| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹3.3 L+₹53,740 (19.4%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | L3₹3.4 L+₹64,940 (23.5%)Accepted-Finance | L3 | Accepted-Finance OK | |
| 4 | Rejected-Technical 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | - | Rejected-Technical NON FULLFILLMENT OF PQR |
Tender Value
₹2.8 L
EMD Value
₹3,000
Closing Date
18 Jun 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF SE ETC NOIDA
220 KV SUB STATION SECTOR 20 NOIDA
Erection of 132/33 kV, 63 MVA Transformer at 220 kV S/S Dadri under ETD-II Noida
2024_UPTCL_927539_2
E-ST-03/ETCN/2024-25
Open Tender
Electrical Works
Item Rate
15 days
NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EEETD NOIDA
₹3,000
20 Jul 2024
13 Jun 2024
19 Jun 2024
13 Jun 2024
18 Jun 2024
13 Jun 2024
Amount
Complete erection of new 63 MVA 132/33 kV Transformer by erection of radiator, conservator tank. Bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, Buchholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completing of work.
Erection of 120 kV L.A, by connecting of earthing strip joining of jumpers and re erection of structures (ALP,BCT) etc. alongwith associated substation structure.
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through PVT. Centrifuging machine and taking the BDV value of the oil periodically till the required value is achieved.
Earthing of main tank at 2 points of new 63 MVA T/F by using 50x6/75x10 mm size flat & its jointing with already laid earthmat.
Making of Delta (earthing) for HV & LV Neutral and to connect it with already laid earthmat and also from nuetral bushing of new 63 MVA Transformer (Job includes delta for HV/LV)
Jumpering of new 63 MVA T/F from HV with single and LV side with Twin Moose complete up to 33 kV main bus.
Placement of new RTC panel of this new 63 MVA T/F in control room at 220 KV S/S Dadri including its Termination & fitting and laying of control cable if required as per site requirement and its connections.
Safe carriage of 3 No. 33 kV CT from UPPTCL substation in radius of 100 Km.
Sampling and testing of transformer, if required oil at CPRI on any other NABL acredited testing lab including cost of transportation of each sampling bottle (adequated number of bottels to be arranged by contractor). Samples to be taken at required intervals (as per actual requirement). Following test are to be conducted for each sample. 1. BDV, 2. Moisture Content.
Submission of inspection charges for electrical safety clearance from directorate of Electrical Safety, Uttar Pradesh for carrying out inspection of transformer and obtaining charging clearance as per statuary norms (To be reimburssed as per actual)
Meena Elect & Engg. Works
Perfect Power Transformer Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .