Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹52.4 L−₹60,800.50 (1.15%)Accepted-Finance 109 IIND FLOOR MADANGIR VILLAGE NEW DELHI 110 062 | SOUTH | DELHI | 110062 | H3 | Accepted-Finance QUOTED LOWEST RATE | |
| 2 | H1₹53.0 LRejected-Finance D 5 1 RANA PRATAP BAGH DELHI 110007 | NORTH | DELHI | 110007 | H1 | Rejected-Finance H1 | |
| 3 | H2₹52.7 L−₹28,319 (0.53%)Rejected-Finance | H2 | Rejected-Finance H2 | |
| 4 | Rejected-Technical | - | Rejected-Technical TECHNICALLY NOT FIT | |
| 5 | Rejected-Technical 184 SHIV NAGAR COLONY BHANPUR BHOPAL M P | - | Rejected-Technical TECHNICALLY NOT FIT |
| Sl No | Description | Qty | Unit | SINGH BROTHERS H3 | UNIQUE PRECISION CONSTRUCTION H2 | AKSHIT BUILDERS H1 |
|---|---|---|---|---|---|---|
| 1.00ITEMS TO BE EXECUTED | ||||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 5,660 | Sqmt | 17 ₹96,220 Lowest | 17 ₹96,220 Lowest | 17.7 ₹1,00,182 |
| 1.02 | Scientific earthwork in excavation done very varefully layer by layer with the help of small kudal , pickaxe , khurpa , coir brush , wire brush without damaging present structure & structure underneath (historic remains) and Stacking of servicable material at site and Removal of Unservicable material from site to dumping yard with lead upto 200 mtr. including all T & P required | 971.7 | Cum | 1,805 ₹17,53,918.5 Lowest | 1,810 ₹17,58,777 | 1,820 ₹17,68,494 |
| 1.03 | Removal of old settled debries from collpased structure manually very very carefully and stacking at one place manually. including all T & P required | 971.7 | Cum | 1,640 ₹15,93,588 Lowest | 1,650 ₹16,03,305 | 1,670 ₹16,22,739 |
| 1.04 | Preparation and chiseling of section of trench both side and preparing the surface for conservation, if required , manually very very carefully and stacking at one place manually. including all T & P required | 1,030 | Sqmt | 520 ₹5,35,600 Lowest | 540 ₹5,56,200 | 525 ₹5,40,750 |
| 1.05 | Resetting of special size brick masonry work and underpinning the brickwork ( types of brick sizes are used in structure 300 mm x 250 mm x 80 mm,430 mm x 250 mm x 80 mm,240 mm x 120 mm x 80 mm,230 mm x 220 mm x 50 mm or any other size which is found while the uncovering the structure ) with composite lime mortar 1:1:1 ratio (1 lime, 1 Surkhi 1 C.Sand ) including cost of material, carriage of material , curing and cost of labour etc complete | 25 | Cum | 7,670 ₹1,91,750 | 7,650 ₹1,91,250 Lowest | 7,780 ₹1,94,500 |
| 1.06 | Providing and laying 100mm thick lime concrete with 20mm brick aggregate nominal size mixed with 50% lime mortar in ratio of 1:1:1 (1 U/lime ,1 surkhi ,1 Sand )after compacting of loose soil, including beating and ramming for finishing the top surface and adding adhesive material comlete with in 200m lead and lift 30mtr approx. | 82.4 | Cum | 10,350 ₹8,52,840 Lowest | 10,350 ₹8,52,840 Lowest | 10,360 ₹8,53,664 |
| 1.07 | Pointing the joints of ancient brick masonry in lime mortar 1:1:1 (1 U/Lime ,1 Surkhi , 1 Sand) mixed with adhesive material including washing & cleaning of joints with cartages of material 200mtr lead and lift of 10 to 30mtr etc complete. | 438.8 | Sqmt | 490 ₹2,15,012 | 485 ₹2,12,818 Lowest | 500 ₹2,19,400 |
Tender Value
₹52.6 L
EMD Value
₹1.6 L
Closing Date
2 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA ASI Meerut Circle
Office of the SA ASI Meerut Circle Shastri Nagar Meerut
SCIENTIFIC EXCAVATION CUM CONSERVATION OF THE EXCAVATED TRENCHES OF 1950 52 EXCAVATION AT THE MOUND KNOWN AS ULTA KHERA HASTINAPUR
2026_ASI_925905_1
Nort/Meer/Hast/Moun/25714562
Open Tender
Civil Works
Works
150 days
Ulta khera Hastinapur
Please refer tender document
2 documents required · 2 mandatory
₹0
₹1.6 L
Yes
6 Oct 2026
11 Sept 2026
5 Oct 2026
11 Sept 2026
2 Oct 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEMS TO BE EXECUTED | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 5,660 | Sqmt | - | - |
| 1.02 | Scientific earthwork in excavation done very varefully layer by layer with the help of small kudal , pickaxe , khurpa , coir brush , wire brush without damaging present structure & structure underneath (historic remains) and Stacking of servicable material at site and Removal of Unservicable material from site to dumping yard with lead upto 200 mtr. including all T & P required | 971.7 | Cum | - | - |
| 1.03 | Removal of old settled debries from collpased structure manually very very carefully and stacking at one place manually. including all T & P required | 971.7 | Cum | - | - |
| 1.04 | Preparation and chiseling of section of trench both side and preparing the surface for conservation, if required , manually very very carefully and stacking at one place manually. including all T & P required | 1,030 | Sqmt | - | - |
| 1.05 | Resetting of special size brick masonry work and underpinning the brickwork ( types of brick sizes are used in structure 300 mm x 250 mm x 80 mm,430 mm x 250 mm x 80 mm,240 mm x 120 mm x 80 mm,230 mm x 220 mm x 50 mm or any other size which is found while the uncovering the structure ) with composite lime mortar 1:1:1 ratio (1 lime, 1 Surkhi 1 C.Sand ) including cost of material, carriage of material , curing and cost of labour etc complete | 25 | Cum | - | - |
| 1.06 | Providing and laying 100mm thick lime concrete with 20mm brick aggregate nominal size mixed with 50% lime mortar in ratio of 1:1:1 (1 U/lime ,1 surkhi ,1 Sand )after compacting of loose soil, including beating and ramming for finishing the top surface and adding adhesive material comlete with in 200m lead and lift 30mtr approx. | 82.4 | Cum | - | - |
| 1.07 | Pointing the joints of ancient brick masonry in lime mortar 1:1:1 (1 U/Lime ,1 Surkhi , 1 Sand) mixed with adhesive material including washing & cleaning of joints with cartages of material 200mtr lead and lift of 10 to 30mtr etc complete. | 438.8 | Sqmt | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
tend.pdf
Tender Documents • 14.43 MB
BOQ_972983.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .