| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.1 LAccepted-AOC 18 SANKAR BOSE ROAD KOLKATA | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹83.7 L+₹1.6 L (1.97%)Rejected-AOC 728 K M ROYCHAWDHURY ROAD P O DAKSHIN JAGADDAL P S SONARPUR KOLKATA 700151 | KOLKATA | 24 PARAGANAS SOUTH | WEST BENGAL | 700151 | L2 | Rejected-AOC 2ND LOWEST | |
| 3 | L3₹84.1 L+₹2.0 L (2.46%)Rejected-AOC 46 6 PRINCE GOLAM HOSSAIN SHAH ROAD JADAVPUR KOLKATA 700032 | KOLKATA | KOLKATA | WEST BENGAL | 700032 | L3 | Rejected-AOC 3RD LOWEST |
Tender Value
₹80.5 L
EMD Value
₹1.6 L
Closing Date
30 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER, PWD HOOGHLY DIVISION
HOOGHLY DIVISION, PWD, CHAWKBAZAR
Construction and renovation of Toilet Blocks as per direction passed by Honble Supreme Court of India for male, female, transgender, PWD and Child for the Judicial officers, Advocates, Court Staff and Litigant at District Judges Court, Chinsurah und
2026_WBPWD_5013926_1
WBPWD/EE /HD/NIT_ 04 /2026_2027
Open Tender
CIVIL WORKS
Percentage
150 days
HOOGHLY DIVISION, PWD, CHAWKBAZAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.6 L
Yes
22 Jun 2026
12 May 2026
1 Jun 2026
15 May 2026
30 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof.
Walls | - | Cum | 447 | - |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof | - | Cum | 939 | - |
| 3 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. Ground Floor
Walls | - | Cum | 1,956 | - |
| 4 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed | 1 | sqm | 19 | ₹18.98 |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm | - | Cum | 119.27 | - |
| 6 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation | - | Cum | 77.54 | - |
| 7 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand | - | Cum | 851.83 | - |
| 8 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | sqm | 357 | - |
| 9 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] (a) 1:3:6 proportion | - | Cum | 4,784.44 | - |
| 10 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture]
M 25 Grade | 1 | Cum | 5,978.93 | ₹5,972.95 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_5081810.xls
BOQ • 0.43 MB
Corrigendum_1.pdf
PDF • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .