Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹12.3 L+₹2.3 L (22.6%)Rejected-Finance GALI NO 1 KRISHNA NAGAR MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹16.9 L+₹6.9 L (69.0%)Rejected-Finance | L3 | Rejected-Finance Not Lowest Bidder | |
| 4 | L4₹17.1 L+₹7.1 L (71.1%)Rejected-Finance | L4 | Rejected-Finance Not Lowest Bidder |
Tender Value
₹20 L
EMD Value
₹2 L
Closing Date
3 Jun 2023, 6:00 pmClosed
Executive Engineer Irrigation Division Etah
Executive Engineer Irrigation Division Etah
Silt clearance of Areend river / drain From Km. 424.000 to 379.000 for year 2023-24
2023_UPIDC_806994_1
01/EE/2023-24
Open Tender
Civil Works - Canal
Item Rate
20 days
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹2 L
9 Jun 2023
29 May 2023
3 Jun 2023
29 May 2023
3 Jun 2023
29 May 2023
Amount
Silt clearence/trenches digging including lift upto 1.50m and lead upto 6m including cost of driver/ assistant driver, POL, maintnance of machines, contractor profit, taxes etc by Pocklin machine.
M/s Dilip singh contractor
URMILA CONSTRUCTION AND SUPPLIARS
Om Builders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .