Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹13.1 L+₹84,402.42 (6.87%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹13.8 L+₹1.5 L (12.1%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical SMVDU | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.4 L
EMD Value
₹38,800
Closing Date
14 Jul 2026, 6:00 pmClosed
Executive Engineer
PWD (RandB) Division Udhampur
Construction of Drain and protection wall from Ashram road to Mongreli passing through Sadotra Mohalla Atta Chakki at Kambal Danga
2026_PWDJK_315053_5
e-NIT 67 of 2026-27 dated 08.07.2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB Division Udhampur
₹38,800
28 Jul 2026
8 Jul 2026
15 Jul 2026
9 Jul 2026
14 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means over area(exceeding 30cm in depth 1.5tr in width as well as 10sqm on plan) including disposal of excavated earth lead upto 50mtr and lift upto 1.5mtr as directed by Engineer-in-charge. All Kind of Soil | 168.87 | cum | 187.3 | ₹31,629.35 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 9.48 | cum | 4,826.5 | ₹45,755.22 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 20% plum | 61.18 | cum | 4,774.46 | ₹2,92,101.46 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 240.61 | cum | 5,402.9 | ₹12,99,991.77 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming & watering, lead upto 50 m & lift upto 1.5 m. | 35.1 | cum | 218.4 | ₹7,665.84 |
| 6 | Dumping stone including cost of stone in horizontal on level | 49.92 | cum | 937.9 | ₹46,819.97 |
| 7Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 7.1 | Foundations, footings, bases of columns etc. for mass concrete | 56.56 | sqm | 286.35 | ₹16,195.96 |
| 8 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 26.32 | sqm | 416.5 | ₹10,962.28 |
| 9 | Providing and fixing on wall face un-plasticized Rigid PVC rain water
pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes 110 mm diametre | 60 | RMT | 366.3 | ₹21,978 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1020825.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .