Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PLOT NO R 85 8 AEMS ENGINEERING WORKS PRIVATE LIMITED 3RD MAIN ROAD MMDA MATHUR MANALI TIRUVALLUR TAMIL NADU 600068 | CHENNAI | TAMIL NADU | 600068 | Admitted-Finance |
| 2 | Admitted-Finance OFFICE NO 2 ELLORA PLOT NO 27 CBD BELAPUR SECTOR 11 CBD BELAPUR NAVI MUMBAI THANE MAHARASHTRA 400614 | THANE | MAHARASHTRA | 400614 | Admitted-Finance |
| 3 | Admitted-Finance 802 NEPTUNE EDGE SARABHAI CAMPUS NEAR GENDA CIRCLE VADODARA GUJARAT 390007 UDYAM GJ 24 0001871 24AACCJ8103A1Z9 B R | VADODARA | GUJARAT | 390007 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 5 A 5TH FLOOR NEPTUNE TOWER PRODUCTIVITY ROAD ALKAPURI VADODARA GUJARAT 390007 UDYAM GJ 24 0001307 | VADODARA | GUJARAT | 390007 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
19 Jun 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
B.MURUGAVEL - DGM (Contracts)
CPCL, Manali - Chennai.
Columns, Vessels and Tank Maintenance Jobs during Plant-203 M and I Shutdown in Refinery-3 at CPCL - Manali
2020_DGMMC_7108_1
CC008420
Limited
Oil/Gas/Lubricants
Works
CPCL, Manali - Chennai.
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹74,000
Yes
2 Jul 2020
4 Jun 2020
19 Jun 2020
4 Jun 2020
19 Jun 2020
15 Jun 2020
180 days
Amount
PLANT-203 M&I SHUTDOWN-2020
PART-A LUMPSUM Quote Lumpsum rate for the following jobs as per the enclosed scope of work, Detailed work pacakge and scope of supply. Refer detailed work package for the list of jobs excluded from lumpsum scope
Carryout Replacement of Charcoal in Reactor (203-R-01) as per the enclosed detailed work package and Scope of work ( Volume of charcoal Replacement = 193 cum). Including blinding deblinding, internal surface cleaning and internal scaffolding
Carryout Replacement of Clay in Clay filter (203-C-07) as per the enclosed detailed work package and Scope of work. ( Volume of Clay replacement = 104cum) Including blinding deblinding, internal surface cleaning and internal scaffolding
Carryout Maintenance jobs on Plant-203 Column/ Vessels/ Tanks (Total no of Equipments :13 nos) & Perssure safety valve removal and refixing ( Total no of PSV : 42 nos)
PART-B LUMPSUM SCOPE Provide following equipments on hire basis to complete the part A lumpsum scope & unit rate jobs.
Provide Suitable crane with operator on hire basis for Replacement of Charcoal in 203-R-01 including mob and de mob charges
Provide Suitable crane with operator on hire basis for Replacement of Clay in 203-C-07 & Replacement of Salt 203-C-06 including mob and de mob charges
Provide Tractor Trailer for material shifting,etc. (24Hrs/Day)Capacity: 10 Ton , 20 Feet length.Diesel is in Contractor scope
UNIT RATE JOBS
SUPPLY, ERECTION & DISMANTLING OF STEEL SCAFFOLDING- Job Includes supply of necessary scaffolding pipes various lengths, scaffolding clamps (fixed, rolling ) and metal jolleys, ladders to complete the job as per the scope of work and work package. Job involves erection of scaffolding at the required locations using 1-1/2 inch dia steel tubular pipes with suitable clamping arrangement, providing steel gratings at the required locations firmly tied on to the scaffolding pipes, removal of the steel gratings & scaffolding materials on completion of the job. The job also includes supplying of all types of tools & tackles, l ifting arrangements like chain pulley blocks, all consumables and labour to complete the job in all respects, collection & transportation of steel scaffolding materials & steel gratings from the owner's storage point to the work site and back to owner's storage point. NOTE: (1) The above rates shall be paid in a telescopic manner within the Category. (2) For measurement, the scaffolding height shall be measured from the erected base level upto the top plank reference or the top horizontal poles. (3) The Scaffolding materials under contractor scope of supply. Required scaffolding material to be mobilised well in advance. (4) In case of either one of the activity like erection or dismantling arise, 60% of the applicable rate shall be paid for erection of scaffolding work & 40% of the applicable rate shall be paid for dismantling work.
Supply,Scaffolding Erection & Dismantling (External):
Supply, Erection & dismantling - Upto 10 mtr height of scaffolding
Supply, Erection & dismantling- Above 10 Mtr and upto 20 mtr height of scaffolding
Supply, Erection & dismantling- Above 20 Mtr and upto 30 mtr height of scaffolding
Supply, Scaffolding Erection & Dismantling (internal) For tanks only:
Supply , Erection & dismantling - Upto 10 mtr height of scaffolding
BLINDING AND DE-BLINDING - ( Unit isolation & Any additional blinds as per Manufacturing). The job includes collection & transportation of required quantity of materials like blinds, gaskets, fasteners, etc., from owner's storage point, loosening & tightening of studs (cold / gas cutting if required), wedge opening, cleaning of flanges, insertions and removal of blind & gaskets, providing new gaskets after removal of blinds, overhauling of fasteners using oil, replacing the defective studs / nuts to ensure zero leak of joints including hot bolting. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions. NOTE: (1) Nominal diameter of the flanges shall be taken for all measurements. (2) In case of either one of the activity like Blinding or de-blinding arise, 50% of the applicable rate shall be paid for the single activity. (3)This rate will be applicable only for the pipeline replcement job / modification jobs only. For all other jobs bliding & deblinding is included inlumpsum.
Blinding and deblinding for 150# & 300# ratings:
Blinding & Deblinding - Size Upto 1-1/2 inch dia.
Blinding & Deblinding - Size 2 inch dia. to 5 inch dia.
Blinding & Deblinding - Size 6 inch dia. to 10 inch dia.
Blinding & Deblinding - Size 12 inch dia. to 16 inch dia.
Blinding & Deblinding - Size 18 inch dia. to 24 inch dia.
REMOVAL / INSTALLATION / REFIXING OF FLANGED VALVES:
Removal of Flanged valves (Other than safety valves): The job includes removal of flanged valves at all grades & elevations by de-bolting / cold cutting / gas cutting and transportation of the valve to the maintenance valve shop or any other designated place inside the refinery premises for repair / disposal. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, dumping the generated scrap material to the designated area, all consumables and labour to complete the job in all respects.
Valve rating - 150# & 300#
Removal of valves - Size 2 inch dia. to 3 inch dia.
Removal of valves - Size 4 inch dia. to 6 inch dia.
Removal of valves - Size 8 inch dia. to 10 inch dia.
Removal of valves - Size 12 inch dia. to 14 inch dia.
Installation of Flanged valves (Other than safety valves): The job includes transportation of valves, gaskets, fasteners, etc., from the owner's storage point or valve maintenance shop, cleaning, checking, tightening the gland, greasing & freeing up etc., servicing of all the fasteners using oil, replacing with new fasteners wherever required, hydrotesting the valve if required, at the specified pressure at valve maintenance shop, installation of flanged valve at all heights & grades using proper gaskets & studs. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, dumping the generated scrap material to the designated area, all consumables and labour to complete the job in all respects.
Valve rating - 150# & 300#
Installation of valves - Size 2 inch dia. to 3 inch dia.
Installation of valves - Size 4 inch dia. to 6 inch dia.
Installation of valves - Size 8 inch dia. to 10 inch dia.
Installation of valves - Size 12 inch dia. to 14 inch dia.
HYDROTESTING: The job involves hydrotesting of columns / vessels / drums, etc., & steam coil as per the specified test pressure. The job also involves fabrication of suitable manifolds, if required, filling connections etc., and drain out all the entrapped water from the equipment. The job also includes supplying of all types of tools & tackles, suitable test pumps, pressure gauges, machineries, all consumables and labour to complete the job in all respects.
Hydrotesting of column / vessel / drum, etc.,:
Hydrotesting of column / vessel / drum, etc., (Upto 10 Cu.mtr of an equipment)
Hydrotesting of column / vessel / drum, etc., (Beyond 10 Cu.mtr of an equipment)
UNLOADING / LOADING OF SALT ( 203-C-06): The job involves preparing necessary chute, etc, unloading the random packing / rashig rings / catalyst / alumina balls / sand / pebbles / resin, etc. from the vessel insides to ground level, cleaning these material wherever required, sieving, segregating the good ones, replenish for the damaged ones with new material (replacement quantity may vary upto full quantity based on EIC instructions), and reloading the material into the vessel as per the instructions of EIC. Job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, collection of new material from the owner's storage point, transportation of unused materials to owner's storage point and dumping the generated scrap material to the owner's designated place.
Collection of slat from the owner's storage point & transporting to the work place
Transportation of the discarded salt to the designated place within the refinery premises
Unloading / Loading of Salt
Unloading Salt from the vessel
Loading Salt into the vessel
SUPPLY AND APPLIVAITON OF SPECIAL PAINTING SYSTE (CPCL PAINTING SYSTEM XXVII): "Supply and application of internal painting as per enclosed CPCL Painting specification XXVII with surface prepation by metal grit blasting for 203-C-07 Clay filter internal surface.Paint application by air less spray. Necessary hopper and compressor and accesories to carryout the jobs is in contractor scope "
"Supply and application of internal painting as per enclosed CPCL Painting specification XXVII with surface prepation by metal grit blasting for 203-C-07 Clay filter internal surface.Paint application by air less spray. Necessary hopper and compressor and accesories to carryout the jobs is in contractor scope"
Carbon Steel Piping Work - Above ground: The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, bevelling, fabrication, laying, welding & erection of carbon steel piping at all locations above ground level, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations including under road culverts. The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc., all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications. The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required. The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using E 6010 / E 6013 / E 7018 electrodes / ER 70S2 filler wire as required, Post weld heat treatment (PWHT - stress relieving) after welding wherever required, DPT wherever required, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to the designated area as per EIC instructions. The rates for the following items shall be exclusive of blinding & deblinding, radiography, stress relieving, reinforcement pad welding, removal of old piping for replacement and erection & removal of scaffolding. The rates for the following items shall be inclusive of fabrication, laying, erection, welding, providing shoe supports, pads at support locations, flushing of the piping system, offering stagewise inspection, hydrotesting, draining / drying of the piping system and removal of insulation wherever required. WITH CPCL SUPPLY OF FREE POWER & CONTRACTOR'S WELDING MACHINE. NOTES FOR SOR SL. NOS. (1) Thickness of piping for measurement shall be based on the relevant ANSI or equivalent standards. (2) The finished weld joint elevation at site shall be taken as reference for measurement, wherever applicable. (3) The rates for socket & fillet welding in piping shall remain same for all thickness and elevations as per SOR. (4) Rate for weld joints of vents & drains shall be paid on actual measurement using the applicable SOR. (5) For reinforcement pad welding, the rates shall be paid separately as per SOR. (6) Fabrication & welding of pipe shoe supports & pad at support locations are included in SOR and will not be considered for measurement. (7) For scaffolding work wherever required, rates shall be paid separately as per SOR. (8) For blinding & deblinding wherever involved, rates shall be paid separately as per SOR. (10) In case of replacement of existing piping, rates for removal of old pipelines shall be paid separately as per SOR. (11) During hydrotesting of the above piping jobs, some portions of the existing piping in the circuit required to be hydrotested depending on the blinding and the same is included in the applicable welding SOR. (12) Radiography of weld joints is not included in SOR and rate shall be as per SOR. (13) For removal and refixing of Flanged valves, rates shall be paid separately as per SOR.
SOCKET WELDING - ALL ELEVATIONS:
Carbon Steel - Above ground Piping - Socket / fillet welding Joint - With Hydrotest
Carbon Steel - Above ground Piping - Socket / fillet welding Joint - Without Hydrotest
BUTT WELDING - ABOVE GROUND LEVEL - USING E-6010/E-6013 / E-7018 ELECTRODES:
Carbon Steel - Above ground Piping - Butt welding Joint - Upto 8.8 mm thickness - With hydrotest
Carbon Steel - Above ground Piping - Butt welding Joint - Upto 8.8 mm thickness - Without hydrotest
Carbon Steel - Above ground Piping - Butt welding Joint - Above 8.8 mm and upto 12.7 mm thickness - Without hydrotest (Root E-6010 / Filling E-6013 / E-7018)
Patch plate welding - Carbon steel: Patch plate welding - Carbon steel - using E 6013 electrodes. The job includes collection & transportation of required materials from owner's storage point, marking to the required size, cutting, bending to the desired curvature wherever required, edge preparation, fit up & fillet welding on all four sides using E 6013 electrodes, flushing the finished weld surface by grinding and offering DPT at all grades & elevations. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions. NOTE: (1) The above rates are applicable for all external welding jobs.
Patch plate welding - Carbon steel - Upto 6 mm thickness
Patch plate welding - Carbon steel - Upto 8 mm thick
Gas Cutting of Plates - Carbon Steel / Alloy steel: The job includes gas cutting of carbon steel / Alloy steel plates at all heights & grades including area preparation for hot work. The job also includes supplying of all types of tools & tackles, machineries, gas, all consumables and labour to complete the job in all respects and dumping the generated scrap material to designated area as per EIC instructions.
Gas Cutting of Plates - Carbon Steel / Alloy steel - Thickness upto 6 mm
Gas Cutting of Plates-Carbon Steel / Alloy steel-Thickness 8 mm
Dismantling & Removal of Piping: The job involves removal of existing above ground, under ground, overhead insulated or uninsulated or steam traced piping including all types of fittings like elbows / tees / reducers, etc., flanges, valves, all types of instruments, supports by cold cutting / gas cutting / grinding, etc., at all locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, transportation of the same to the designated area as per the instructions of Engineer-in-charge. The insulation materials to be removed from the pipes and transported to their respective designated locations as per EIC. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects. NOTE: (1) For scaffolding work wherever required, rates shall be paid separately
Dismantling & removal of Piping - Carbon steel / Alloy steel:
Dismantling & removal of Piping - Carbon steel / Alloy steel
FILLET WELDING: Fillet welding - Carbon Steel (Using E-6013 Electrode). The job includes flushing, preparing work area for executing hot work, grinding, fillet welding on plate surfaces using E 6013 electrodes at all grades & elevations. The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
Fillet welding - Carbon Steel - 5 to 6 mm thickness using E 6013 electrodes
Fillet welding - Carbon Steel - 8 mm thickness using E 6013 electrodes
Fillet welding - Carbon Steel (Using E-6013 Electrode) - Inside Columns / Vessels. The job includes flushing, preparing work area for executing hot work, grinding, fillet welding on plate surfaces using E 6013 electrodes at all grades & elevations. The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
Fillet welding - Carbon Steel - 5 to 6 mm thickness using E 6013 electrodes (Inside columns / Vessels)
Fillet welding - Carbon Steel - 8 mm thickness using E 6013 electrodes (Inside columns / Vessels)
NOZZLES REPLACEMENT: Job involves removal of old / worn out nozzles as marked by Inspection, transportation of the required quantity of pipes, fittings, plates from owners storage point, cutting, grinding, edge preparation of pipes, etc to match with the mating edges, erection of nozzles, reinforcement pad in position, welding (Root - E-6010 Electrode & Filling E-6013/E-7018 Electrodes), radiography, Stress relieving, DPT, pad pneumatic testing, nozzle testing etc., as per codes / specifications / Inspection procedures. Job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.tions. Job also includes cleaning of all foreign materials like weld spatters, clamps, fixtures, etc., prior to testing. NOTE: (1) Thickness of piping for measurement shall be based on the relevant ANSI or equivalent standards.
Nozzle replacement with reinforcement pad including Nozzle & reinforcement testing - Pipe thickness upto 8.8 mm thick EA = Inch dia of nozzle
Nozzle replacement with reinforcement pad including Nozzle & reinforcement testing - Pipe thickness above 8.8 & upto 12.7 mm thick EA= Inch dia of nozzle
Fabrication & erection of structurals: The job includes fabrication and erection of carbon steel structurals in position such as platforms, ladders, stairs, brackets, pipe supports, pipe shoe, using the structural materials like angles, flats, channels, beams, rounds, plates etc. at all grades & elevations. The job also includes transportation of the required structural materials from owner's storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning ba ck the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions. NOTE: (1) For scaffolding work wherever required, rates shall be paid separately as per SOR.
Fabrication and erection of structurals.
Fabrication and erection of structurals
Dismantling & Removal of Structurals / Gratings: The job involves removal of existing above ground, overhead structurals including platforms, ladders, GI & steel gratings by unfastening / cold cutting / gas cutting / grinding, etc., from various locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, transportation of the same to the designated area or scrap yard as per the instructions of Engineer-in-charge including weighment of the material at the appropriate place within the refinery premises, if required. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.
Dismantling & Removal of Structurals / Gratings:
Dismantling & Removal of Structurals / Gratings
Erection and welding of Platform / ladder gratings: The job includes erection & welding of gratings in position under the support structure in columns, vessels, tanks, staircase, platforms, step ladders, etc., at all grades & elevations with necessary corrections at work site on the supplied grating to fit to the site requirements. The job also includes transportation of the required structural materials from owner's storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.
Erection and welding of Gratings
Erection and welding of Gratings upto 15 m elevation
Erection and welding of Gratings above 15 m elevation
Plate Rolling: The job includes spreading the required plate for marking, cutting, marking of plates, edge preparation, chipping, shifting of plate to rolling machine, rolling of plates including transportation and shifting of rolled plates to work site. The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.
Plate Rolling - Carbon steel / Alloy Steel - 6 to 10 mm thickness
RADIOGRAPHY: The job includes performing radiography examination of welds on piping & all type of equipments as per relevant ASME / ASTM standards & as per CPCL specification CPCL-INSP-RAD-01 at all grades & elevations with film width not less than 4 inches. The job also includes supplying of radiation source camera, other machineries required, all consumables required for filming & developing, transportation of camera, etc., area preparation before starting the job, labour, supervision to complete the job in all respects including preparation of developing chemicals, developing the films & submission of films for inspection review. NOTE: (1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement.
Pipe weld joints - Upto 2" nominal dia
Pipe weld joints - 3" nominal dia
Pipe weld joints - 4" nominal dia
Pipe weld joints - 6" nominal dia
Weld joint size - above 6" nominal dia and weld seams of storage tanks, pressure vessels and plate welds EA= Inch length of Film
STRESS RELIEVING: The job involves Post weld heat treatment (PWHT) / Stress relieving of carbon steel / alloy steel metal surfaces, weld seams or HAZ, etc., shop fabricated or site fabricated or existing piping / static equipment at all grades & elevation. The job also includes cleaning the adjoining surfaces, welding of required thermocouples, insulating the portion using super fine glass wool / asbestos tape, heating the metal surface using a induction heating equipment as per the requirement, ensuring uniform temperature attainment at all points, recording the temperatures by means of thermocouples / pyrometer / automatic temperature recorders suitably calibrated, removal of insulation, providing assitance for hardness testing, submitting recorded charts for approval, removal & dressing of thermocouple leads, etc., as per the instructions of EIC. The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site. NOTE: (1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement. (2) For plate weld seams, actual inch length of weld seam shall be taken for measurement. (4) Re-stress relieving arised due to improper heating / cooling or any other fault on account of contractor shall be borne by the contractor at his own cost.
Stress Relieving - Pipe weld joints
Stress Relieving - Plate weld seams of tanks, columns, vessels, exchangers, etc., UNIT EA= INCH LENGTH
TANK MAINTENANCE JOBS SURFACE PREPARATION - POWER TOOL CLEANING / BUFFING: The job includes mechanical cleaning of metal surfaces to SSPC - SP-2 / St3 Power tool cleaning standards using power tools like buffing wheels / grinding machine / rotating steel wire brush, etc., to make the surface free of rust, scales, dirt, grease / oil, etc., for the purpose of painting / conducting Wet flourescent magnetic particle testing or dye penetrant inspection or diesel chalk testing on welds / HAZ's. The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects including assistance during Wet flourescent magnetic particle testing inspection or dye penetrant inspection or diesel chalk testing on welds / HAZ's, if required. NOTE: (1) For weld seam buffing the width of buffing shall be 150mm (i.e) 75mm on both sides of the weld seam.
Power tool cleaning / Buffing to SSPC - SP-2 / St3 standards - Bulk area
Power tool cleaning / Buffing to SSPC - SP-2 / St3 standards - 150 mm width of Weld seams / HAZ
VACCUM BOX TESTING: The job includes supply of vacumm box facility including vacuum pump, etc., testing the tank roof & bottom plate weld seams & HAZ areas using vacuum box / soap solution at all grades & elevations. The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site. NOTE: (1) For surface preparation of weld seams / HAZ by buffing, rates are additionally paid as per SOR.
Vacuum box testing of welds / HAZ
Buffing and DIESEL CHALK TESTING of Shell / annular plate location The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.
Buffing with Diesel chalk test of weld seams including buffing
PNEUMATIC TESTING OF NOZZLE PADS: Clean the shell nozzles & pad welds and carry out pneumatic testing as per the scope. The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.
Pneumatic testing of nozzle pads
PNEUMATIC TESTING OF ROOF WELD SEAMS: Carry out the pneumatic testing of all roof weld seams at 50mm of water column. The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.
203-D-01: (1.86 % WT CAUSTIC STORAGE TANK)
203-D-02 (SPENT CAUSTIC STORAGE TANK)
203-D-03 (6.6%WT CAUSTIC STORAGE TANK)
Replacement of Anchor chair bolt as per procedure. The job involves Cutting and removal of the anchor chair bolt / repair / Replacement of the anchor chair bolt of the tank as per proc edure. The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.
Replacement of Anchor chair bolt
MECHANICAL LEVEL INDICATOR REPAIR / REPLACEMENT: "The job involves repair/Replacement of the Mechanical Levl Indicator of the tank" The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.
Mechanical Level Indicator Repair/Replacement
Weld repairs / reinforcement on Bottom Plate weld seams: Carbon Steel (Using E-6013 Electrode). The job includes flushing, preparing work area for executing hot work, grinding & welding using E 6013 electrodes at all grades & elevations. The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
Weld repairs / reinforcement on Bottom Plate weld seams
SUPPLY OF SEMI SKILLED LABOUR: Provide semi skilled labour assistance for 12 hr shift basis for operator / technician Assistance
Provide semi skilled labour assistance for 12 hr shift basis for operator / technician Assistance
Logos Engineering Pvt Ltd
Radiant Hitech Eng Pvt Ltd
JECON ENGINEERS PVT. LTD.
EXCELLENT PROJECTS (I) PVT. LTD.
Shilpi Engineering Pvt Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .