Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹4,752.45 (2.82%)Admitted-Fee/PreQual/Technical/Finance | -12.60% | ₹1.7 L+₹4,752.45 (2.82%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.8 L+₹7,861.34 (4.67%)Admitted-Fee/PreQual/Technical/Finance | -11.03% | ₹1.8 L+₹7,861.34 (4.67%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.8 L+₹9,900.93 (5.88%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.8 L+₹9,900.93 (5.88%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.8 L+₹13,881.10 (8.25%)Admitted-Fee/PreQual/Technical/Finance | -7.99% | ₹1.8 L+₹13,881.10 (8.25%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹9,900
Closing Date
13 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of lane with drain Eidgah to house of Gh Mohd Dar at Jawalapora
2026_RDPR_317455_5
NIT_18_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
WATERHAIL
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹9,900
29 Aug 2026
23 Jul 2026
14 Aug 2026
23 Jul 2026
13 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 113.75 | Sqm | 24.12 | ₹2,743.65 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 6.5 | cum | 479.3 | ₹3,115.45 |
| 3 | P/L Stone soling, Nallah Boulders Hand packed Including All Carriages. | 10.83 | cum | 1,266.21 | ₹13,713.05 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, excluding cost of centring, shuttering and finishing.1:4:8 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 8.67 | cum | 5,202.9 | ₹45,109.14 |
| 5 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Ordinary cement without any pigment.light shade using white cement | 94.8 | Sqm | 903.85 | ₹85,684.98 |
| 6 | Cement concrete flooring (25mm) thick 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. | 18.96 | Sqm | 409.85 | ₹7,770.76 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, excluding cost of centring, shuttering and finishing.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.61 | cum | 5,733.6 | ₹20,698.3 |
| 8 | Centering and shuttering incl strutuing proping etc and removal of form work | 18.96 | Sqm | 286.35 | ₹5,429.2 |
| 9 | P/A 12mm thick cement plaster 1:6 (1cement:6fine sand) | 18.96 | Sqm | 266.2 | ₹5,047.15 |
| 10 | Carriage of stone aggregate av lead 10 kms | 10.4 | Cum | 344.49 | ₹3,582.7 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1040574.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .