| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.5 LAccepted-AOC 21 4 21 3 CENTRAL PARK JADAVPUR KOLKATA 700 032 | KOLKATA | KOLKATA | WEST BENGAL | 700032 | ₹92.5 L Quoted ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹24.4 L (19.3%)Rejected-Finance GCC2 9CP ADARSHA NAGAR KOLKATA WEST BENGAL 700107 | KOLKATA | KOLKATA | WEST BENGAL | 700107 | ₹1.5 Cr+₹24.4 L (19.3%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 Cr+₹26.0 L (20.6%)Rejected-Finance 3A RIPON STREET KOLKATA KOLKATA WEST BENGAL 700016 | KOLKATA | WEST BENGAL | 700016 | ₹1.5 Cr+₹26.0 L (20.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 Cr+₹55.1 L (43.8%)Rejected-Finance 501 503 PLOT NO 2 BEST BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | ₹1.8 Cr+₹55.1 L (43.8%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
1 Nov 2021, 2:00 pmClosed
MD, WBMSCL
Swasthya Bhawan, GN-29, GN Block, Sector V, Bidhannagar, Kolkata, West Bengal 700091
DSIC Operation and Maintenance of Medical Gas Pipeline System at Belda SSH of West Bengal for 5 years
2021_WBMSC_345955_1
WBMSCL/NIT-325/2021, Dated -24.09.2021
Open Tender
MECHANICAL
Item Rate
90 days
Belda SSH at Paschim Medinipore District
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2 L
Board Room, WBMSCL
30 Dec 2021
30 Sept 2021
2 Nov 2021
30 Sept 2021
1 Nov 2021
5 Oct 2021
30 Sept 2021 - 1 Oct 2021
1 Oct 2021
Amount
Design, Supply, Installation, Testing, Commissioning of OXYGEN SYSTEM
2 x 10 size Main manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc. as required for the complete manifold system as per standards
2 x 5 size emergency manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc. as required for the complete manifold system as per standards
Fully Automatic control panel Indigenous for Oxygen Having a constant delivery flow capacity of 1500 lpm to 2000 lpm or above at 4.2 bar pressure as per Standards
Surface/panel/pendant mounted front loading double lock Oxygen outlets with matching Adapters (BS type) as per standards
Oxygen Flowmeter & Humidifier Bottle with matching adapters: Back Pressure Compensated Flow meter within a range of 0-15 LPM where 0-5 LPM should be with expanded scale. Humidifier bottle should be made of unbreakable polycarbonate materials and autoclavable at 121 degree Centigrade (to be supplied along with required low pressure tubing and face mask) as per standards
H.P. tubing having anti static core white color 5mtrs with kit conversion for Oxygen
Design, Supply, Installation, Testing, Commissioning of NITROUS OXIDE SYSTEM
2 x 2 size manifold (Primary & Secondary supply) complete with middle frame with chain for individual cylinder along with Non Return Valves for every cylinder, Safety Valve, etc. as required for the complete manifold system as per standards.
Fully Automatic control panel Indigenous for Nitrous Oxide Having a constant delivery flow capacity of 1000 lpm or above at 4.2 bar pressure as per Standards
2 cylinder Emergency Nitrous oxide arrangement using a high flow double stage Regulator with gauges complete with middle frame with chain for individual cylinder along with Non Return Valves for every cylinder as per standards
Surface/panel/pendant mounted front loading double lock Nitrous Oxide outlets with matching Adapters (BS type) as per standards
H.P. tubing having antistatic core Blue color 5 mtrs. with Kit conversion for Nitrous Oxide as per ISO Standards
Design, Supply, Installation, Testing, Commissioning of COMPRESSED AIR SYSTEM
Compressed Air System complete with 3 nos. of non-lubricated, Reciprocating each of 15 HP Motor with 57 cfm capacity at 8.5Kg/cm2 pressure with Isolation Valve for each compressor, 2 nos. Air dryer with by-pass valve arrangement, Duplex Pressure Reducing Unit each for Air 4 bar & 7 Bar valve arrangement Flexible High pressure SS Hose for each compressor NRV for each compressor, 1 no. Air Receiver of 1500 litre capacity with Safety Valve and interconnecting pipelines, Pressure Gauge with Valve Arrangement in the Air Receiver Valve – Upstream of Air Receiver Automatic Drain Arrangement for air receivers Air Compressor By pass line Pressure Gauge with Valve arrangement in Main line Isolation Valve in the main line
Supply, Installation, Testing and commissioning of 4-stage air filtration system (suitable for 15 HP Compressor) as per ISO 8573.1.
Surface/panel/pendant mounted front loading double lock Medical Air-4 bar Outlets with matching Adapters (BS type) as per standards
Surface/panel/pendant mounted front loading double lock Surgical Air-7 bar Outlets with matching Adapters (BS type) as per standards
HP colour coded black Tubing having anti static core as per ISO Standards
Design, Supply, Installation, Testing, Commissioning of VACUUM SYSTEM
Vacuum Central System Complete with 3 nos. Vacuum Pumps each having 149 cfm PD with Filter, interconnecting pipes, NRV, auto switch gear assy., exhaust silencer And Receiver – 1 No. 2000 liters, 2 nos. Bactria Filters, oil trap filter, etc. NRV for each Vacuum Pump Isolation Valve for each Vacuum Pump Valve - Upstream of Vacuum Receiver Vacuum Drain valve with flask arrangement Filters for each vacuum pump Silencer for each vacuum pump.
Surface/panel/pendant mounted front loading double lock Vacuum Outlets (BS Type) with matching Adapters
Ward vacuum Unit : It shall include vacuum regulator along with 0-760 mm of Hg vacuum gauge,600 ml capacity reusable poly carbonate collection bottle with overflow safety trap and autoclavable at 121 degree Centigrade with plastic slide wall mounted type (to be supplied along with required low pressure tubing with catheter).
Theatre Vacuum Unit: It shall be trolley mounted. The unit shall include one regulator along with 0-760 mm of Hg vacuum gauge mounted on the trolley stand, having two reusable collection bottles each of 2000 ml capacity and made of unbreakable polycarbonate materials, autoclavable at 121° Centigrade, having over flow safety trap, mounted on the base of trolley unit made of aluminium along with castor wheels and connected with regulator & low pressure tube inter-connections (along with required low pressure tubing with catheter).
Low Pressure Tubing having anti static core as per ISO Standards
High Pressure Tubing having anti static core as per ISO Standards
Supply, Installation, Testing and commissioning of Combined Electrical Control Panel for Vacuum System (149 cfm each) & Compressed Air system (15HP each) with Triplex/Triplex/ Cascading/ Sequencing facilities and complete with plant Room wiring .
Design, Supply, Installation, Testing, Commissioning of Distribution Copper Pipe
12 mm OD x 0.7 mm thick copper pipe
15 mm OD x 0.9 mm thick copper pipe
22 mm OD x 0.9 mm thick copper pipe
28 mm OD x 0.9 mm thick copper pipe
42 mm OD x 1.2 mm thick copper pipe
54 mm OD x 1.2 mm thick copper pipe
Design, Supply, Installation, Testing, Commissioning of Isolation Valve
Isolation Valve 15 mm
Isolation Valve 22 mm
Isolation Valve 28 mm
Isolation Valve 42 mm
Isolation Valve 54 mm
Design, Supply, Installation, Testing, Commissioning of Area Valve Service Unit
2 gas valve box configuration with size 15 O2, 22 VAC
3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC
4 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 22 VAC
5 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC
Design, Supply, Installation, Testing, Commissioning of Medical Gas Digital Area Alarm System as per standards
2 service alarm configuration for O2 and VAC
3 service alarm configuration for O2, MA4, VAC
4 service alarm configuration for O2, N2O, MA4, VAC
5 service alarm configuration for O2, N2O, MA4, SA7, VAC
Design, Supply, Installation, Testing, Commissioning of Ceiling Pendants
Ceiling Anesthetist Pendants for OT: Supply, Installation, Testing and commissioning of Single Arm Ceiling Pendant with 8 nos. of Gas & Vacuum Outlets (2-Oxygen, 2-N2O, 2-Air 4 bar, 2-Vac)
Ceiling Surgeon Pendants for OT: Supply, Installation, Testing and commissioning of Single Arm Ceiling Pendant with 8 nos. of Gas & Vacuum Outlets (2-Oxygen, 1-N2O, 1-Air 4 bar, 2-Air 7 bar, 2-Vac)
Testing, Commissioning of Distribution Copper Pipe
12 mm OD x 0.7 mm thick copper pipe
15 mm OD x 0.9 mm thick copper pipe
22 mm OD x 0.9 mm thick copper pipe
28 mm OD x 0.9 mm thick copper pipe
42 mm OD x 1.2 mm thick copper pipe
Testing, Commissioning of Isolation Valve
Isolation Valve 15 mm
Isolation Valve 22 mm
Isolation Valve 28 mm
Testing, Commissioning of Area Valve Service Unit
2 gas valve box configuration with size 15 O2, 22 VAC
3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC
5 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC
Installation, Testing, Commissioning of Distribution Copper Pipe
12 mm OD x 0.7 mm thick copper pipe
15 mm OD x 0.9 mm thick copper pipe
22 mm OD x 0.9 mm thick copper pipe
28 mm OD x 0.9 mm thick copper pipe
42 mm OD x 1.2 mm thick copper pipe
54 mm OD x 1.2 mm thick copper pipe
Installation, Testing, Commissioning of Isolation Valve
Isolation Valve 15 mm
Isolation Valve 22 mm
Isolation Valve 28 mm
Isolation Valve 42 mm
Isolation Valve 54 mm
Installation, Testing, Commissioning of Area Valve Service Unit
2 gas valve box configuration with size 15 O2, 22 VAC
3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC
4 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 22 VAC
5 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC
Installation, Testing, Commissioning of Medical Gas Digital Area Alarm System as per standards
2 service alarm configuration for O2 and VAC
3 service alarm configuration for O2, MA4, VAC
4 service alarm configuration for O2, N2O, MA4, VAC
5 service alarm configuration for O2, N2O, MA4, SA7, VAC
Operation & Comprehensive Maintenance for entire MGPS charges
Operation & Comprehensive Maintenance charges for the 1st Year
O&M charges for Year 2
O&M charges for Year 3
O&M charges for Year 4
O&M charges for Year 5
ovaron infrastructure & mep services
ELLENBARRIE INDUSTRIAL GASES LIMITED
PES Installations Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .