Tender Value
₹15.9 L
EMD Value
₹33,775
Closing Date
9 Jul 2025, 9:30 pmClosed
Directorate of Municipal Administration
Construction of CD & Open drain at at Laxminagar, Jannathnagar 3rd & 4th cross and backside of Faruki Masjid in w.no 22
DMA/2025-26/OW/WORK_INDENT42434
DMA/2025-26/OW/WORK_INDENT42434
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹500
₹33,775
20 Jun 2025
20 Jun 2025
30 Jun 2025
Construction of CD & Open drain at at Laxminagar, Jannathnagar 3rd & 4th cross and backside of Faruki Masjid in w.no 22
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum. (Tipper 5.5 m3) SR 2023-24 P.No.3/1.1a(Volume-3)
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Th...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete Drain Walls 35% Percentage on finished rate of concrete per m3 (SL No-4)SR 2023-24 P.No.111(Volume-1)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Solid Slab Super Structure 20% Percentage on finished rate of concrete per m3 (SL No-1)SR 2023-24 P.No.112(Volume-1)
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .