Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance 121 THIRUMURUGAN NAGAR VEERIYAMPALAYAM ROAD KALAPATTY POST COIMBATORE 641048 | COIMBATORE | TAMIL NADU | 641048 | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.8 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.7 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RSK CONSTRUCTION AND PROJECTS L1 | SRI SUBBIAH SANKAR ENGINEERING PRIVATE LIMITED L4 | S.REX L3 | NESHAN ELECTRICAL SYSTEM L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Shifting of Over Head Line upto a length of 490m with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mt PSC Pole - 2 nos , 42 'RSJ (470 KG Each) - 2390 Kg
, Base plate - 5 Nos , Tapping channel - 14 Nos
, 4 1/2 Cross arm - 2 Nos , HT TI Fitting - 6 Nos , 3 Ph Cross Arm - 22 Nos , S Ph Cross Arm - 5 Nos , Back Clamp 9 mt - 8 nos , Back clamp for RSJ - 13 nos , Stay clamp 9 Mt - 7 Pair , Stay clamp for RSJ - 13 Pair , 22 KV Polymer Insulator - 23 Nos , 22 KV polymer Disc - 6 nos , HT Metal parts - 6 nos , LT Shackle - 36 nos , LT metal parts - 36 nos , LT pin insulator - 18 nos , LT Gi pin - 18 nos , Alu.Knob - 2 no , Stay set - 2 Set , Stay plate - 2 nos , Stay wire - 10 kg , GI Thimbles - 4 nos , Stay shackle HT - 4 nos , pole Concreting - 7 Loc , GI Wire - 35 Kg , ACSR 7/4.09 - 624 mt , AAAC 7 / 3.15 - 185 mt , AAAC 7/2.50 - 690mt , Bolt & Nut 3 1/2 x 5/8 - 4 kg , Bolt & Nut 4 1/2 x 5/8 - 4 Kg , MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . (EB Rate ) | 1 | 1Nos(One Number) | 3,62,333 ₹3,62,333 | 5,70,000 ₹5,70,000 | 3,83,219.37 ₹3,83,219 | 3,62,000 ₹3,62,000 Lowest |
| 2.00 | Shifting of DT Structure with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 3 kg , Bolt & nut 3 1/2 x 5/8 - 3 kg , Bolt & nut 4 1/2 x 5/8 - 3 kg , Bolt & nut 6 x 5/8 - 3 kg , Bold & nut 12 x 5/8 - 3 kg , MS Washer - 3 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 2 nos , LT LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . (EB Rate ) | 128 | 1Nos(One Number) | 94,100 ₹94,100 | 1 ₹128 Lowest | 99,523.97 ₹99,524 | 843.73 ₹1,08,000 |
Tender Value
₹6.3 L
EMD Value
₹6,250
Closing Date
11 Aug 2026, 3:00 pmClosed
COMMISSIONER
113 PALAIROAD THOOTHUKUDI
Shifting of EB pole LTHT line and Transformer along the buckle canal from Teachers colony 3rd st bridge to Ashok nagar bridge in TCMC
2026_MAWS_687046_1
E3/1930/2026
Open Tender
Electrical Works
Works
30 days
THOOTHUKUDI MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,250
11 Aug 2026
20 Jul 2026
11 Aug 2026
20 Jul 2026
11 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shifting of Over Head Line upto a length of 490m with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mt PSC Pole - 2 nos , 42 'RSJ (470 KG Each) - 2390 Kg
, Base plate - 5 Nos , Tapping channel - 14 Nos
, 4 1/2 Cross arm - 2 Nos , HT TI Fitting - 6 Nos , 3 Ph Cross Arm - 22 Nos , S Ph Cross Arm - 5 Nos , Back Clamp 9 mt - 8 nos , Back clamp for RSJ - 13 nos , Stay clamp 9 Mt - 7 Pair , Stay clamp for RSJ - 13 Pair , 22 KV Polymer Insulator - 23 Nos , 22 KV polymer Disc - 6 nos , HT Metal parts - 6 nos , LT Shackle - 36 nos , LT metal parts - 36 nos , LT pin insulator - 18 nos , LT Gi pin - 18 nos , Alu.Knob - 2 no , Stay set - 2 Set , Stay plate - 2 nos , Stay wire - 10 kg , GI Thimbles - 4 nos , Stay shackle HT - 4 nos , pole Concreting - 7 Loc , GI Wire - 35 Kg , ACSR 7/4.09 - 624 mt , AAAC 7 / 3.15 - 185 mt , AAAC 7/2.50 - 690mt , Bolt & Nut 3 1/2 x 5/8 - 4 kg , Bolt & Nut 4 1/2 x 5/8 - 4 Kg , MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . (EB Rate ) | 1 | 1Nos(One Number) | - | - |
| 2 | Shifting of DT Structure with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 3 kg , Bolt & nut 3 1/2 x 5/8 - 3 kg , Bolt & nut 4 1/2 x 5/8 - 3 kg , Bolt & nut 6 x 5/8 - 3 kg , Bold & nut 12 x 5/8 - 3 kg , MS Washer - 3 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 2 nos , LT LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . (EB Rate ) | 0.2 | 1Nos(One Number) | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_825856.xls
BOQ • 0.36 MB
BOQ_825856.xls
PDF • 0.34 MB
CORRIGENDUM.pdf
PDF • 0.38 MB
BOQ1.xls
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].