| 1 | Admitted-Finance ERIKKADU THERMAL POST METTUR DAM 636 406 | METTUR DAM | SALEM | TAMIL NADU | 636406 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
8 Jul 2021, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Repairs to the R.R.walls of 400KV switchyard by repointing and pointing to the paver blocks allround switchyard, clearing the jungle around switchyard area and planting 100Nos tree saplings flowering plants near vehicle park
2021_EB_202920_2
SE/Civil/MTPS-II/OT-08/2021-22
Open Tender
Civil Works - Others
Works
90 days
MTPS-II/Mettur Dam
Tender Specification
2 documents required · 2 mandatory
₹0
₹3,800
Yes
12 Jul 2021
28 Jun 2021
9 Jul 2021
28 Jun 2021
8 Jul 2021
28 Jun 2021
Amount
Pointing with Cement mortar 1:3 to the RR masonry work / Paver blocks including cost of all materials, labour charges, cleaning the joints, curing, leads & lifts, etc., complete.
Providing PCC 1:2:4 using 20 mm HBG metal for providing coping to the fencing as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc., complete.
Clearing the scrub jungle and disposing the debris to suitable place away from the site as directed by the engineer at site including all labour charges, hire charges for vehicle, tools and plants required, etc., complete.
Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2 m in all types of soil as directed by the Engineer at site, including cost of tools and plants, labour charges, leads, lifts, transport, etc., complete.
Supplying and filling the pits with sand, red earth and manure, at the ratio of 1:2:5 to required depth as per departmental requirement including cost of manure, red earth and sand, transporting charges, mixing charges lead, lift, etc., complete.
Supplying and planting of tree saplings / flowering plants of various varieties as directed by the Engineer in charge including transportation, all labour charges, lead, lift, T&P's, etc., complete.
Providing PCC 1:4:8 using 40mm HBG metal for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, etc., complete.
Brick work in CM 1:4 using fly ash bricks of size 23x11x7.50cm as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&P, etc., complete.
Plastering in C.M 1:5, 12mm thick for wall surfaces including cost of all materials, labour charges, curing, T&P, lead, lift, etc., complete.
Supplying and laying one side polished Cuddapah slab of 38mm thick for sitting bench top, including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing in position of 160mm dia HDPE pipe (PN 6) of FINOLEX or equivalent approved make and quality with ISI monogram as directed by the Engineer in charge including cost of all materials, all specials such as 90 degree bend, shoes, clamps and screws, gratings, etc., making holes in masonry / concrete, restoring the disturbed area to original condition, making water tight jointing with no leakage, labour charges, lead, lift, scaffolding, T&P, personal protective equipments, other safety appliences, etc., complete.
Supplying and fixing in position of 160mm dia PVC Cowl of approved quality as directed by the Engineer in charge for Downfall Pipes including cost of all materials, making water tight jointing with no leakage, labour charges, lead, lift, scaffolding, T&P, personal protective equipments, other safety appliences, etc., complete.
Removing the aluminium glazed doors and stacking the same carefully for reuse including all labour charges, hire charges for tools and plants, lead & lift, etc., complete.
Re-fixing in position of aluminium panelled fully glazed aluminium double leaf door of approved quality as detailed below and as directed by the Engineer at site including cost of all labour charges, leads and lifts etc., complete but excluding cost of materials except rubber beading. i)Vertical and horizontal posts: Aluminium section 63x38mm of thickness 2.45mm, ii) 5mm thick plain glass. iii) Aluminium beading on both sides of the shutters.
Supplying, Fabricating and Fixing in Position of MS fully panelled Door of single leaf of required size using 40X40X5mm MS Angles for door frame, 25X25X5 mm MS Angles for shutter frame by adopting 3Nos. horizontally and 2nos. vertically, top & bottom shutter covered with 18 Gauge MS sheet with MS 25X25X5mm, painting two coats over a red oxide, finished neatly as directed by the Engineer at site, including cost of all materials, providing locking arrangements, holdfast, hinges, labour charge, lead, lift, etc., complete.
Providing and placing of RCC 1:1½:3 using 20mm HBG metal as directed by the Engineer at site, including cost of all materials, labours, lead, lift, shuttering, curing, etc, complete but excluding cost of reinforcement.
Supplying, fabricating and placing in position of RTS/MS rod for RCC works as directed by the Engineer at site including cost of steel, labour charges, binding wire, lead, lift, etc., complete.
Providing two coats of Oil bound distember of approved quality and colour over one coat of primer to the wall surfaces as directed by the Engineer at site, including cost of all materials, labour charges, scaffolding charges, lead, lift etc., complete.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .