Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
23 May 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Jt . MANAGING DIRECTOR
12, R N MUKHERJEE ROAD KOLKATA-700001
Construction of Switch and Meter Room for 11 K.V H.T. Power connection from CESC at Kasba Depot
2025_CTC_841124_1
WBTC/JMD/NIT-427/2022-23 (6th Call)
Open Tender
CIVIL WORKS
Item Rate
60 days
KOLKATA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹11,000
12 Jun 2025
1 May 2025
26 May 2025
1 May 2025
23 May 2025
1 May 2025
Amount
Dismantling all types of plain cement concrete works and removing rubbish as directed within a lead of 75 m In ground floor including roof upto 150 mm. Thick
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor, Proportion 6 : 3 : 1
Ordinary cement concrete M-15 grade (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. Pakur Variety
Supplying ready mixed concrete of M 25 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [cement to be supplied by the Manufacturer/ supplier] In Ground Floor and Foundation.With approved concrete pump.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete including fitting, fixing and striking out after completion of works (up to roof of ground floor), 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and up to roof of ground floor/up to 4 m Tor steel/Mild Steel.
Brick work with 1st class bricks in cement mortar (1:6) in foundation and plinth .
Brick work with 1st class bricks in cement mortar (1:6) In superstructure, ground floor
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary 9Ground floor). [excluding cost of chipping over concrete surface] cement Morter, 15 mm. thick plaster. (1 : 6)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar 15 mm thick plaster
25 mm. thick damp proof with cement concrete (1:1.5:3) (with graded stone aggregate 10 mm. normal size) and painting the top surface with a coat of bitumen [VG.40 ] using 1.7 kg. per sq.m. including heating the bitumen and cost and carriage of all materials complete. [Bitument to be supplied by the Agency]
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement 35 mm. thick
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. Note : Cement 0.152 cu.m. per 100 sq.m.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand.
Supplying, fitting and fixing steel rolling shutter profile type with 18 B.G . of approved type steel latche section 75mm wide, fitted with coil wire spring to necessiate the fitting of required Nos. of C.I. Pulleys on heavy type solid drawn seamless steel tube complete with locking arrangements both inside and outside specially built up side guide channels including providing a hood for the steel rolling shutter in the room, painting two coats of approved aluminium paint over a coat of red lead primer complete.
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. Super Protective 100% Acrylic Emulsion.
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including moothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On timber or plastered surface : With super gloss (hi-gloss) -Two coats (with any shade except white)
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as perdirection of Engineer in charge.
Special Note : 1. Specification of the Individual item would be followed as per presidency circle schedule P.W.D. Govt. of West Bengal, currently in vogue. However, the payment would be made as per actual work done and joint measurement at site. 2. Steel and cement to be supplied by the agency at their own arrangement and the rate should be quoted accordingly, Cement - JINDAL (JSW), A.C.C., Ambuja, Ultratech brand to be supplied and steel - SAIL, SRMB, TATA, RINL brand to be supplied, if any. For Ready Mix Concrete, any of the following brand should be used by the vendor; Ultratech / Ambuja / A.C.C. / JSW. All challans copy of RMC, duly authenticated by the agency, have to be submitted to this Company. 3. All information regarding site conditions would be obtained before quoting their rates. 4. The security deposit should be deducted by the company as per prevailing rules. The said security deposit shall be refunded on the expiry of six (6) months (as defect liability period) after completion of the work. Refund of security deposit shall be allowed till the final bill has been prepared and passed. 5. The rate of GST will be effected separately, as applicable. 6. The IT and any other Tax, as applicable, would be deducted from the bill amount.
XENON PROJECTS AND INFRASTRUCTURE (BID ID -6433938)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .