| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.2 CrAccepted-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | ₹54.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹54.5 Cr+₹30.5 L (0.56%)Rejected-Finance ASHOK PATH SHER E PUNJAB CHOWK ADITYAPUR JAMSHEDPUR 831013 JHARKHAND | ADITYAPUR | SARAIKELA KHARSAWAN | JHARKHAND | 831013 | ₹54.5 Cr+₹30.5 L (0.56%) | L2 | Rejected-Finance L2 |
| 3 | L3₹54.6 Cr+₹42.2 L (0.78%)Rejected-Finance | ₹54.6 Cr+₹42.2 L (0.78%) | L3 | Rejected-Finance L3 |
| 4 | L4₹56.7 Cr+₹2.5 Cr (4.61%)Rejected-Finance | ₹56.7 Cr+₹2.5 Cr (4.61%) | L4 | Rejected-Finance L4 |
| 5 | L5₹66.2 Cr+₹12.0 Cr (22.2%)Rejected-Finance AT CHAPARIA PO KOIRIDIH PS JASIDIH DIST DEOGHAR JHARKHAND PIN 814153 | GODDA | JHARKHAND | 814153 | ₹66.2 Cr+₹12.0 Cr (22.2%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MANOJ KUMAR SINGH L5 | M/S MADAN PRASAD L2 | M/s Raj Construction L1 | M/S PRASAD CONSTRUCTION & CO L4 | SARYUG GAUTAM CONSTRUCTION PVT LTD L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, levelling , ramming the foundation trenches, removing roots of trees, serbs all complete as per approved design,building specification & direction of E/I. | 10,364.45 | CUM | 148.95 ₹15,43,784.83 | 310 ₹32,12,979.5 | 132.84 ₹13,76,813.54 | 220 ₹22,80,179 | 122.31 ₹12,67,675.88 Lowest |
| 2.00 | Extra for earthwork in hard soil as per specification and direction of E /l (vide classification of soil item-B) hard soil @ 80% of tatal Excavation | 5,703.62 | CUM | 15.22 ₹86,809.1 | 28 ₹1,59,701.36 | 13.57 ₹77,398.12 Lowest | 25 ₹1,42,590.5 | 15.51 ₹88,463.15 |
| 3.00 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway inordinary rock by deploying a dozer,80HP including cutting and pushing the cut earth to site of embankment up to a distance of 100 metres (averagelead50metres) ,trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 1,782.38 | CUM | 170.81 ₹3,04,448.33 | 210 ₹3,74,299.8 | 152.34 ₹2,71,527.77 Lowest | 250 ₹4,45,595 | 174.1 ₹3,10,312.36 |
| 4.00 | Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) Sand filling in Foundation, Flooring and Below Tai Beam | 915.4 | CUM | 578.37 ₹5,29,439.9 | 620 ₹5,67,548 | 515.82 ₹4,72,181.63 Lowest | 600 ₹5,49,240 | 589.51 ₹5,39,637.45 |
| 5.00 | Providing designation 75A one Brick Flat Soling joints with local sand including cost of watering taxes royalty all complete as per building specification & direction of E/I | 5,592.5 | SQM | 349.78 ₹19,56,144.65 | 380 ₹21,25,150 | 311.96 ₹17,44,636.3 | 290 ₹16,21,825 | 288.78 ₹16,15,002.15 Lowest |
| 6.00 | Providing And Fixing in position cement concrete of specified grade excluding the coast of centering and shuttring -All work up to plinth level . 1:2:4 (1 cement :2 coarse sand(Zone-III):4 graded stone aggregate 40mm nominal size) | 543.5 | CUM | 4,418.32 ₹24,01,356.92 | 5,280 ₹28,69,680 | 3,940.5 ₹21,41,661.75 | 4,600 ₹25,00,100 | 3,647.77 ₹19,82,563 Lowest |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 12.6 | CUM | 4,047.44 ₹50,997.74 | 5,200 ₹65,520 | 3,609.73 ₹45,482.6 Lowest | 4,600 ₹57,960 | 4,125.41 ₹51,980.17 |
| 8.00 | EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 8,018.51 | CUM | 54.24 ₹4,34,923.98 | 65 ₹5,21,203.15 | 48.37 ₹3,87,855.33 Lowest | 110 ₹8,82,036.1 | 55.28 ₹4,43,263.23 |
| 9.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 Sqm. On plan including disposal of excavted earth upto 50m and lift upto 1.5 m disposal soil to be levelled and neatly dressed: | 2,000 | SQM | 104.01 ₹2,08,020 | 180 ₹3,60,000 | 92.76 ₹1,85,520 Lowest | 110 ₹2,20,000 | 106.01 ₹2,12,020 |
| 10.00 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level 1:1.5:3 (1 cement :1.50 coarse sand (Zone-III):3 graded stone aggregate 20mm nominal size) | 2,472.71 | CUM | 5,119.38 ₹1,26,58,742.12 | 6,200 ₹1,53,30,802 | 4,565.75 ₹1,12,89,775.68 | 5,500 ₹1,35,99,905 | 4,226.58 ₹1,04,51,106.63 Lowest |
Tender Value
Refer Docs
EMD Value
₹67.5 L
Closing Date
29 Jun 2026, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya, Dhurwa, Ranchi- 834004.
Construction and Renovation of New Building at Government Women Polytechnic, Ranchi for developing it as a State of the Art Institute
2026_JSBCC_114707_1
JSBCCL/30/2026-27
Open Tender
Civil Works - Buildings
Item Rate
730 days
Ranchi
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹67.5 L
JSBCCL
13 Jul 2026
2 Jun 2026
1 Jul 2026
2 Jun 2026
29 Jun 2026
2 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, levelling , ramming the foundation trenches, removing roots of trees, serbs all complete as per approved design,building specification & direction of E/I. | 10,364.45 | CUM | - | - |
| - | Extra for earthwork in hard soil as per specification and direction of E /l (vide classification of soil item-B) hard soil @ 80% of tatal Excavation | 5,703.62 | CUM | - | - |
| - | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway inordinary rock by deploying a dozer,80HP including cutting and pushing the cut earth to site of embankment up to a distance of 100 metres (averagelead50metres) ,trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 1,782.38 | CUM | - | - |
| - | Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) Sand filling in Foundation, Flooring and Below Tai Beam | 915.4 | CUM | - | - |
| - | Providing designation 75A one Brick Flat Soling joints with local sand including cost of watering taxes royalty all complete as per building specification & direction of E/I | 5,592.5 | SQM | - | - |
| - | Providing And Fixing in position cement concrete of specified grade excluding the coast of centering and shuttring -All work up to plinth level . 1:2:4 (1 cement :2 coarse sand(Zone-III):4 graded stone aggregate 40mm nominal size) | 543.5 | CUM | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 12.6 | CUM | - | - |
| - | EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 8,018.51 | CUM | - | - |
| - | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 Sqm. On plan including disposal of excavted earth upto 50m and lift upto 1.5 m disposal soil to be levelled and neatly dressed: | 2,000 | SQM | - | - |
| - | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level 1:1.5:3 (1 cement :1.50 coarse sand (Zone-III):3 graded stone aggregate 20mm nominal size) | 2,472.71 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_155127.xls
BOQ • 0.92 MB
SBD30.pdf
Tender Documents • 11.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .