| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.8 LAccepted-AOC NANAK TOWER 3RD FLOOR SEVOKE ROAD SILIGURI | ₹57.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹57.9 L+₹9,593.99 (0.17%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹57.9 L+₹9,593.99 (0.17%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹58.0 L+₹22,346.25 (0.39%)Rejected-Finance 76 1 GURU SADAY DUTTA SARANI NORTH BHARAT NAGAR SILIGUR | ₹58.0 L+₹22,346.25 (0.39%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹59.8 L+₹2.0 L (3.39%)Rejected-Finance NUTANCHATI BHOWMIK GATE BANKURA | BANKURA | ₹59.8 L+₹2.0 L (3.39%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹59.9 L+₹2.1 L (3.62%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | ₹59.9 L+₹2.1 L (3.62%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | MS P P ELECTRICALS L1 | DEY ENTERPRISE L2 | ALPHA ENTERPRISE L3 | PRADIP KUMAR DHABAL L4 | EASTERN INDIA SALES AND SERVICE L5 | PROGRESSIVE ENGINEERS CO OPERATIVE SOCIETY LIMITED L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Delivery and storage at site of Horizantal Split cashing Centrifugal Pumping Machinary with base plate flexible coupllng, coupling guard, foundation bolt etc. other Accessories etc. having the following specification and as per technical Specifications given in NIT
for CWR site
a) Discharge : 124m3 / hr, Total Head : 135 mtrs.
N.B- H-Q curve has to be submitted during the delivery | 1 | each | 16,43,200 ₹16,43,200 | 16,45,000 ₹16,45,000 | 16,48,000 ₹16,48,000 | 16,12,000 ₹16,12,000 Lowest | 16,14,500 ₹16,14,500 | 16,15,500 ₹16,15,500 |
| 2.00 | Supply, Delivery and Storage at site of suitable capacity Horizantal foot Mounted solid shaft Induction Motor (IE 4 type) suitable for the pump duty mentioned above with adequate margin as per detail technical specification .
N.B-No load as well as short-circuit Test Certificate of induction motor during test run has to be submitted during the delivery. | 2 | each | 9,18,000 ₹18,36,000 | 9,20,000 ₹18,40,000 | 9,20,500 ₹18,41,000 | 9,02,300 ₹18,04,600 Lowest | 9,03,750 ₹18,07,500 | 9,03,000 ₹18,06,000 |
| 3.00 | Dismanteling and takenout of all damaged Pumping machineries from base, M.S /C.I suction and delivery pipe line Valves etc by the using manual labour and hiring tools (Vibrator, Cutting Machine and wilding machine) as per direction of E.I.C | 1 | L.S | 4,900 ₹4,900 Lowest | 5,200 ₹5,200 | 5,500 ₹5,500 | 4,900 ₹4,900 Lowest | 5,800 ₹5,800 | 6,000 ₹6,000 |
| 4.00 | Installation & commissioning of all items mentioned as in Sl no. 1& 2 including supply of all erection items, as required for installation of centrifugal pump motr sets including supplying all necessary items i.e- nut & bolt wather rubber gasket, with painting, jointing of cables termination cable soketing by suitable rated sockets and paining anticorrosive paint etc. including cost of gas cutting, welding etc. as required for complete the installation as per Hydraulic standard & IE rules in compliance by engaging skilled technician all complete as per Technical specification and upto entire satisfaction of EIC. | 1 | L.S | 2,600 ₹2,600 Lowest | 2,800 ₹2,800 | 3,000 ₹3,000 | 2,56,000 ₹2,56,000 | 2,58,000 ₹2,58,000 | 2,56,500 ₹2,56,500 |
| 5.00 | Making Earthing arrangement in complience with I.E rules by G.I pipe electrode with G.I funnel (50mmx 3 mtrlong) direcrt ground with supplying and fixing of G.I earth busbar drawing of 25mmx 6mm G.I earth conductor between pits and as earth busbar inside the pump house and 20mmx 3 mm GI strips for continuty to different electrica; installation i.e main switch panel and feeder box etc and making suitable size earth pit etyc all complete. | 2 | each | 4,800 ₹9,600 Lowest | 5,000 ₹10,000 | 5,500 ₹11,000 | 4,850 ₹9,700 | 5,150 ₹10,300 | 9,900 ₹19,800 |
| 6.00 | Carrying charges for unserviceable matrials ie- Pump motor set, etc from w/s scheme water supply scheme to Bankura Mechanical Division Ahilakundi with loading and unloading as per direction | 1 | /Trip | 4,850 ₹4,850 | 4,600 ₹4,600 Lowest | 4,800 ₹4,800 | 4,750 ₹4,750 | 5,250 ₹5,250 | 5,000 ₹5,000 |
| 7.00 | Supply delivery and Installation of all equipments for leak absorbtion system at Gaseous chlorination unit comprising of the following materials
FRP hood for 100 kg cylinder - 4 no
Flexible pipe for hood connection- 4 no
Centrifugal blower, 1000 m3/hr @ 600 mmwc (1W) -1 no
Drain pump for pit -1 no
4” UPVC pipe with fittings , 15 meters -1 lot
Drain pump piping, 2” - 1 lot
Evoqua make chlorine leak detector with single sensor GSM Plus -1 set
Sensor for leak detector
Diffuser for neutralization system -1 no
Control panel for neutralization-1 no
Cable and conduit for neutralization -1 lot
Make-As per approved vendors for electro-mechanical items of TC & GC to be submitted during delivery of materials. (Make and drawing to be approved from EIC before placement of Order)
(For Installation of avove system rate is including of suitable cable protection pipe, including cable finishing, supplying of all necessary metrials and etc and cost of hiring D.G set ( if required), welding machine, cutting machine to complete the jobs including necessary cutting of cement concrete (if needed) Laying of cable from 3/3½ core sqmm on wall/surface and Painting of anty corrosive paint in all respect as per tecnical specification and as per direction of E.I.C.(Any item or accessories not considered in the specification but required to complete the entire installation and operation shall have to be supplied and installed. No extra charge shall be provided for this purpose.) | 1 | each | 13,48,400 ₹13,48,400 | 13,50,000 ₹13,50,000 | 13,55,000 ₹13,55,000 | 13,22,000 ₹13,22,000 Lowest | 13,23,900 ₹13,23,900 | 13,26,000 ₹13,26,000 |
| 8.00 | Add: 18% GST | 1 | L.S | 8,72,919 ₹8,72,919 Lowest | 8,74,368 ₹8,74,368 | 8,76,294 ₹8,76,294 | 9,02,511 ₹9,02,511 | 9,04,545 ₹9,04,545 | 9,06,264 ₹9,06,264 |
| 9.00 | Add: 1% Cess | 1 | L.S | 57,224.69 ₹57,224.69 Lowest | 57,319.68 ₹57,319.68 | 57,445.94 ₹57,445.94 | 59,164.61 ₹59,164.61 | 59,297.95 ₹59,297.95 | 59,410.64 ₹59,410.64 |
Tender Value
₹62 L
EMD Value
₹1.2 L
Closing Date
20 May 2025, 6:00 pmClosed
Executive Engineer, BMD, PHE, Dte
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Providing, installation of Pumping machineries with other electro-mechanical accessories for Augmentation of piped water supply scheme at Sarenga block, Phulberia, Gargaria water supply scheme under Bankura Mechanical Division, PHE Dte Dist Bankura
2025_PHED_833524_1
WBPHED/EE/BMD/NIeT-1 OF 2025-2026
Open Tender
MECHANICAL
Item Rate
90 days
Bankura
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.2 L
Yes
17 Sept 2026
25 Apr 2025
23 May 2025
25 Apr 2025
20 May 2025
25 Apr 2025
Amount
Supply, Delivery and storage at site of Horizantal Split cashing Centrifugal Pumping Machinary with base plate flexible coupllng, coupling guard, foundation bolt etc. other Accessories etc. having the following specification and as per technical Specifications given in NIT for CWR site a) Discharge : 124m3 / hr, Total Head : 135 mtrs. N.B- H-Q curve has to be submitted during the delivery
Supply, Delivery and Storage at site of suitable capacity Horizantal foot Mounted solid shaft Induction Motor (IE 4 type) suitable for the pump duty mentioned above with adequate margin as per detail technical specification . N.B-No load as well as short-circuit Test Certificate of induction motor during test run has to be submitted during the delivery.
Dismanteling and takenout of all damaged Pumping machineries from base, M.S /C.I suction and delivery pipe line Valves etc by the using manual labour and hiring tools (Vibrator, Cutting Machine and wilding machine) as per direction of E.I.C
Installation & commissioning of all items mentioned as in Sl no. 1& 2 including supply of all erection items, as required for installation of centrifugal pump motr sets including supplying all necessary items i.e- nut & bolt wather rubber gasket, with painting, jointing of cables termination cable soketing by suitable rated sockets and paining anticorrosive paint etc. including cost of gas cutting, welding etc. as required for complete the installation as per Hydraulic standard & IE rules in compliance by engaging skilled technician all complete as per Technical specification and upto entire satisfaction of EIC.
Making Earthing arrangement in complience with I.E rules by G.I pipe electrode with G.I funnel (50mmx 3 mtrlong) direcrt ground with supplying and fixing of G.I earth busbar drawing of 25mmx 6mm G.I earth conductor between pits and as earth busbar inside the pump house and 20mmx 3 mm GI strips for continuty to different electrica; installation i.e main switch panel and feeder box etc and making suitable size earth pit etyc all complete.
Carrying charges for unserviceable matrials ie- Pump motor set, etc from w/s scheme water supply scheme to Bankura Mechanical Division Ahilakundi with loading and unloading as per direction
Supply delivery and Installation of all equipments for leak absorbtion system at Gaseous chlorination unit comprising of the following materials FRP hood for 100 kg cylinder - 4 no Flexible pipe for hood connection- 4 no Centrifugal blower, 1000 m3/hr @ 600 mmwc (1W) -1 no Drain pump for pit -1 no 4” UPVC pipe with fittings , 15 meters -1 lot Drain pump piping, 2” - 1 lot Evoqua make chlorine leak detector with single sensor GSM Plus -1 set Sensor for leak detector Diffuser for neutralization system -1 no Control panel for neutralization-1 no Cable and conduit for neutralization -1 lot Make-As per approved vendors for electro-mechanical items of TC & GC to be submitted during delivery of materials. (Make and drawing to be approved from EIC before placement of Order) (For Installation of avove system rate is including of suitable cable protection pipe, including cable finishing, supplying of all necessary metrials and etc and cost of hiring D.G set ( if required), welding machine, cutting machine to complete the jobs including necessary cutting of cement concrete (if needed) Laying of cable from 3/3½ core sqmm on wall/surface and Painting of anty corrosive paint in all respect as per tecnical specification and as per direction of E.I.C.(Any item or accessories not considered in the specification but required to complete the entire installation and operation shall have to be supplied and installed. No extra charge shall be provided for this purpose.)
Add: 18% GST
Add: 1% Cess
DEY ENTERPRISE (BID ID -6385476)
ALPHA ENTERPRISE (BID ID -6393350)
PRADIP KUMAR DHABAL (BID ID -6410127)
EASTERN INDIA SALES AND SERVICE (BID ID -6410576)
PROGRESSIVE ENGINEERS CO OPERATIVE SOCIETY LIMITED (BID ID -6410842)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .