia RCC NP-2 hume pipe with all complete Providing and laying and jointing of 300mm dia RCC NP-2 hume pipe with all complete | 10 | rmt | 771.1 | ₹7,711 |
| 5 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment) | 110 | rmt | 458 | ₹50,380 |
| 6 | Concrete/R.C.C. Work-Construction of granual sub base (GSB) with well graded materails in uniform layer etc all complete. Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401 | 26.4 | cum | 3,676 | ₹97,046.4 |
| 7 | Concrete/R.C.C. Work-Concrete /R.C.C Work 1:1½:3 (1 Cement: 1½ coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size) | 31.68 | cum | 7,160 | ₹2,26,828.8 |
| 8 | Providing chemical hardner for hard surface etc all comp. Extra Providing chemical hardner for hard surface etc all comp.- | 264 | sqm | 96.25 | ₹25,410 |
| 9 | Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work. | 6 | each | 704 | ₹4,224 |
| 10 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. | 2 | each | 7,464 | ₹14,928 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_2274817.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.43 MB
BOQ_2274817.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .