Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC Sucessful Bidder | |
| 2 | L2₹6.0 L+₹88,422.50 (17.4%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | JAI DURGA CONSTRUCTION COMPANY L1 | HIMMAT SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. | 1 | Cum | 105 ₹105 Lowest | 105 ₹105 Lowest |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. | 1 | Cum | 115 ₹115 Lowest | 115 ₹115 Lowest |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 199 ₹199 Lowest | 199 ₹199 Lowest |
| 4.00 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. | 1 | Cum | 7,400 ₹7,400 Lowest | 7,900 ₹7,900 |
| 5.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 185 ₹185 Lowest | 185 ₹185 Lowest |
| 6.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 145 ₹145 Lowest | 145 ₹145 Lowest |
| 7.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSR
Item No 10.13 (a) (i) | 1 | Cum | 11,500 ₹11,500 Lowest | 11,500 ₹11,500 Lowest |
| 8.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 6,500 ₹6,500 Lowest | 6,500 ₹6,500 Lowest |
| 9.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 10.00 | Lowering, jointing and cutting of RCC pipes 250 mm dia into trenches & laying same to correct alignment complete | 1 | Metre | 220 ₹220 Lowest | 220 ₹220 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
27 Apr 2026, 10:00 amClosed
Divisional Engineer
Lehal PWRMDC Division Patiala
Relining and Lining of Watercourse by laying UGPL of Outlet RD 60784-L of Boha Disty Village Boha Distt. Mansa
2026_WR_166201_3
11/2026
Open Tender
Civil Works
Item Rate
Boha
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹12,000
Patiala
28 Sept 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. | - | Cum | - | - |
| 2 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. | - | Cum | - | - |
| 3 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | - | - |
| 4 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. | - | Cum | - | - |
| 5 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | - | Sqm | - | - |
| 6 | 10mm thick cement plaster 1:4 on bed and top. | - | Sqm | - | - |
| 7 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSR
Item No 10.13 (a) (i) | - | Cum | - | - |
| 8 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | Cum | - | - |
| 9 | Cement concrete 1:4:8 with brick ballast 40mm gauge | - | Cum | - | - |
| 10 | Lowering, jointing and cutting of RCC pipes 250 mm dia into trenches & laying same to correct alignment complete | - | Metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Pack3.xls
Tender Documents • 0.04 MB
BOQ_337268.xls
BOQ • 0.25 MB
8of11.pdf
PDF • 0.49 MB
7of11.pdf
PDF • 0.66 MB
6of11.pdf
PDF • 0.35 MB
c5of11.pdf
PDF • 0.35 MB
c3of11.pdf
PDF • 0.75 MB
2of11.pdf
PDF • 0.28 MB
c1of11.pdf
PDF • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .