Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.9 LAccepted-AOC MAHUAR KIRAWALI AGRA | AGRA | AGRA | UTTAR PRADESH | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹5.2 L+₹60,791.20 (13.2%)Rejected-AOC 61 K GAYARTI NAGAR AZIZPUR DHANOLI AGRA MUKESH KUMAR 61 K GAYATRI NAGAR AZIZPUR DHANOLI AGRA 0562 AGRA UTTAR PRADESH 283102 | AGRA | UTTAR PRADESH | 283102 | L-2 | Rejected-AOC Reject | |
| 3 | L-3₹5.3 L+₹65,617.40 (14.3%)Rejected-AOC 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | L-3 | Rejected-AOC Reject |
Tender Value
₹5.3 L
EMD Value
₹6,000
Closing Date
6 Apr 2023, 5:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
For the work of Business Plan 2023-24 against sanction Packages under EDD-4 Kiraoli.
2023_DVVNL_792474_1
92/EDCA/2022-23
Open Tender
Electrical Works
Piece-work
60 days
B-690 Kamla Nagar Agra
As Per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹6,000
26 Jun 2023
1 Apr 2023
6 Apr 2023
1 Apr 2023
6 Apr 2023
1 Apr 2023
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
ST pole 13.0 Mtr. long
PCC pole 8.5 Mtr. long
100 KVA T/F
63 KVA T/F
L.T. PVC Cable 3.5x150 sqmm
Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material & All required Material as per Package/Estimate.
Erection and grouting of single pole on 13 Mtr. long ST poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier, groputing material etc. required for proper completion of work shall be provided by the contractor.
Erection and grouting of single pole on 8.5 Mtr. long PCC poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of Double pole on 8.5 Mtr. long PCC poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Laying sagging stringing and binding and jumpering on 11 KV/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour,T&P carrier etc reauired for proper completion of work.
ACSR Weasel Conductor
Erection and grouting of stays as per norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Laying of L.T. PVC Cable size 3.5x150 sqmm as per RESPO Norms and direction by superivising by Engineer.
Making HT 'T' off connection on existing mains labour, T &P and carrier etc as per RESPO Norms as required for proper completion of work.
Muffing of STP Poles (2 Feet High) By Concert as per RESPO Norms.
Installation of D.O. Fuse set on Double pole as per RESPO NORMS.
Mounting of 63 KVA T/F on existing double pole & making HT/LT connection
Mounting of 100 KVA T/F on existing double pole & making HT/LT connection
Red oxide Aluminium paint for Painting ST Poles at his own cost. (single coat of red oxide primer and Double coat of Aluminium paint).
Providing & Fixing of Danger Board with Clamp on Poles as per RESPO norms.
Distmentaling of old & Used ST pole 13 Mtr.removal by digging of pits and opening all 33KV accessories & receive back from site to 132 KV Taj Agra with loading- unloading at both ends.
Removal of 63 KVA T/F from existing double pole after opening HT/LT connections and receive back to 132 KV Taj store agra including laodiing- unloading at both end.
Removal of 25 KVA T/F from existing double pole after opening HT/LT connections and receive back to 132 KV Taj store agra including laodiing- unloading at both end.
aashirvad contractor
ABHISHEK ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .