Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 LAccepted-Finance | ₹15.0 L | 1 | Accepted-Finance Lowest |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
26 Apr 2026, 6:00 pmClosed
Executive Officer
Gulabpura
Construction work of hall at Madrasa Ayesha Siddiqa, Hurda Road Gulabpura Bhilwara.
2026_DLB_551446_1
GULABPURA/NIT/12/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
GULABPURA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Executive officer nagar palika gulabpura
₹30,000
Yes
11 May 2026
12 Apr 2026
28 Apr 2026
12 Apr 2026
26 Apr 2026
12 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. | |||||
| 2Providing and laying in position cement concrete including curing compaction etc . Complete in specified grade excluding the cost of centering and shuttering All work up to plinth level. 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | |||||
| 3Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
| 4Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
| 5Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories. :cement mortar 1:4 (1 cement : 4 coarse sand) | |||||
| 6Random rubble dry stone Kharanja (soling) under floor. | |||||
| 7Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) | |||||
| 8Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including priming coat with cement primer. | |||||
| 9.1 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | - | - |
| 9.2 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tendernotice2.pdf
Tender Documents • 0.56 MB
BOQ_982744.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .