| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC MAIN ROAD SINGRAULI P O SINGRAULI DISTT SINGRAULI M P 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | L1 | Accepted-AOC RECOMMENDED BY TC | |
| 2 | Rejected-Technical | - | Rejected-Technical Not Complied |
| Sl No | Description | Qty | Unit | M/S. AKANCHHA ENTERPRISES L1 |
|---|---|---|---|---|
| 0.00SCOPE OF WORK : The list of jobs per pump is as under – 1. Dismantling of pump. 2. Repairing of flange. 3. Repairing of air motor. 4. Repairing of end-rod unit. 5. Repairing of plunger unit. 6. Repairing of toggle plate. 7. Repairing of trip-rod unit. 8. Assembling & testing of pump. | ||||
| 1.01 | Total cost (Exclusive of GST) towards Dismantling of pump as per SCOPE OF WORK and NIT | 11 | job | 1,500 ₹16,500 Lowest |
| 1.02 | Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of flange (@8 hours per job) as per SCOPE OF WORK and NIT | 88 | hour | 510 ₹44,880 Lowest |
| 1.03 | Total cost (Exclusive of GST) towards Grinding charges for Repairing of flange (@1 hours per job) as per SCOPE OF WORK and NIT | 11 | hour | 270 ₹2,970 Lowest |
| 1.04 | Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of air motor (@37 hours per job) as per SCOPE OF WORK and NIT | 407 | hour | 510 ₹2,07,570 Lowest |
| 1.05 | Total cost (Exclusive of GST) towards Grinding charges for Repairing of air motor (@0.5 hours per job) as per SCOPE OF WORK and NIT | 5.5 | hour | 270 ₹1,485 Lowest |
| 1.06 | Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of end-rod unit (@34 hours per job) as per SCOPE OF WORK and NIT | 374 | hour | 510 ₹1,90,740 Lowest |
| 1.07 | Total cost (Exclusive of GST) towards Grinding charges for Repairing of end-rod unit (@0.5 hours per job) as per SCOPE OF WORK and NIT | 5.5 | hour | 270 ₹1,485 Lowest |
| 1.08 | Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of plunger unit (@28 hours per job) as per SCOPE OF WORK and NIT | 308 | hour | 570 ₹1,75,560 Lowest |
| 1.09 | Total cost (Exclusive of GST) towards Grinding charges for Repairing of plunger unit (@0.5 hours per job) as per SCOPE OF WORK and NIT | 5.5 | hour | 270 ₹1,485 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,600
Closing Date
17 Jan 2026, 11:00 amClosed
GM (Excavation), Dudhichua Area
Office of the GM (Excavation), Dudhichua Project PO Khadia, Distt. Sonebhadra, UP - 231222
Offloading work to outside agency towards Repair of 11 nos LINCOLN POWER MASTER SYSTEM Air operated Lubrication Pumps of Shovels and Draglines of Dudhichua Project
2026_NCL_350528_1
DCH/GM (Excv)/Tender/Shovel /2025-26/76
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, Dudhichua Project
Please refer Tender documents
6 documents required · 6 mandatory
₹10,600
1 Mar 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
17 Jan 2026
7 Jan 2026
6 Jan 2026 - 14 Jan 2026
SCOPE OF WORK : The list of jobs per pump is as under – 1. Dismantling of pump. 2. Repairing of flange. 3. Repairing of air motor. 4. Repairing of end-rod unit. 5. Repairing of plunger unit. 6. Repairing of toggle plate. 7. Repairing of trip-rod unit. 8. Assembling & testing of pump.
Total cost (Exclusive of GST) towards Dismantling of pump as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of flange (@8 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Grinding charges for Repairing of flange (@1 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of air motor (@37 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Grinding charges for Repairing of air motor (@0.5 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of end-rod unit (@34 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Grinding charges for Repairing of end-rod unit (@0.5 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of plunger unit (@28 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Grinding charges for Repairing of plunger unit (@0.5 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of toggle plate (@8 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Grinding charges for Repairing of toggle plate (@1 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Lathe Machine and Tools & Tackles, etc. for Repairing of trip-rod unit (@6 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Grinding charges for Repairing of trip-rod unit (@0.5 hours per job) as per SCOPE OF WORK and NIT
Total cost (Exclusive of GST) towards Assembling & testing of pump as per SCOPE OF WORK and NIT
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.57 MB
ANNEXURES.pdf
Tender Documents • 0.54 MB
ITB_COC_ATC.pdf
Tender Documents • 0.82 MB
BOQ_363280.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .