| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 CrAccepted-AOC | ₹3.8 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.8 CrRejected-Finance | ₹3.8 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹4.5 CrRejected-Finance | ₹4.5 Cr | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S LODHI ENTERPRISES L1 | M/S SURESH CHANDRA GUPTA L2 | VIVEK KUMAR SINGH THEKEDAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismentalling of Stone Masonary with Cement Sand Mortor l including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 62.44 | Cum | 400 ₹24,976 | 342.52 ₹21,386.95 Lowest | 469 ₹29,284.36 |
| 2.00 | Earth work Excavation of Foundation in Ordinary soil mixed and Kanker with in 30m lead and 1.50 m lift including refilling of excavated earth in Traench including dressing and manual Compection. | 3,534.2 | Cum | 55 ₹1,94,381 Lowest | 67.82 ₹2,39,689.44 | 92 ₹3,25,146.4 |
| 3.00 | Earth work in filling M.K.R. and Kanker Mixed soil lead upto 1.00km Transpoted earth and initial lift with manual compaction & Dressing in filling Reaches. | 72,156.48 | Cum | 140 ₹1,01,01,907.2 Lowest | 160.6 ₹1,15,88,330.69 | 148 ₹1,06,79,159.04 |
| 4.00 | Earth work in M.K.R. and Kanker Mixed soil incorrecting Internal Section of Canal in Cutting Reaches between km 0.00 to 42.00. | 73,994.8 | Cum | 55 ₹40,69,714 | 51.98 ₹38,46,249.7 | 44.5 ₹32,92,768.6 Lowest |
| 5.00 | Supplying & laying Sand filling including all cost of labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 725.7 | Cum | 1,300 ₹9,43,410 Lowest | 1,853.72 ₹13,45,244.6 | 1,904.51 ₹13,82,102.91 |
| 6.00 | P.C.C. 1:3:6 in foundation with cement, Sand &( 22.4 to 53mm size) per cum Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 555.12 | Cum | 4,000 ₹22,20,480 | 3,580.25 ₹19,87,468.38 Lowest | 4,904 ₹27,22,308.48 |
| 7.00R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | ||||||
| 7.10 | Old | 37.47 | Cum | 2,000 ₹74,940 Lowest | 2,269.63 ₹85,043.04 | 3,109 ₹1,16,494.23 |
| 7.20 | New | 1,892.98 | Cum | 4,000 ₹75,71,920 Lowest | 4,234.4 ₹80,15,634.51 | 5,800 ₹1,09,79,284 |
| 8.00 | Ist Class Brick Masonry work 1:4 Cement Sand Mortar including all labour T&P etc. fro Proper complection of work. as per direction of Engineer-in charge. | 40.74 | Cum | 6,000 ₹2,44,440 | 5,065.48 ₹2,06,367.66 Lowest | 6,939 ₹2,82,694.86 |
Tender Value
₹52.2 L
EMD Value
₹10.4 L
Closing Date
1 Jul 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Restoration Work of Arjun Main Canal from Km. 0.000 to Km. 42.000 In Irrigation Division Mahoba (LOT-03)
2026_UPIDC_1160583_2
04/SE/2026-27 dt 09-06-2026
Open Tender
Civil Works
Item Wise
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹10.4 L
21 Aug 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of Stone Masonary with Cement Sand Mortor l including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 62.44 | Cum | 469.2 | ₹29,296.85 |
| 2 | Earth work Excavation of Foundation in Ordinary soil mixed and Kanker with in 30m lead and 1.50 m lift including refilling of excavated earth in Traench including dressing and manual Compection. | 3,534.2 | Cum | 92.9 | ₹3,28,327.18 |
| 3 | Earth work in filling M.K.R. and Kanker Mixed soil lead upto 1.00km Transpoted earth and initial lift with manual compaction & Dressing in filling Reaches. | 72,156.48 | Cum | 220 | ₹1,58,74,425.6 |
| 4 | Earth work in M.K.R. and Kanker Mixed soil incorrecting Internal Section of Canal in Cutting Reaches between km 0.00 to 42.00. | 73,994.8 | Cum | 71.2 | ₹52,68,429.76 |
| 5 | Supplying & laying Sand filling including all cost of labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 725.7 | Cum | 2,539.34 | ₹18,42,799.04 |
| 6 | P.C.C. 1:3:6 in foundation with cement, Sand &( 22.4 to 53mm size) per cum Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 555.12 | Cum | 4,904.45 | ₹27,22,558.28 |
| 7R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | |||||
| 7.1 | Old | 37.47 | Cum | 3,109.08 | ₹1,16,497.23 |
| 7.2 | New | 1,892.98 | Cum | 5,800.55 | ₹1,09,80,325.14 |
| 8 | Ist Class Brick Masonry work 1:4 Cement Sand Mortar including all labour T&P etc. fro Proper complection of work. as per direction of Engineer-in charge. | 40.74 | Cum | 6,939.01 | ₹2,82,695.27 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.02 MB
BOQ_2181094.xls
BOQ • 0.36 MB
05Retender.pdf
Additional Documents • 0.43 MB
TD.pdf
Tender Documents • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].