| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.0 LAccepted-AOC PURAINA PURE HIMANCHAL HOUSE NO 123 MALAON PARASPUR GONDA | GONDA | UTTAR PRADESH | 271001 | ₹88.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹88.1 LRejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹88.1 L | L2 | Rejected-Finance REJECTED DUE TO HIGHEST RATE QUOTED |
| 3 | Rejected-Technical SITAPUR | SITAPUR | UTTAR PRADESH | 261001 | - | - | Rejected-Technical NON ELIGIBLE FOR FINANCIAL BID OPENING |
Tender Value
₹88 L
EMD Value
₹6.4 L
Closing Date
29 Dec 2025, 12:00 pmClosed
SE AYO AMBE CIRCLE, PWD, AYODHYA
O/O SE AYO AMBE CIRCLE, PWD, AYODHYA
Construction of Atarsuiya Banda to Umrahara Link Road With 5 Year Maintenance Charges
2025_CEUFZ_1100952_5
7462/3kam ayo ambe/ E-tendering/2025 date 17-12-2025
Open Tender
Civil Works - Roads
180 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.4 L
Yes
O/O SE AYO AMBE CIRCLE, PWD, AYODHYA
31 Jan 2026
23 Dec 2025
29 Dec 2025
23 Dec 2025
29 Dec 2025
23 Dec 2025
27 Dec 2025
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of granular sub-base (Grading-I) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical specification clause 405
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405
Brick edging on both side of road of 1st class brick 8 cm. (3") wide and 12 cm. (4.5) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour, T&P sudries required for proper completion of work material.(SOR 765)
Providing and applying primer coat with bitumen emulsion (SS2) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical specifications Clause 502
Providing and applying tack coat with bitumen VG-10 at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a mixall, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. but in patri
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Nominal mix 1:3:6)
Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (Brick masonry in 1:3 cement mortar)
Providing and laying reinforced cement conrete pipe (900mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.
Providing and laying reinforced cement conrete pipe (350mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (without Machinary)
Providing and laying 1000 mm reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Providing & fixing of sign Board etc. complete
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 23)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 23)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 23)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 23)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 23)
Note- GST will be paid extra for above all items as per Govt. Norms.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
Tendernotice_2.pdf
PDF • 0.56 MB
BOQ_2029042.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid