Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹169.2 CrAdmitted-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L1 | Admitted-Finance | |
| 2 | L2₹173.7 Cr+₹4.5 Cr (2.69%)Admitted-Finance FLAT NO 442 POCKET C CAT III SARITA VIHAR NEW DELHI 110076 | NEW DELHI | NEW DELHI | DELHI | 110076 | L2 | Admitted-Finance | |
| 3 | L3₹174.6 Cr+₹5.4 Cr (3.20%)Admitted-Finance 8TH FLOOR BUILDING 9A DLF PHASE III SECTOR 25 GURUGRAM 122002 | GURUGRAM | GURUGRAM | HARYANA | 122002 | L3 | Admitted-Finance | |
| 4 | L4₹175.9 Cr+₹6.7 Cr (3.96%)Admitted-Finance 1201 1202 12TH FLOOR TOWER B MILLENIUM PLAZA SECTOR 27 VILLAGE GURUGRAM GURGAON HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122002 | L4 | Admitted-Finance | |
| 5 | L5₹176.1 Cr+₹7.0 Cr (4.11%)Admitted-Finance TERMINAL A 1 18 1 AMR NR NANAKRAMGUDA GACHIBOWLI HYDERABAD 500 032 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500032 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Inderjit Mehta Constructions Private Limited L7 | Amara Raja Infra Private Limited L5 | KEC International Ltd L3 | RMS CONSTRUCTION PVT. LTD. L6 | Shubham EPC Private Limited L1 | RSB PROJECTS PRIVATE LIMITED L2 | Som Projects Pvt. Ltd. L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge from 0.00 to 1.50 m depth from Average Ground Level | 56,000 | Cu. M | 402 ₹2,25,12,000 | 90 ₹50,40,000 Lowest | 126 ₹70,56,000 | 210 ₹1,17,60,000 | 205 ₹1,14,80,000 | 289 ₹1,61,84,000 | 395 ₹2,21,20,000 |
| 2.00 | Extra over item 1 for every additional 1.5 m depth or part thereof | 27,500 | Cu. M | 80 ₹22,00,000 | 25 ₹6,87,500 | 8 ₹2,20,000 Lowest | 110 ₹30,25,000 | 55 ₹15,12,500 | 75 ₹20,62,500 | 80 ₹22,00,000 |
| 3.00 | Earth work excavation by mechanical means (Hydraulic excavator) in Soft and decomposed rock - This shall include rock, boulders, slag, chalk, slate, hard mica schist, laterite and all other materials which in the opinion of Engineer is rock, but does not need blasting (Blasting Prohibited) and could be removed with picks, hammer, crow bars, wedges, and pneumatic breaking equipment. This shall also include excavation in macadam and tarred roads and pavements. This shall also include rock boulders not longer than 1 metre in any direction and not more than 500 mm in any one of the other two directions. From 0.00m upto 1.50m depth below Average Ground Level | 51,700 | Cu. M | 483 ₹2,49,71,100 | 300 ₹1,55,10,000 | 326 ₹1,68,54,200 | 475 ₹2,45,57,500 | 295 ₹1,52,51,500 Lowest | 800 ₹4,13,60,000 | 630 ₹3,25,71,000 |
| 4.00 | Extra over item 3 for every additional 1.5 m depth or part thereof | 1,10,000 | Cu. M | 193 ₹2,12,30,000 | 50 ₹55,00,000 | 31 ₹34,10,000 Lowest | 155 ₹1,70,50,000 | 75 ₹82,50,000 | 65 ₹71,50,000 | 95 ₹1,04,50,000 |
| 5.00 | Earth work excavation by mechanical means (Hydraulic excavator) in hard rock-This excavation shall be carried out mechanically using hydraulic excavators, pneumatic breaking equipments, JCB, Poclains as directed. Under this category shall fall quartzite, granite, basalt, plain & reinforced cement concrete (reinforcement to be cut through but not separated from concrete) foundation, masonry or any other hard material etc. From 0.00 m upto 1.50 m depth below Average Natural Ground Level | 35,000 | Cu. M | 1,046 ₹3,66,10,000 | 800 ₹2,80,00,000 | 763 ₹2,67,05,000 | 1,250 ₹4,37,50,000 | 555 ₹1,94,25,000 Lowest | 1,180 ₹4,13,00,000 | 1,890 ₹6,61,50,000 |
| 6.00 | Extra over item 5 for every 1.5 m extra depth or part thereof | 1,20,000 | Cu. M | 201 ₹2,41,20,000 | 25 ₹30,00,000 Lowest | 61 ₹73,20,000 | 285 ₹3,42,00,000 | 105 ₹1,26,00,000 | 95 ₹1,14,00,000 | 125 ₹1,50,00,000 |
| 7.00 | Disposal / Stacking of excavated materials (all kinds of soil, rock, boulders, concrete or any other excavated materials) to disposal ground (Within the DAE Premises) for lead up to 4km (as specified below) & all lifts including stacking / spreading in layers, breaking earth clods & rock clusters, leveling, disposing the soil by mechanical transport, loading / unloading etc. complete from the site of excavation to the place of disposition all as directed by the Engineer.
7a) Disposal / Stacking of excavated materials - For soil & soft rock | 1,07,700 | Cu. M | 225 ₹2,42,32,500 | 75 ₹80,77,500 | 61 ₹65,69,700 Lowest | 350 ₹3,76,95,000 | 135 ₹1,45,39,500 | 105 ₹1,13,08,500 | 160 ₹1,72,32,000 |
| 8.00 | 7b) Disposal / Stacking of excavated materials - For hard rock | 35,000 | Cu. M | 322 ₹1,12,70,000 | 90 ₹31,50,000 | 77 ₹26,95,000 Lowest | 355 ₹1,24,25,000 | 225 ₹78,75,000 | 165 ₹57,75,000 | 320 ₹1,12,00,000 |
| 9.00 | Filling in plinth & foundation trenches, under floors / grade slabs / on top of raft slabs or any other location as directed with approved available excavated murrum / earth including loading, mechanical transportation from the location of storage / stacking within the premises of DAE, unloading, levelling, spreading in layers of maximum 250 mm depth, watering & compacting by mechanical means to achieve minimum 98% of Standard Proctor Density, all equipment, labour, supervision etc. complete as per drawings, specifications and directions of the Engineer-in-Charge. | 84,000 | Cu. M | 241 ₹2,02,44,000 | 350 ₹2,94,00,000 | 164 ₹1,37,76,000 | 300 ₹2,52,00,000 | 375 ₹3,15,00,000 | 140 ₹1,17,60,000 Lowest | 160 ₹1,34,40,000 |
| 10.00 | Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 12,700 | Sq.M | 871 ₹1,10,61,700 | 650 ₹82,55,000 | 671 ₹85,21,700 | 785 ₹99,69,500 | 450 ₹57,15,000 Lowest | 828 ₹1,05,15,600 | 630 ₹80,01,000 |
Tender Value
₹180.7 Cr
EMD Value
₹1.9 Cr
Closing Date
10 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive, NRB
NRB, BARC Trombay
Construction of Main Lab Building - A at INRP-FF, NRB, BARC, Tarapur
2023_NRB_772835_1
BARCT/NRB/PTC107/2023/1328a
Open Tender
Civil Works
Item Rate
850 days
BARC, NRB, Tarapur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.9 Cr
Project Director Office
30 Apr 2024
26 Sept 2023
14 Nov 2023
26 Sept 2023
10 Nov 2023
21 Oct 2023
26 Sept 2023 - 15 Oct 2023
17 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge from 0.00 to 1.50 m depth from Average Ground Level | 56,000 | Cu. M | - | - |
| 2 | Extra over item 1 for every additional 1.5 m depth or part thereof | 27,500 | Cu. M | - | - |
| 3 | Earth work excavation by mechanical means (Hydraulic excavator) in Soft and decomposed rock - This shall include rock, boulders, slag, chalk, slate, hard mica schist, laterite and all other materials which in the opinion of Engineer is rock, but does not need blasting (Blasting Prohibited) and could be removed with picks, hammer, crow bars, wedges, and pneumatic breaking equipment. This shall also include excavation in macadam and tarred roads and pavements. This shall also include rock boulders not longer than 1 metre in any direction and not more than 500 mm in any one of the other two directions. From 0.00m upto 1.50m depth below Average Ground Level | 51,700 | Cu. M | - | - |
| 4 | Extra over item 3 for every additional 1.5 m depth or part thereof | 1,10,000 | Cu. M | - | - |
| 5 | Earth work excavation by mechanical means (Hydraulic excavator) in hard rock-This excavation shall be carried out mechanically using hydraulic excavators, pneumatic breaking equipments, JCB, Poclains as directed. Under this category shall fall quartzite, granite, basalt, plain & reinforced cement concrete (reinforcement to be cut through but not separated from concrete) foundation, masonry or any other hard material etc. From 0.00 m upto 1.50 m depth below Average Natural Ground Level | 35,000 | Cu. M | - | - |
| 6 | Extra over item 5 for every 1.5 m extra depth or part thereof | 1,20,000 | Cu. M | - | - |
| 7 | Disposal / Stacking of excavated materials (all kinds of soil, rock, boulders, concrete or any other excavated materials) to disposal ground (Within the DAE Premises) for lead up to 4km (as specified below) & all lifts including stacking / spreading in layers, breaking earth clods & rock clusters, leveling, disposing the soil by mechanical transport, loading / unloading etc. complete from the site of excavation to the place of disposition all as directed by the Engineer.
7a) Disposal / Stacking of excavated materials - For soil & soft rock | 1,07,700 | Cu. M | - | - |
| 8 | 7b) Disposal / Stacking of excavated materials - For hard rock | 35,000 | Cu. M | - | - |
| 9 | Filling in plinth & foundation trenches, under floors / grade slabs / on top of raft slabs or any other location as directed with approved available excavated murrum / earth including loading, mechanical transportation from the location of storage / stacking within the premises of DAE, unloading, levelling, spreading in layers of maximum 250 mm depth, watering & compacting by mechanical means to achieve minimum 98% of Standard Proctor Density, all equipment, labour, supervision etc. complete as per drawings, specifications and directions of the Engineer-in-Charge. | 84,000 | Cu. M | - | - |
| 10 | Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 12,700 | Sq.M | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.38 MB
PTC107.pdf
Tender Documents • 13.92 MB
BOQ_812426.xls
BOQ • 0.40 MB
TechnicalBidPTC107.xls
Additional Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .