Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹7,500
Closing Date
11 Jun 2026, 3:00 pm3d left
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Const of culvert ani Khul NLO gh Hassan Lone and Gh Mohammad Najar others
2026_RDPR_311586_16
NIT NO 14 OF 2026-27 CDF MLA
Open Tender
Civil Works
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹7,500
5 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
5 Jun 2026 - 5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 5.18 | Cum | 256 | ₹1,326.08 |
| 2 | P/l of stone soling / RBM including all carriages.by MT10km Avg Lead | 2.35 | Cum | 1,000 | ₹2,350 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:4:8 using 40mm nominal size aggregate. | 0.58 | Cum | 5,202 | ₹3,017.16 |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1
cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% plum | 5.95 | cum | 5,733.6 | ₹34,114.92 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form
for:Foundations, footings, bases of columns etc. for mass concrete. Walls | 9.96 | Sqm | 286.4 | ₹2,852.54 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form
for:Foundations, footings, bases of columns etc. for mass concrete.suspended floor | 16.92 | Sqm | 718 | ₹12,148.56 |
| 7 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 750 | kg | 124.5 | ₹93,375 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, andings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.59 | cum | 9,821.85 | ₹74,547.84 |
| 9 | Providing and fixing of MS Railing using structural steel including coat of red oxide and painting all complete job | 100 | kg | 120 | ₹12,000 |
| 10 | Carriage of materials from source of supply to site of work 20KMS sand and bajri | 17.64 | cum | 344.5 | ₹6,076.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1008850.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid