Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC AS PER BOQ | |
| 2 | L2₹9.1 L+₹10,554.75 (1.17%)Rejected-AOC | L2 | Rejected-AOC AS PER BOQ |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
7 Apr 2021, 12:00 pmClosed
executive engineer
executive engineer irrigation div gkp
RECONSTRUCTION OF VRB AT KM 0.170 ON DHANAHA MINOR
2021_UPIDC_568209_56
05/EE/2020-21
Open Tender
Civil Works
Item Wise
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹19,000
Yes
30 May 2022
2 Apr 2021
7 Apr 2021
2 Apr 2021
7 Apr 2021
2 Apr 2021
Amount
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road and removing the diversion after work, including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying P.C.C. 1:4:8 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and old brick ballast and usable malba ( Collected from dismantaling of old DRB/VRB) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying P.C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
Bending, binding cutting placing in position rainforcement steel including cost of binding wire and tack wilding with material. and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Laying C.C. work in 1:1:2 (M-25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) Wearing coat 75mm thick top of the slab and parapet. including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work
Cemet Struck Deep Pointing 1:2 CM on Brick Masonary upto 3m height including cost of all material ,labour, t&p etc. required for proper completion of work.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
Dismelting of old V.R.B. and proper disposal including all cost of materials,T&P and labours etc.
Runnig of 5 H.P. genrater set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.
Providing one coat of bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc.
Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
Dry brick on Edge Pitching including prepration of sub-grade to prescrib Slop ,filing joint with earth T&P etc.
Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work
Sign borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of work.
ANIRUDHA PRASAD VERMA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .