Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
29 Jul 2024, 3:00 pmClosed
PR & CC
This Tender is floated for CIVIL BUILDING WORKS for POL facilities at KAMARDANGA, ASSAM.SITE
2400014163-HD-09050
5100014163
Open Tender
Unknown (Unspecified Location)
29 Jul 2024
8 Jul 2024
29 Jul 2024
29 Jul 2024
9 Jul 2024 - 19 Jul 2024
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCAVATION OF EARTH | EXCAVATION OF EARTH — . For foundations of Buildings, Roads, Driveways, Pedestals etc. or any other place as, in ordinary soils including soft rock/disint rated rock, in both dry and wet conditions.2. Job Includes pumping and bailing out surface and subsoil water, shoring, strutting as equired as per site condition, slush removal, including backfilling etc, in layers at all heights and depths as per drawing and spec ications wherever required and watering, compacting etc all complete as per instructions of HPCL., in foundation pits, under floors d other places with excavated suitable surplus earth, including reclaiming from spoil heaps kept elsewhere including dressing and le lling, watering and mechanical compaction etc. Including removal of vegetation, shrubs and debris, cutting and dressing of sides in opes, levelling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for sub quent works.3. Transporting surplus soil to unobjectionable place within boundary limits and spreading in layers.NoteThe measurem t for payment shall be for theoretical volume only based on initial and final levels jointly recorded and it shall be the volume of e block of the excavation having maximum bottom dimension of the foundation as per drawing. The contractor shall take into account i his rate, the provision for excess excavation for necessary working space, slope, steps etc. required for excavation, safety and oth allied works and refilling the side slopes and working space etc.Job to be completed as per attached technical specification/codal rovisions/ sound engineering practices and as directed by EIC complete.Scope also includes removal of trees, stumps and roots to fu extent, removal of all vegetation including bushes and grass, dewatering, taking spot levels @ 5 m C/C in grid pattern, levelling, essing and rolling the excavated surface, loading, transportation of surplus earth to an unobjectionable place inside the site premi s, spreading, levelling as per instructions of the engineer in charge. Job also includes backfilling of excavated earth as directed HPCL at no extra cost in excavated place like foundations, pits etc.The job to be executed as per attached technical specification job procedures etc. complete and as directed by EIC." | - | cubic meter |
| 2 | EXCAVATION OF EARTH, | EXCAVATION OF EARTH, — . For foundations of Buildings, Roads, Driveways, Pedestals etc. or any other place as, in ordinary soils including soft rock/disint rated rock, in both dry and wet conditions.2. Job Includes pumping and bailing out surface and subsoil water, shoring, strutting as equired as per site condition, slush removal, including backfilling etc, in layers at all heights and depths as per drawing and spec ications wherever required and watering, compacting etc all complete as per instructions of HPCL., in foundation pits, under floors d other places with excavated suitable surplus earth, including reclaiming from spoil heaps kept elsewhere including dressing and le lling, watering and mechanical compaction etc. Including removal of vegetation, shrubs and debris, cutting and dressing of sides in opes, levelling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for sub quent works.3. Transporting surplus soil to unobjectionable place within boundary limits and spreading in layers.NoteThe measurem t for payment shall be for theoretical volume only based on initial and final levels jointly recorded and it shall be the volume of e block of the excavation having maximum bottom dimension of the foundation as per drawing. The contractor shall take into account i his rate, the provision for excess excavation for necessary working space, slope, steps etc. required for excavation, safety and oth allied works and refilling the side slopes and working space etc.Job to be completed as per attached technical specification/codal rovisions/ sound engineering practices and as directed by EIC complete.Scope also includes removal of trees, stumps and roots to fu extent, removal of all vegetation including bushes and grass, dewatering, taking spot levels @ 5 m C/C in grid pattern, levelling, essing and rolling the excavated surface, loading, transportation of surplus earth to an unobjectionable place inside the site premi s, spreading, levelling as per instructions of the engineer in charge. Job also includes backfilling of excavated earth as directed HPCL at no extra cost in excavated place like foundations, pits etc.The job to be executed as per attached technical specification job procedures etc. complete and as directed by EIC." | - | cubic meter |
