Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC F 25 SECTOR 6 NOIDA UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
23 Feb 2026, 12:00 pmClosed
Executive Officer, PMB
Pathsala Municipal Board
Selection of an Agency for Establishment, Construction, Supply, Procurement, Fabrication, Erection of Machineries, Trial Run and Commissioning of MRF and W2C Plant at Pathsala, Assam, as per SWM Rules, 2016, under SBM (U), on EPCC Mode-I basis
2026_UDD_51150_1
PMB-353SWMTrancheIISBM2025/573
Open Tender
Civil Works
Pathsala Municipal Board
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹2.8 L
Yes
Pathsala Municipal Board
9 Mar 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
19 Feb 2026
Material Recovery Facility (MRF) and Waste-to-Compost (W2C) Estimate
Total 40 nos Pit including Shed
Detail Estimate of Construction of Shed for MRF (25.00 m x 10.00 m)
Site Development including Earth work for Waste to compost
Site Development including Earth work for MRF shed
Estimate of Separation chamber
Estimate of Waste Receiving Platform
Estimate of Internal Electrification
Estimate of Equipment (Electronic Equipment)
Estimate of External Electrification
Estimate of Bailing Press Machine (Capacity 500kg/hr. 15HP Motor, 300 bar Presure)
Estimate of Conveyor Belt (shorting 6mL x 1m W)
Estimate of Trommel(35mm &25mm,15mm dia1.5m, Total length 5.2m)
Estimate of Shredder cum chopper (500kg/hr, Double Shaft)
Feed Conveyor Belt for Meterial transport to Trommel) (6m x 0.6m)
Estimate of Conveyor Belt for stabilized waste transport (35mm 25mm, 15mm Trommel 6mx0.6m)
Contigency @1% total cost
O&M for for 5 years @ 10% of total cost
AMC @ 1% total cost
Consultancy fee @ 1% of total cost
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 27.00 MB
RFP.pdf
Tender Documents • 26.99 MB
BOQ_81336.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid