Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.5 LAccepted-AOC 107 1A TOLLYGAUNG ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | ₹38.5 L Quoted ₹39.5 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹42.7 LRejected-Finance 7 11 1 BROJONATH LAHIRI BISHNUPUR SOUTH 24 PGS WEST BENGAL 743503 | 24 PARAGANAS SOUTH | WEST BENGAL | 743503 | ₹42.7 L | L2 | Rejected-Finance HIGHER THEN L1 BIDDER |
| 3 | L3₹42.8 LRejected-Finance | ₹42.8 L | L3 | Rejected-Finance HIGHER THEN L1 BIDDER |
| 4 | L4₹43.0 LRejected-Finance 8 27 BEJOYGARH JADAVPUR KOLKATA 700 032 | KOLKATA | WEST BENGAL | 700032 | ₹43.0 L | L4 | Rejected-Finance HIGHER THEN L1 BIDDER |
| 5 | L5₹44.4 LRejected-Finance 165 UTTAR KASTODANGA ROAD KOLKATA 700 061 | KOLKATA | WEST BENGAL | 700061 | ₹44.4 L | L5 | Rejected-Finance HIGHER THEN L1 BIDDER |
| Sl No | Description | Qty | Unit | MAZUMDER ENTERPRISE No Rank | UNIVERSAL TRADING CENTRE L3 | UNITED ENGINEERS L2 | MS AP CONSTRUTION AND CO L5 | ARJUN DAS VALECHA L4 | PINKY CO. No Rank | SK CONSTRUCTION SYNDICATE & ENGG CO L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling Floor, Hearth or Wall Tiling including Cement Mortar Bedding (but not backing), and removing rubbish off the Premises, complete all as specified and as directed. | 166 | Sqm | - | - | - | 65 ₹10,790 | 60 ₹9,960 | - | - |
| 2.00 | Dismantling Reinforced Cement Concrete of any description and in any Position not otherwise specifically provided for, complete all as specified and as directed. | 1.5 | Cum | - | - | - | 1,300 ₹1,950 | 1,000 ₹1,500 | - | - |
| 3.00 | Demolition of Brick Work built in Cement Mortar including all Quoins, Arches, Pillars, etc. of any descriptions, complete all as specified and as directed. | 3.5 | Cum | - | - | - | 610 ₹2,135 | 550 ₹1,925 | - | - |
| 4.00 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm complete all as specified and directed. | 40 | Each | - | - | - | 276 ₹11,040 | 225 ₹9,000 | - | - |
| 5.00 | Taking down chowkats or frames with shutter (without taking off shutter from the frames) exc. 1.50 Sqm and n.exc 4 Sqm each complete all as specified and directed. | 34 | Each | - | - | - | 410 ₹13,940 | 280 ₹9,520 | - | - |
| 6.00 | Dismantling Plain or Corrugated Steel Sheeting any gauge, thickness, including nainital or similar roof coverings/sunshade, complete all as specified and as directed. | 50 | Sqm | - | - | - | 32 ₹1,600 | 25 ₹1,250 | - | - |
| 7.00 | Taking down cement plaster of any description on brick work or stone msonary wall including racking ot joints hacking for key scrubbing down with water etc. complete all as specified and directed. | 215 | Sqm | - | - | - | 75 ₹16,125 | 60 ₹12,900 | - | - |
| 8.00 | Taking up or down Steel Water Tubing 20mm dia (bore) including Connections and Fittings, Segregating Serviceable Pipes & Fittings, Stacking properly at Site(s) and keep in Safe Custody for re-use, complete all as specified and as directed.
Note:- Work to be executed in G+9 storey bldg, rates to bequoted accordingly. | 275 | RM | - | - | - | 38 ₹10,450 | 45 ₹12,375 | - | - |
| 9.00 | Taking up or down Steel Water Tubing 25mm dia (bore) including Connections and Fittings, Segregating Serviceable Pipes & Fittings, Stacking properly at Site(s) and keep in Safe Custody for re-use, complete all as specified and as directed.
Note:- Work to be executed in G+9 storey bldg, rates to bequoted accordingly. | 350 | RM | - | - | - | 43 ₹15,050 | 50 ₹17,500 | - | - |
| 10.00 | Taking up or down Steel Water Tubing 32mm dia (bore) including Connections and Fittings, Segregating Serviceable Pipes & Fittings, Stacking properly at Site(s) and keep in Safe Custody for re-use, complete all as specified and as directed.
Note:- Work to be executed in G+9 storey bldg, rates to bequoted accordingly. | 740 | RM | - | - | - | 52 ₹38,480 | 50 ₹37,000 | - | - |
Updated dates
Tender Value
₹37.8 L
EMD Value
₹75,540
Closing Date
15 Jan 2026, 6:00 pmClosed
SHRI RAKESH KUMAR
GARRISON ENGINEER (CENTRAL) KOLKATA NAPIER ROAD HASTINGS 700022
PROVN OF CPVC PIPE LINE IN LIEU OF RUSTED GI PIPE AT BLOCK-1 LHS OF BHATTACHARYA ENCLAVE AND PROVN OF CPVC PIPE LINE IN LIEU OF RUSTED GI PIPE AT HOOGLY VIEW AND ADDN / ALTN OF ROOM OF BLDG NO D-3 OF ECSR AND PROVN OF ALUMINUM WINDOW AND ALLIED WORK
2025_MES_734095_2
8868/E8
Open Tender
Miscellaneous Works
180 days
Kolkata
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(CENTRAL) KOLKATA
₹75,540
Yes
10 Mar 2026
22 Dec 2025
16 Jan 2026
22 Dec 2025
15 Jan 2026
30 Dec 2025
22 Dec 2025 - 29 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: GE ( C ) KOLKATA
Name of Work: PROVN OF CPVC PIPE LINE IN LIEU OF RUSTED GI PIPE AT BLOCK-1 LHS OF BHATTACHARYA ENCLAVE AND PROVN OF CPVC PIPE LINE IN LIEU OF RUSTED GI PIPE AT HOOGLY VIEW AND ADDN / ALTN OF ROOM OF BLDG NO D-3 OF ECSR AND PROVN OF ALUMINUM WINDOW AND ALLIED WORK IN BLOCK 4 OF JUBILEE LINE UNDER GE (C) KOLKATA
Contract No: GE (C )/KOL/ OF 2025-26
Item No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Conversion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT TOTAL AMOUNT In Words
Dismantling Floor, Hearth or Wall Tiling including Cement Mortar Bedding (but not backing), and removing rubbish off the Premises, complete all as specified and as directed. Sqm 0.0000 Excess(+) Full Conversion INR
"Supply only" liquid water proofing compound (ISI marked) complete all as specified and directed. Ltr 0.0000 Excess(+) Full Conversion INR
S&F CPVC pipes 40 mm outer diameter of SDR 11 & plain CPVC SDR 11 fittings fixed on Walls, Ceiling or laid in Floors or any other Situation, etc up to G+9 stories height of bldgs. complete as all specified and as directed. Note:- Work to be executed in G+9 storey bldg, rates to bequoted accordingly. RM 0.0000 Excess(+) Full Conversion INR
S&F 32mm bore brass elbow for CPVC pipe as complete all as specified and directed. Each 0.0000 Excess(+) Full Conversion INR
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TENDER8868.pdf
Tender Documents • 1.40 MB
BOQ_834938.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid