| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | ₹8.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.1 L+₹7,560 (0.94%)Rejected-AOC | ₹8.1 L+₹7,560 (0.94%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | svasit Engineers L2 | V R ASSOCIATE L1 |
|---|---|---|---|---|---|
| 1.00 | Old Terrace tile surface repair with UV Resistant hybrid waterproofing coating - Providing and Applying Polyurethane hybrid liquid applied GRIHA certified Waterproofing coating with flutyne protection technology, single component, cold applied, water based acrylic and UV resistant water proofing treatment to the Existing Roof having Tile or any non-porous surface applied @ 1.5 l/m2 in 2 coats to achieve 1mm DFT, having tensile strength with 45 gsm glass fibre mesh 4N/mm2 confirming to ASTM D 412; Elongation at break ≥ 300% and Crack bridging ability up to 3mm, SRI Index 106 as per ASTM E 1980- 01, Water permeability @5 bar – Nil as per EN12390 - 8:2019, including surface preparation, priming the surface with single component high-performance waterborne tile primer which is suitable for non - porous surface at a rate of 0.14 L/m2 and spreading 45 gsm glass fibre mesh of 2.5 mm x 2.5 mm sandwiched between the first and second coat completely as per specification. The finished cost to include surface preparation, making coving at Junction, treatment of cracks completely as per specification. ( SOR 1 25-26 W-0299) | 217 | m2 | 700 ₹1,51,900 | 673 ₹1,46,041 Lowest |
| 2.00 | Dismantling of old Damaged brickwork using cement mortor complete direction as per the departmental officers (CBE Data 25-26 Pg 3) | 5 | m3 | 335 ₹1,675 | 333 ₹1,665 Lowest |
| 3.00 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction of dept officers (CBE Data 25-26 Pg 20) | 7 | M | 310 ₹2,170 | 308 ₹2,156 Lowest |
| 4.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete (CBE Data 25-26 Pg 3) | 1 | m3 | 220 ₹220 Lowest | 220 ₹220 Lowest |
| 5.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 (CBE Data 25-26 Pg 4) | 6 | m3 | 105 ₹630 | 104 ₹624 Lowest |
| 6.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (CBE Data 25-26 Pg 4) | 3 | m3 | 6,000 ₹18,000 | 5,962 ₹17,886 Lowest |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement two fine aggregates and four coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (CBE Data 25-26 Pg 5) | 2 | m3 | 7,300 ₹14,600 | 7,266 ₹14,532 Lowest |
| 8.00 | Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II (CBE Data 25-26 Pg 6) | 4 | m2 | 360 ₹1,440 | 356 ₹1,424 Lowest |
| 9.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half M Sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. (CBE Data 25-26 Pg 6) | 1 | m3 | 9,745 ₹9,745 | 9,744 ₹9,744 Lowest |
| 10.00 | Suppling and fabricating and placing in position R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. (CBE Data 25-26 Pg 8) | 1 | qtl | 9,545 ₹9,545 | 9,542 ₹9,542 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Dec 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Construction of Toilet and Roofing Sheet for Community hall at Naikkar Thottam in Ward no 74 of West Zone
2025_MAWS_624559_27
E6/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
20 Apr 2026
24 Nov 2025
4 Dec 2025
24 Nov 2025
3 Dec 2025
24 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.32 MB
Tender Documents
Tender Documents • 0.66 MB
Additional Documents
Additional Documents • 0.26 MB
BOQ
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .