Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Zigma Global Environ Solutions Private Limited L1 |
|---|---|---|---|---|
| 1.00 | Reclamation of exiting dump site through Bio Mining process includes Excavating the existing mixed compacted garbage which underwent biological degradation in the land portion allocated/earmarked by Corporation and loosening the garbage, spraying consortium of micro organism to sanitize and stabilize the loosened material and heaping them for stabilization, Controlling of mal odour by spraying of suitable microbial inoculums, sieving them after stabilization by using Mechanical sieving machine or any other equipment at the cost of the Bidder, adopting eco friendly and nonpolluting process in order to reduce the impact of dumping site in the adjacent areas, further segregating the excavated garbage into as many kinds and categories as possible at the cost of the Bidder including cost of any power or fuel consumption, Selling, diverting for recycling, marketing and recycling the excavated materials.. | 19,250 | M3 | 923 ₹1,77,67,750 Lowest |
| 1.01Creation and maintenance of infrastructure, facilities and amenities at Bidder's risk and cost, for sieving, the excavated garbage, storing the segregated materials. Deployment of necessary manpower, materials, equipment’s, tools and construction of plants and sheds and creation of facilities for handling, separating, segregating and storing for the operation of the plant. Leveling the earth surface by bull-dozer or any other earth moving equipment. Providing security arrangement for the plan project site, machineries, equipment etc. at the cost of the Bidder. Completing the work within the Contract Period as directed by the Departmental officers. The entire segregated materials shall be sold/disposed within fifteen days. The bidder should maintain the Ambient Air quality within the standard prescribed and the activities should not attract any public complaintsfor all etc., | ||||
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
9 Aug 2021, 3:00 pmClosed
THE COMMISSIONER,ERODE CITY MUNICIPAL CORPORATION
246, MEENAKSHI SUNDARANAR SALAI, ERODE
Revamping of Dumped Garbage in Muthusamy colony Dumped Yard by Bio-Mining Process at Erode City Municipal Corporation.
2021_MAWS_206605_1
E1-5665-2020-1.ERODE CITY MUNICIPAL CORPORATION
Open Tender
Solid Waste Management
Works
90 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.6 L
ERODE CITY MUNICIPAL CORPORATION
18 Aug 2021
28 Jul 2021
10 Aug 2021
28 Jul 2021
9 Aug 2021
28 Jul 2021
30 Jul 2021
Amount
Reclamation of exiting dump site through Bio Mining process includes Excavating the existing mixed compacted garbage which underwent biological degradation in the land portion allocated/earmarked by Corporation and loosening the garbage, spraying consortium of micro organism to sanitize and stabilize the loosened material and heaping them for stabilization, Controlling of mal odour by spraying of suitable microbial inoculums, sieving them after stabilization by using Mechanical sieving machine or any other equipment at the cost of the Bidder, adopting eco friendly and nonpolluting process in order to reduce the impact of dumping site in the adjacent areas, further segregating the excavated garbage into as many kinds and categories as possible at the cost of the Bidder including cost of any power or fuel consumption, Selling, diverting for recycling, marketing and recycling the excavated materials..
Creation and maintenance of infrastructure, facilities and amenities at Bidder's risk and cost, for sieving, the excavated garbage, storing the segregated materials. Deployment of necessary manpower, materials, equipment’s, tools and construction of plants and sheds and creation of facilities for handling, separating, segregating and storing for the operation of the plant. Leveling the earth surface by bull-dozer or any other earth moving equipment. Providing security arrangement for the plan project site, machineries, equipment etc. at the cost of the Bidder. Completing the work within the Contract Period as directed by the Departmental officers. The entire segregated materials shall be sold/disposed within fifteen days. The bidder should maintain the Ambient Air quality within the standard prescribed and the activities should not attract any public complaintsfor all etc.,
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_245486.xls
BOQ • 0.28 MB
CONDITIONS_1.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .