| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC F301 LADO SARAI NEAR QUTUB MINAR NEW DELHI 110030 | SOUTH | DELHI | 110030 | ₹2.0 L | L1 | Accepted-AOC Order awarded |
| 2 | L2₹2.0 LRejected-Finance | ₹2.0 L | L2 | Rejected-Finance Price is Higher than L1 |
| 3 | L3₹2.0 LRejected-Finance | ₹2.0 L | L3 | Rejected-Finance Price is Higher than other two Bidders |
| 4 | Rejected-Technical VILLAGE TUNDLA P O DEORI TEHSIL SADAR DISTT MANDI 175124 | MANDI | MANDI | HIMACHAL PRADESH | 175124 | - | - | Rejected-Technical Tender cost and Latest ITR not given |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
16 Mar 2020, 4:00 pmClosed
Commandant-160 BN CRPF
HQ/160 BN CRPF, Chatha, Jammu
Septic Tank for newly constructed 3 Rooms set at Barnai Camp Jammu
2020_CRPF_547017_1
B.V-83(674)/2018-19-160-Q(SRE)
Limited
Construction Works
Works
60 days
Barnai Camp
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Commandant-160 BN CRPF, Jammu
₹4,000
Yes
22 May 2020
22 Feb 2020
17 Mar 2020
22 Feb 2020
16 Mar 2020
22 Feb 2020
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5 m, as directed by Engineer-in-charge All kind of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 1:3:6(1 cement: 3 coarse: sand (zone-III): 6 graded stone aggregate 40 mm nominal size)
Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and size in: Cement mortar 1:6(1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4(1 cement : 4 coarse sand)
12 mm cement plaster finished with a floating coat of neat cement of mix: 1:4(1 cement : 4 fine sand)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15º landing, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III):3 graded stone aggregate 20 mm nominal size
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500 D or more. (12 mm = 110 kg, 10 mm = 75 kg)
Centering and shuttering including strutting propping etc. and removal of from for: Suspended floors, roofs, landings, balconies and access platform
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m.
Ajay Panotra
Sunil Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].