| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance | ₹8.7 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹9.1 LAccepted-Finance | ₹9.1 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | RJ ENGINEERING WORKS | SUBBAN ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth. | 98.6 | M3 | 9,564.2 ₹11,285.76 | 10,057.2 ₹11,867.50 |
| 2.00 | Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of labour, lead, lift, etc. complete. | 21.15 | M3 | 1,068.08 ₹1,260.33 | 1,120.95 ₹1,322.72 |
| 3.00 | Providing Centering and Shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift, tools, etc., complete. | 246.4 | M2 | 1,41,187.2 ₹1.7 L | 1,47,840 ₹1.7 L |
| 4.00 | Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete | 24.65 | M3 | 1,51,548.2 ₹1.8 L | 1,58,746 ₹1.9 L |
| 5.00 | Providing RCC 1:1.5:3 using OP/ PP Cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing etc., complete – excluding cost of reinforcement and form work. | 32.7 | M3 | 3,41,780.4 ₹4.0 L | 3,58,065 ₹4.2 L |
| 6.00 | Supplying & Providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc., complete. | 2,289 | Kg | 2,24,322 ₹2.6 L | 2,35,767 ₹2.8 L |
Tender Value
Refer Docs
EMD Value
₹9,200
Closing Date
5 Jan 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Rectification Works by Providing RCC Drain to the South of 275 N Road from Switchyard Barricade upto 457.5 E Road near ash Dyke Gate
2025_EB_631687_1
CE SE C TTPS Spec.No. 351 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,200
Yes
7 Jan 2026
12 Dec 2025
6 Jan 2026
12 Dec 2025
5 Jan 2026
12 Dec 2025
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth.
Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of labour, lead, lift, etc. complete.
Providing Centering and Shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift, tools, etc., complete.
Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete
Providing RCC 1:1.5:3 using OP/ PP Cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing etc., complete – excluding cost of reinforcement and form work.
Supplying & Providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc., complete.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_755526.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid