Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
24 Oct 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
COMPREHENSIVE MAINTNENACE OF ELECTRICAL PASSENGER AND GOODS LIFTS OF TKE MAKE LIFT INSTALLED AT NARAINA VIHAR AND KIRBY PLACE UNDER GE U P AND M DELHI CANTT
2026_MES_794766_1
GE(U)/PM/3011/B/JO/40/E3
Limited
Miscellaneous Works
Piece-work
30 days
Delhi Cantt
PLEASE REFER NOTICE INVITING QUOTATION
1 document required · 1 mandatory
₹0
Exempted
19 Oct 2026
19 Oct 2026
26 Oct 2026
19 Oct 2026
24 Oct 2026
19 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance of electrically operated passenger/goods lifts (Kone make)
installed at Naraina vihar lift in reliable safe and efficient operating condition through MoU
with OEM by regularly examining, lubricating and adjusting the equipments and carry out
planned maintenance in systematic and controlled manner suitable for serving Ground +
Seven & Eight floor i.e total eight and Nine landings with electric power operated doors,
auto electric levelling device as per the following locations complete all as specified and
directed by Engr-in-Charge.
(a) Naraina vihar :- Block No P-65-74 (8 Pass lift and 13 Passenger lift) = 10 Nos
Total 20 Nos lift.
(b) Kirby place :- 8 Pass lift - 03Nos & 13 Pass lift - 03 Nos
Make of Lift:- M/s TKE Pvt Ltd
Qty = 06 No lifts Total = 26 lifts
Period - 01 Each Month
Notes for Item No. 1.00 :- (i) The comprehensive maintenance shall be done through
respective OEM of existing lifts i.e. of M/s Kone Elevator India Pvt Ltd.
(ii) Retreived items are property of OEM.
(iii) Contractor will submit Tax Invoice in original before payment.
(iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as and when required for smooth and efficient
functioning of the equipment/lift.
(v) Contractor need to submit safety scurity certificate of lifts from OEM.
(vi) The OEM will also detail one technician staff to inspect the lift every week regarding
functioning of lifts or any other issues arising in the lift. | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Fwdltr1.pdf
Tender Documents • 0.19 MB
TermaAndCondition1.pdf
Additional Documents • 0.35 MB
BOQ_891369.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .