Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | L1 | Accepted-AOC admitted | |
| 2 | L2₹4.0 L+₹48,364.84 (13.7%)Rejected-Finance | L2 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | SREE BHAGHAVATHY INFRA PRIVATE LIMITED L2 | VPM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.10Maintaintance of Kattathi cheri road in (Kattathi) village Panchayat in (Karambakkudi) union (R-30) | |||||
| 1.20 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 67.5 | sqm | 10 ₹675 | 6 ₹405 Lowest |
| 1.30 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 20.27 | Cum | 160 ₹3,243.2 | 140 ₹2,837.8 Lowest |
| 1.40Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 1.50 | KM 0/0-1/0 | 3.64 | Cum | 5,100 ₹18,564 | 5,079 ₹18,487.56 Lowest |
| 1.60 | KM 1/0 - 2/0 | 1.35 | Cum | 5,100 ₹6,885 | 5,087 ₹6,867.45 Lowest |
| 1.70Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | |||||
| 1.80 | KM 0/0-1/0 | 264.36 | sqm | 50 ₹13,218 | 33 ₹8,723.88 Lowest |
| 1.90 | KM 1/0 - 2/0 | 79.45 | sqm | 50 ₹3,972.5 | 33 ₹2,621.85 Lowest |
| 2.00Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | |||||
Tender Value
₹3.7 L
EMD Value
₹4,000
Closing Date
17 Oct 2025, 4:00 pmClosed
BLOCK DEVELOPMENT OFFICE (B.PT)
panchayat union office karambakkudi
Maintaintance of Kattathi cheri road in Kattathi village Panchayat in Karambakkudi union Maintaintance of Kaliyaranviduthi akkaraivattam road in Kaliyaranviduthi village Panchayat in Karambakkudi union i
2025_RDTN_614656_1
A2/2797/2025-2
Open Tender
Civil Works - Roads
Works
panchayat union office karambakkudi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,000
18 Oct 2025
16 Oct 2025
17 Oct 2025
16 Oct 2025
17 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.96 MB
BOQ
BOQ • 0.40 MB
Tender Documents
Tender Documents • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .