| 1 | L1₹1.1 CrAccepted-AOC PANDAPARA JALPAIGURI | ₹1.1 Cr | L1 | Accepted-AOC LOWEST BID VALUE |
| 2 | L2₹1.1 Cr+₹3.6 L (3.34%)Rejected-Finance DBC ROAD JALPAIGURI 735101 | JALPAIGURI | WEST BENGAL | 735101 | ₹1.1 Cr+₹3.6 L (3.34%) | L2 | Rejected-Finance Bid value higher than L1 |
| 3 | L2₹1.1 Cr+₹3.6 L (3.34%)Rejected-Finance | ₹1.1 Cr+₹3.6 L (3.34%) | L2 | Rejected-Finance Bid value higher than L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Improper trade License |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non submission of authenticated Profit and Loss Account and audit balance sheets by a licensed Chartered Accountant. |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
27 Feb 2026, 5:30 pmClosed
Superintending Engineer attached to CE North East
Club Road Jalpaiguri
Strengthening of Bank protection work along the left Bank of river Teesta for a length of 2000 m at GP Kuchlibari Block Mekliganj DistCoochbehar
2026_IWD_997678_10
WBIW/SE/CE(NE)/NIT-04(e)/25-26
Open Tender
CIVIL WORKS
Percentage
75 days
GP Kuchlibari Block Mekliganj DistCoochbehar
Please refer Tender documents.
7 documents required · 7 mandatory
₹2.2 L
Yes
11 Sept 2026
5 Feb 2026
2 Mar 2026
5 Feb 2026
27 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in the canals /drainage channels /borrow pits /River bed/ slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place with in an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
a)Ordinary soil /local soil/ soil mixed with moorum or kankar /silt, dry or moist / slushy silt / sticky soil. | 2,250 | Cum | 129.91 | ₹2,92,297.5 |
| 2 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical meanson land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Beyond 500 metre and upto 1.00 km | 5,754.25 | Cum | 259.81 | ₹14,95,011.69 |
| 3 | Quarrying carrying, Supplying stone boulders/shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all inciental charges like Royalty and labour charges for laying boulder in apron or within wire netting of saussage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of Engineer-in-charge.(Quarry belongs to Non-Forest Deptt Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
Comprising Boulder above 30Kg each @ 60% , Boulder above 20Kg each @ 30% & Boulder above 10Kg each @ 10%. | 3,049.07 | Cum | 2,223.06 | ₹67,78,267.78 |
| 4 | Labour charges for collecting loose scattered laterite and stone boulders from slope ,bed or apron and stacking the same above ground level withina leadof 100 metre and all liftsasper directionof the Engineer - in-charge. | 62.49 | Cum | 244.32 | ₹15,267.56 |
| 5 | Quarrying carrying, Supplying stone boulders/shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all inciental charges like Royalty and labour charges for boulder pitching on top and slope by pitching required boulders(Boulder above 20Kg each within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and rarring where necessary complete but excluding the cost of singles of filling materials as per direction of the Engineer-in-charge.(Quarry belongs to Non-Forest area Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works. a) Boulder above 20Kg each . | 480.19 | Sqm | 2,505.76 | ₹12,03,235.88 |
| 6 | Quarrying, carrying , supplying shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like Royalty N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 91.25 per Cum (b) For Non-Forest area Royalty : Rs.106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill,otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Shingles | 156.04 | Cum | 1,605.47 | ₹2,50,514.33 |
| 7 | Quarrying, carrying , supplying shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like Royalty N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 91.25 per Cum (b) For Non-Forest area Royalty : Rs.106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill,otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Shingles | 66.87 | Cum | 1,885.55 | ₹1,26,086.73 |
| 8 | Quarrying carrying, Supplying stone boulders/shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading,staking and carriage including all inciental charges like Royalty and Labour charge for dumping / laying of Laterite / Stone Boulders / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.(Quarry belongs to BL & LRO Deptt, Govt. of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . (Boulders above 10 kg each). | 115.71 | Cum | 2,068.37 | ₹2,39,331.09 |
| 9 | Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge. Mesh size 150 mm x 150 mm with 10 SWG wire | 2,073.27 | Sqm | 95.34 | ₹1,97,665.56 |
| 10 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG /8SWG GI wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150mm all around with 12SWG GI wire complete, including the cost of supply of wire netting, fitting etc, complete as per direction of theEngineer-incharge. Mesh size 150 mm x 150 mm with 10 SWG wire | 173.55 | Sqm | 110.84 | ₹19,236.28 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
sl10.pdf
Tender Documents • 0.64 MB
Form2911S10.pdf
Tender Documents • 0.66 MB
BOQ_2446308.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .