| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.4 LAccepted-AOC 2A EAST MGR NAGAR KRISHNA COLONY SINGANALLUR COIMBATORE 641 005 | COIMBATORE | TAMIL NADU | 641005 | ₹49.4 L | L1 | Accepted-AOC Accept |
| 2 | L2₹50.8 LRejected-AOC | ₹50.8 L | L2 | Rejected-AOC Reject |
| Rank | Bidder | Total Amount |
|---|---|---|
| L1 | meghavarna Bid ID 1599953 | ₹49,35,963.42 |
| L2 | RV Constructions Bid ID 1608288 | ₹50,84,951.8 |
| Sl No | Description | Qty | Unit | meghavarna L1 | RV Constructions L2 |
|---|---|---|---|---|---|
| 2.00Construction of RCC Retainig Wall and Cut - off Wall For high level Bridge Near Pachanvayal H/O Ikkaraiboluvampatti panchayat | |||||
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank, with all leads and lifts as per SS208 including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions,trimming bottom of excavation back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF Retainingwall | 268.8 | cum | 413 ₹1,11,014.4 | 450 ₹1,20,960 |
| 4.00 | Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4, using 40mm, 20mm and 10mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW THE FOOTINGS OF RCC RETAINING WALLS. | 16.8 | cum | 5,212 ₹87,561.6 | 5,300 ₹89,040 |
| 5.00 | Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for FOOTINGS OF RCC RETAINING WALLS. | 102.6 | cum | 10,016 ₹10,27,641.6 | 10,500 ₹10,77,300 |
| 6.00 | Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE RETAINING WALLS. | 120 | RM | 193 ₹23,160 | 200 ₹24,000 |
| 7.00 | Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS. | 126.25 | cum | 11,895 ₹15,01,743.75 | 12,000 ₹15,15,000 |
| 8.00 | Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade. | 9.25 | MT | 94,750 ₹8,76,721.75 | 95,000 ₹8,79,035 |
| 9.00 | Supplying and filling of conveyed earth with a lead of 5 km | 1,369.5 | cum | 165 ₹2,25,967.5 | 200 ₹2,73,900 |
| 10.00Cut - off Wall | |||||
| 11.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil | 45.12 | cum | 263 ₹11,866.56 | 265 ₹11,956.8 |
Tender Value
₹49.9 L
EMD Value
₹49,850
Closing Date
19 Feb 2026, 3:00 pmClosed
Block Development officer (BP)
Block Development office Madampatti Main road thondamuthur 641109
Construction of RCC Retainig wall and cut-off wall for High Level Bridge near Panchavayal palayapathi H/O Ikkarai Boluvampatti panchayat
2026_RDTN_657084_1
1909/2025/A3-1
Open Tender
Civil Works
Ikkarai Boluvampatti
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹49,850
Yes
Block Development office thondamuthur
3 Mar 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
18 Feb 2026
Construction of RCC Retainig Wall and Cut - off Wall For high level Bridge Near Pachanvayal H/O Ikkaraiboluvampatti panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank, with all leads and lifts as per SS208 including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions,trimming bottom of excavation back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF Retainingwall
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4, using 40mm, 20mm and 10mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW THE FOOTINGS OF RCC RETAINING WALLS.
Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for FOOTINGS OF RCC RETAINING WALLS.
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE RETAINING WALLS.
Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Supplying and filling of conveyed earth with a lead of 5 km
Cut - off Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., completed.
Supplying & Erecting centering for sides & soffits including necessary supports & strutting for plane surface in all cross bracings etc.,
Cement Concrete 1:2:4 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., completed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
PricebidRW.pdf
Tender Documents • 1.29 MB
TechnicalbidRW.pdf
Tender Documents • 0.96 MB
BOQ_788014.xls
BOQ • 0.26 MB