| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 CrRejected-Finance GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | ₹1.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.9 CrRejected-Finance 554 174 KA 1 CHHOTA BARHA ALAMBAGH LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹1.9 Cr | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical NAI BAZAR UTTARI TEHSIL MAHMUDABAD DISTRICT SITAPUR | SITAPUR | UTTAR PRADESH | 261001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Rejected-Technical | - | - | Rejected-Technical found not eligible |
| Sl No | Description | Qty | Unit | M/S ARYAN ENTERPRISES L3 | UDAY RAJ L1 | MAMTA SHARMA CONTRACTOR CO BARABANKI L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting including all cost of labour T & P etc. required for proper completion of work. | 18,321 | M² | 3 ₹54,963 Lowest | 4.3 ₹78,780.3 | 4.9 ₹89,772.9 |
| 2.00 | Earth work in cutting / filling in Daula including all lead & lift with manual campaction dressing ,all cost of labour T & P etc. required for proper completion of work. | 6,950.77 | M3 | 80 ₹5,56,061.6 | 69.6 ₹4,83,773.59 Lowest | 72.5 ₹5,03,930.83 |
| 3.00 | Earth work in cutting / filling in embankment including all lead & lift with mechanical campaction dressing ,all cost of labour T & P etc. required for proper completion of work. | 19,909.4 | M3 | 83 ₹16,52,480.2 Lowest | 135 ₹26,87,769 | 159.5 ₹31,75,549.3 |
| 4.00 | Providing & filling local sand / silt with mechanical compaction dressing including all cost of labour T & P etc. required for proper completion of work. | 2,191.25 | M3 | 720 ₹15,77,700 | 739 ₹16,19,333.75 | 699.5 ₹15,32,779.38 Lowest |
| 5.00 | Dry brick on edge pitching (Class-150) including preparation of sub grade and filling joints with local sand including cost of materials, labour, T & P etc. required for proper completion of work. | 21,700 | M² | 499 ₹1,08,28,300 | 487 ₹1,05,67,900 Lowest | 505.5 ₹1,09,69,350 |
| 6.00 | Earth work in excavation including including all lead & Lift, labour,T& P with manual compaction and dressing to profile. required for proper completion of work. | 649.93 | M3 | 101 ₹65,642.93 | 86 ₹55,893.98 Lowest | 90 ₹58,493.7 |
| 7.00 | Centering & shuttering for P.C.C. including cost of Shuttering, T&P etc. for complete work. required for proper completion of work. | 178.34 | M² | 1,000 ₹1,78,340 | 770 ₹1,37,321.8 Lowest | 812 ₹1,44,812.08 |
| 8.00 | Providing & laying P.C.C. 1:3:6 With Cement course sand 4.75 to 20 mm gauge kabrai stone grit including cost of matarial labour and t&p etc. required for proper completion of work. | 69 | M3 | 9,500 ₹6,55,500 | 7,339 ₹5,06,391 Lowest | 8,710 ₹6,00,990 |
| 9.00 | Brick work in 1:4 cement mortar with 1 cement, 4 coarse sand & Ist class brick including cost of all material labour and T & P etc.required for proper completion of the work. | 69.3 | M3 | 7,500 ₹5,19,750 | 5,822 ₹4,03,464.6 Lowest | 6,002 ₹4,15,938.6 |
| 10.00 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall including all cost of material labour T& P etc.required for proper completion of work. | 355.69 | M² | 245 ₹87,144.05 | 189 ₹67,225.41 Lowest | 190 ₹67,581.1 |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
28 May 2026, 1:00 pmClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-02 LOT-03
2026_UPIDC_1149249_7
02/SE-VII/2026-27
Open Tender
Civil Works - Canal
Item Rate
270 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,329
₹4.7 L
14 Aug 2026
23 May 2026
29 May 2026
23 May 2026
28 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and thorney bushes without uprooting including all cost of labour T & P etc. required for proper completion of work. | 18,321 | M² | - | - |
| 2 | Earth work in cutting / filling in Daula including all lead & lift with manual campaction dressing ,all cost of labour T & P etc. required for proper completion of work. | 6,950.77 | M3 | - | - |
| 3 | Earth work in cutting / filling in embankment including all lead & lift with mechanical campaction dressing ,all cost of labour T & P etc. required for proper completion of work. | 19,909.4 | M3 | - | - |
| 4 | Providing & filling local sand / silt with mechanical compaction dressing including all cost of labour T & P etc. required for proper completion of work. | 2,191.25 | M3 | - | - |
| 5 | Dry brick on edge pitching (Class-150) including preparation of sub grade and filling joints with local sand including cost of materials, labour, T & P etc. required for proper completion of work. | 21,700 | M² | - | - |
| 6 | Earth work in excavation including including all lead & Lift, labour,T& P with manual compaction and dressing to profile. required for proper completion of work. | 649.93 | M3 | - | - |
| 7 | Centering & shuttering for P.C.C. including cost of Shuttering, T&P etc. for complete work. required for proper completion of work. | 178.34 | M² | - | - |
| 8 | Providing & laying P.C.C. 1:3:6 With Cement course sand 4.75 to 20 mm gauge kabrai stone grit including cost of matarial labour and t&p etc. required for proper completion of work. | 69 | M3 | - | - |
| 9 | Brick work in 1:4 cement mortar with 1 cement, 4 coarse sand & Ist class brick including cost of all material labour and T & P etc.required for proper completion of the work. | 69.3 | M3 | - | - |
| 10 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall including all cost of material labour T& P etc.required for proper completion of work. | 355.69 | M² | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
CorrigendumNIT02LOT03.pdf
Additional Documents • 0.16 MB
BID02LOT03.pdf
Tender Documents • 2.11 MB
BOQ_2158981.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].