| 3 | SPLY & FILG SAND | SPLY & FILG SAND — pply and filling river sand conforming to Zone-II & Zone-III as per IS:383 under Footings, Plinth beams, Foundations, pedestals, cul rts, Tunnels, Retaining wall bases, pits, trenches, etc or as directed by EIC, arranged from River or stream bed outside premises in uding all excavation, transportation, labour, royalty etc. at the river bed/sand quarry, filling in HPCL premises in loose layers no exceeding 200 mm and compacting with Vibratory Roller and Plate vibrator(for those portions where vibratory roller cannot be used) s as to achieve 85% of relative density (by sand replacement method) or 93-98% compaction by Proctor Density Method including dressing p the surface, removal of organic materials and watering & job shall be carried out as per attached technical specifications and as r directions of EIC all complete. The quoted rate shall include conducting initial laboratory tests on samples and consequent in-sit relative density test as per IS:2720 Part- XIV/OMC tests@ 75 sqm of area in each layer of filling (moisture content of sand shall be ept below 8%). The Measurement for payment shall be for the theoretical volume only based on initial and final levels jointly record Job to be completed as per attached technical specification/codal provisions/ sound engineering practices and as directed by HPCL E complete. | - | cubic meter |
| 4 | FILNG AVAILAB EARTH | FILNG AVAILAB EARTH — ckfilling to be done with serviceable & reusable soils available from excavation/cutting & filling and stacked earlier within the bo dary including re-excavation, shifting to the site of backfilling, backfilling in layers not exceeding 200 mm loose thickness; water g, compacting to achieve 95% MDD as per lab test; testing; all complete as per instruction of HPCL. scope of the job may also involv demolishing of structures of RCC/PCC/ pipes etc found at site including proper levelling and compaction of the area as per instruct ns of EIC. | - | cubic meter |
| 5 | SPLY&LAYG RUBBLE SOL | SPLY&LAYG RUBBLE SOL — oviding and laying 230 mm thick or specified thickness dry trap rubble stone soling including hand packing, filling the interstices th chips, spalls and binding with grit and selected murrum/machine sand, watering, coMPAction by hand ramming and rolling with 1 met hand roller/plate coMPActor etc. and job to be completed as per attached “standard specifications for soling”. | - | cubic meter |
| 6 | SPLY AND LAYG OF PCC | SPLY AND LAYG OF PCC — oviding and laying plain cement concrete of following grades with 40mm and down size graded aggregates for bed block for PAVEMENT, D VEWAY, DRAIN, CULVERTS, HUME PIPE ENCASING, WATER HARVESTING SYSTEM, RECHARGE PIT, FOUNDATION, FLOOR, PIPELINE, PIT, PLINTH PROTECTI , PLINTH BEAM BASE, BRICK MASONRY BONDING, TRENCHES, COPING OF WALL & any other concreting work ETC, AT ALL DEPTHS AND HEIGHT COMPLE as per HPCL requirement including any required shuttering, machine mixing, tamping, ramming, curing, etc all complete at all levels s per attached technical specifications / codal provisions, drawings, job procedures etc and instructions of HPCL engineer-in-charge | - | cubic meter |
| 7 | SPLY AND LAYG OF PCC | SPLY AND LAYG OF PCC — oviding and laying plain cement concrete of following grades with 40mm and down size graded aggregates for bed block for PAVEMENT, D VEWAY, DRAIN, CULVERTS, HUME PIPE ENCASING, WATER HARVESTING SYSTEM, RECHARGE PIT, FOUNDATION, FLOOR, PIPELINE, PIT, PLINTH PROTECTI , PLINTH BEAM BASE, BRICK MASONRY BONDING, TRENCHES, COPING OF WALL & any other concreting work ETC, AT ALL DEPTHS AND HEIGHT COMPLE as per HPCL requirement including any required shuttering, machine mixing, tamping, ramming, curing, etc all complete at all levels s per attached technical specifications / codal provisions, drawings, job procedures etc and instructions of HPCL engineer-in-charge | - | cubic meter |
| 8 | SPLY AND LAYG OF RCC | SPLY AND LAYG OF RCC — or Foundation slab: Providing and laying RCC with approved design mix for following using 20 mm downgraded coarse aggregate as per I 456-2000 (with Latest amendments) at all depths and heights in all types of foundations, Footings, columns, pedestal, wall, lintels, ucts, beams, brackets, Floors & Driveways, slabs of all shapes, sills, parapets, bands and any other works both in below Ground and perstructures including providing and fixing shuttering form work with approved quality supports, scaffolding, machine mixing, compa ing by mechanical vibrators, curing, etc complete as per Attached technical Specification and as per direction of engineer in charge Concrete Ingredients shall conform to IS 456-2000 with latest amendments. The Cement content shall be governed by design mix. Rate s ll be exclusive of the cost of supplying and providing steel Reinforcement, which will be paid under a separate item Cement shall co orm to IS 8112 43 grade/ IS 12269-53 grade OPC or IS 1489 PPC.Entire Cement concrete job need to be preferably carried out thru Aut atic Weigh batcher (Fixed/mobile (Preferably AJAX Mobile Mixture or equivalent)).The scope of mix design is included in the scope o bidder and the same to be vetted by reputed engineering institute like IIT, NIT, BITS or any other reputed institute approved by HPC Rate to include the following:1. Repairing of the edges and grouting the concrete for the same.2. Pond curing for 15 days for Roo Roods, Slabs, Floors & Driveways Rate quoted by contractor shall be inclusive of carrying out all field tests like slump test, cas ng of cubes and all lab tests like cube compression tests for both 7 days as well as 28 days.Contractor has to carry out NDT like r ound hammer test on randomly selected beams, columns & slabs in case of failure of cubes as directed by EIC at his own cost to confi the compliance to the technical specifications." | - | cubic meter |
| 9 | SPLY AND LAYG OF RCC | SPLY AND LAYG OF RCC — OR Column/Pedestals, Chajjas, lintel beam, Tie Beams and Fins, Facia:Providing and laying RCC with approved design mix for following sing 20 mm downgraded coarse aggregate as per IS 456-2000 (with Latest amendments) at all depths and heights in all types of foundat ns, Footings, columns, pedestal, wall, lintels, ducts, beams, brackets, Floors & Driveways, slabs of all shapes, sills, parapets, ba s and any other works both in below Ground and superstructures including providing and fixing shuttering form work with approved qua ty supports, scaffolding, machine mixing, compacting by mechanical vibrators, curing, etc complete as per Attached technical Specifi tion and as per direction of engineer in charge. Concrete Ingredients shall conform to IS 456-2000 with latest amendments. The Cemen content shall be governed by design mix. Rate shall be exclusive of the cost of supplying and providing steel Reinforcement, which w l be paid under a separate item Cement shall conform to IS 8112 43 grade/ IS 12269-53 grade OPC or IS 1489 PPC.Entire Cement concre job need to be preferably carried out thru Automatic Weigh batcher (Fixed/mobile (Preferably AJAX Mobile Mixture or equivalent)).T scope of mix design is included in the scope of bidder and the same to be vetted by reputed engineering institute like IIT, NIT, BI or any other reputed institute approved by HPCL.Rate to include the following:1. Repairing of the edges and grouting the concrete or the same.2. Pond curing for 15 days for Roof, Roods, Slabs, Floors & Driveways Rate quoted by contractor shall be inclusive of rrying out all field tests like slump test, casting of cubes and all lab tests like cube compression tests for both 7 days as well a 28 days.Contractor has to carry out NDT like rebound hammer test on randomly selected beams, columns & slabs in case of failure of bes as directed by EIC at his own cost to confirm the compliance to the technical specifications." | - | cubic meter |
| 10 | SPLY AND LAYG OF RCC | SPLY AND LAYG OF RCC — OR Plinth Beam, Plinth Area Slab: Providing and laying RCC with approved design mix for following using 20 mm downgraded coarse aggr ate as per IS 456- 2000 (with Latest amendments) at all depths and heights in all types of foundations, Footings, columns, pedestal, ll, lintels, ducts, beams, brackets, Floors & Driveways, slabs of all shapes, sills, parapets, bands and any other works both in bel Ground and superstructures including providing and fixing shuttering form work with approved quality supports, scaffolding, machine ixing, compacting by mechanical vibrators, curing, etc complete as per Attached technical Specification and as per direction of engi er in charge. Concrete Ingredients shall conform to IS 456-2000 with latest amendments. The Cement content shall be governed by desi mix. Rate shall be exclusive of the cost of supplying and providing steel Reinforcement, which will be paid under a separate item C ent shall conform to IS 8112 43 grade/ IS 12269-53 grade OPC or IS 1489 PPC.Entire Cement concrete job need to be preferably carrie out thru Automatic Weigh batcher (Fixed/mobile (Preferably AJAX Mobile Mixture or equivalent)).The scope of mix design is included the scope of bidder and the same to be vetted by reputed engineering institute like IIT, NIT, BITS or any other reputed institute a roved by HPCL.Rate to include the following:1. Repairing of the edges and grouting the concrete for the same.2. Pond curing for 1 days for Roof, Roods, Slabs, Floors & Driveways Rate quoted by contractor shall be inclusive of carrying out all field tests like s mp test, casting of cubes and all lab tests like cube compression tests for both 7 days as well as 28 days.Contractor has to carry t NDT like rebound hammer test on randomly selected beams, columns & slabs in case of failure of cubes as directed by EIC at his own ost to confirm the compliance to the technical specifications." | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400014163-HD-09050.pdf
TENDER_DOCUMENT • 22.04 MB
Download all tender documents and submit your bid