Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
15 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
the Executive Engineer NH Dn Hubli
Office of the Executive Engineer NH Dn Vishweshwar Nagar Hubli-580032
Improvements to Huilgol Balaganur Lingdal Road MDR Km.11.90 to Km.12.40 Gadag Taluk Gadag Dist under Central Road Infrastructure Fund (Job No CRF-KNT-2026-27-244)
2026_MoRTH_934405_1
EE/NH/HBL/PB1/2/2026/27/1533-4 Dt16/11/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Huilgol
As per Tender Doc
6 documents required · 6 mandatory
₹2,447
the Executive Engineer NH Dn Hubli
₹2.0 L
16 Nov 2026
16 Nov 2026
16 Dec 2026
16 Nov 2026
15 Dec 2026
16 Nov 2026
135 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete. ii.A. Light Jungle with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 0.06 | Ha | 32,646 | ₹1,958.76 |
| - | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads including all labour, usage charges of all machinery etc., complete. i) By Mechanical Means using Hydraulic excavator, with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 563 | Sqm | 8.1 | ₹4,560.3 |
| - | Excavation for roadwork in soil by hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location, with all lifts and lead,including all labour, usage charges of all machinery etc., complete. with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 1,875 | Cum | 105 | ₹1,96,875 |
| - | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete. (New road formation) with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 1,475 | Cum | 475 | ₹7,00,625 |
| - | Granular Sub-Base Construction of granular sub-base by providing spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401, including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete. (Compacted thickness) (Table:- 400-1) Place mix method - B(v)-Grading-V Material (Close graded) with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 391.15 | Cum | 2,246 | ₹8,78,518.41 |
| - | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, (Compacted thickness).B.Laying Using Grader, with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 412.5 | Cum | 2,440 | ₹10,06,500 |
| - | Plain Cement Pavement Quality M30 grade Concrete (RMC)
with OPC & GGBS laid without PaverConstruction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008 ,Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. | 560.07 | Cum | 6,639 | ₹37,18,271.54 |
| - | Providing Cement Concrete interlaying blocks
Providing and laying of 60 mm thick factory made pre cast M 30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 32.18 | Cum | 1,068 | ₹34,362.9 |
| - | Groove Cutting: Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete including subsequent widening of the groove 8 to 10 mm. wide at top having depth of 15 mm. with all lead and lifts, and as per the directions of Engineer-in-charge of the Work | 550 | mtr | 70 | ₹38,500 |
| - | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, traffic diversion as per IRC-35, cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffuc control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete.
i) 2.5 mm thick | 105 | Sqm | 635 | ₹66,675 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
244KW3.pdf
Tender Documents • 0.82 MB
Generalconditions244.pdf
Additional Documents • 0.39 MB
Documentstobesubmit.pdf
Additional Documents • 0.21 MB
BOQ_981925.xls
BOQ • 0.30 MB
Corrigendumnotification1.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .