| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.6 LRejected-Finance | ₹4.6 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | N. Gopalakrishnan L2 | SANDEEP CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. FOR Compound wall. | 5.25 | M3 | 147.4 ₹773.85 | 145.2 ₹762.30 |
| 2.00 | Supply and filling crusher stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 0.75 | M3 | 272.85 ₹204.64 | 270.65 ₹202.99 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 0.62 | M3 | 4,936.4 ₹3,060.57 | 4,934.2 ₹3,059.20 |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38(Grade beam) | 21.5 | M2 | 586.13 ₹12,601.80 | 583.93 ₹12,554.50 |
| 5.00 | Providing and laying in position ,Standardised Concrete Mix M-20 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials). | 2.5 | M3 | 7,841.76 ₹19,604.40 | 7,839.56 ₹19,598.90 |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 275.45 | Kg | 91.37 ₹25,167.87 | 89.17 ₹24,561.88 |
| 7.00 | Supplying and fixing Solid blocks of following size confirming to S.S.2145-1965 (Including jam blocks closers etc.,) made in CC 1:3:6(One Cement and Five M-Sand and Six HBGS Jelly) in CM 1:5(One cement and five M-sand) for masonry wall partition wall including curing neat finishing etc., complete. | 5.8 | M3 | 6,965.25 ₹40,398.45 | 6,963.05 ₹40,385.69 |
| 8.00 | Painting 2 coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete. - 10 sq.m | 54 | M2 | 143.2 ₹7,732.80 | 141 ₹7,614 |
| 9.00 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. | 54 | M2 | 143.7 ₹7,759.80 | 141.5 ₹7,641 |
| 10.00 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 54 | Kgs | 104.74 ₹5,655.96 | 102.54 ₹5,537.16 |
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
21 Apr 2025, 3:00 pmClosed
Commissioner, Tambaram Corporation
Tambaram Corporation
Construction of Compound Wall and Floor in Kamarajar Nedunchalai VAO Office in Ward No.59 Zone - 4 in Tambaram City Municipal Corporation
2025_DMA_544852_13
333/2024/E1/Z4
Open Tender
Civil Works
60 days
Tambaram Corporation Zone No.04
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,500
23 Feb 2026
12 Apr 2025
21 Apr 2025
12 Apr 2025
21 Apr 2025
12 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid