Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -6.00% | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.9 L+₹16,008.57 (4.26%)Admitted-Fee/PreQual/Technical/Finance | -2.00% | ₹3.9 L+₹16,008.57 (4.26%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.0 L+₹24,012.85 (6.38%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹4.0 L+₹24,012.85 (6.38%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-WRONG GSTR 3B UPLOADED |
Tender Value
₹4 L
EMD Value
₹12,000
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CO ROAD FROM MASJID SHARIF BONPORA TO RANGANADI GUTLIGUND BLOCK VERINAG
2026_RDPR_324543_12
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹12,000
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth. All kinds of soil | 355.86 | Sqm | 24.12 | ₹8,583.34 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50m and lift upto 1.5 m | 114.25 | Cum | 187.3 | ₹21,399.03 |
| 3 | SUPPLY and Laying of (RBM) over road subgrade, including all carriages. all complete | 76.5 | Cum | 900 | ₹68,850 |
| 4 | P/L of stone soling of tightly hand packed including all carriages | 3.83 | Cum | 900 | ₹3,447 |
| 5 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm NSA | 33.89 | Cum | 5,733.6 | ₹1,94,311.7 |
| 6 | Plumbs including all carriages | 14.52 | Cum | 900 | ₹13,068 |
| 7 | Form work for centering and shuttering including propping etc & removal of same | 114.38 | sqm | 286.35 | ₹32,752.71 |
| 8 | 12 mm thick C Plaster in 1: 6 Mix | 127.09 | sqm | 241.45 | ₹30,685.88 |
| 9 | Providing and fixing of 4 inches PVC pipe type B as weep hole all complete job | 27 | rm | 250 | ₹6,750 |
| 10 | Carriage charges of materials Sand/Agg. by m.t 20 Km | 46.09 | cum | 405 | ₹18,666.45 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094893.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .