Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹87,935.40 (0.74%)Admitted-Finance | ₹1.2 Cr+₹87,935.40 (0.74%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹1.1 L (0.89%)Admitted-Finance | ₹1.2 Cr+₹1.1 L (0.89%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹1.1 L (0.92%)Admitted-Finance | ₹1.2 Cr+₹1.1 L (0.92%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹2.5 L (2.09%)Admitted-Finance | ₹1.2 Cr+₹2.5 L (2.09%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CCC Builders Merchant Private Limited L10 | SINGO ENGINEERING INDIA PRIVATE LIMITED L15 | Aakar Infra Engineers PVT Ltd L13 | SUSANTA KUMAR SWAIN L7 | SURYAA CONSTRUCTION L12 | Gyana Ranjan Mohanty L9 | M/s.BASUDEV CONSTRUCTION L5 | M/S Kailash Chandra Samal L3 | M/s Laxmidhar Mohanty L6 | Ms Gangadhar Jena L11 | SUBRAT KUMAR BEHURA L8 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L1 | M/S CHINMAYA RANJAN PARIDA L14 | M/S BHAIRAB CHARAN SWAIN L2 | Skater Infratech India Pvt. Ltd. L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, tollage etc. complete as directed by the Engineer-In-Charge. | 820 | Each 100 Square Meter | 180 ₹1,476 | 1,255 ₹10,291 | 450 ₹3,690 | 25 ₹205 | 20,000 ₹1,64,000 | 45 ₹369 | 72 ₹590.4 | 500 ₹4,100 | 100 ₹820 | 1 ₹8.2 Lowest | 1.5 ₹12.3 | 100 ₹820 | 57 ₹467.4 | 5 ₹41 | 90 ₹738 |
| 2.00 | Scarifying bituminous road upto 50mm. thick by mechanical means, stacking serviceable and unserviceable materials separately and disposal of dismantled unserviceable materials up to a lead of 5000 metres or at identified location including all labour, machineries, materials, T&P, taxes excluding GST, fuel, hire and running charges of all machineries etc. all complete as directed by Engineer-In-charge. (N.B : Barricading the site if required) | 6,265 | Each Square Meter | 18 ₹1,12,770 | 4.75 ₹29,758.75 | 18 ₹1,12,770 | 17 ₹1,06,505 | 50 ₹3,13,250 | 3 ₹18,795 Lowest | 15 ₹93,975 | 10 ₹62,650 | 30 ₹1,87,950 | 3 ₹18,795 Lowest | 3 ₹18,795 Lowest | 30 ₹1,87,950 | 3 ₹18,795 Lowest | 50 ₹3,13,250 | 120 ₹7,51,800 |
| 3.00 | Dismantling of existing structures like pathway, culverts, bridges, retaining walls and other structures made of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 5000 metres by any means including all labour, fuel and other equipments, taxes excluding GST, tollage and complete as directed by Engineer-In-Charge. N.B.: Steel scraps, pipes etc. if any found during dismantling need to be returned to PPT Central store. | 61.5 | Each Cubic Meter | 2,700 ₹1,66,050 | 1,000 ₹61,500 | 650 ₹39,975 | 525 ₹32,287.5 | 2,500 ₹1,53,750 | 220 ₹13,530 | 387 ₹23,800.5 | 350 ₹21,525 | 1,000 ₹61,500 | 550 ₹33,825 | 500 ₹30,750 | 600 ₹36,900 | 279 ₹17,158.5 | 500 ₹30,750 | 20 ₹1,230 Lowest |
| 4.00 | Earth work excavation in all kinds of soil from the existing ground level etc. with all leads and lifts disposing and spreading the excavated material within a lead of 5 km. at identified locations as directed with supply of all labour, materials, T&P, hire & running charges of all machineries, tollage, taxes excluding GST etc. all complete as per direction of Engineer in charge. (N.B. : Barricading the site if required) | 82 | Each Cubic Meter | 180 ₹14,760 | 252.3 ₹20,688.6 | 120 ₹9,840 | 129 ₹10,578 | 400 ₹32,800 | 50 ₹4,100 Lowest | 54 ₹4,428 | 80 ₹6,560 | 60 ₹4,920 | 80 ₹6,560 | 80 ₹6,560 | 90 ₹7,380 | 81 ₹6,642 | 60 ₹4,920 | 80 ₹6,560 |
| 5.00 | Collecting & supplying of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the prepared subgrade surface, compacting with VRR and Earth vibrator for both Dry & Wet rolling all complete including cost of all materials, labour, T&P, royalties, hire & running charges of all equipments, operator expenses, cost of water, tollage, fuel, lubricants, taxes excluding GST etc all complete as directed by the Engineer in charge. (N.B. : Barricading the site if required) | 82 | Each Cubic Meter | 810 ₹66,420 | 1,000 ₹82,000 | 1,750 ₹1,43,500 | 719 ₹58,958 | 2,500 ₹2,05,000 | 700 ₹57,400 | 531 ₹43,542 Lowest | 600 ₹49,200 | 750 ₹61,500 | 850 ₹69,700 | 800 ₹65,600 | 800 ₹65,600 | 887 ₹72,734 | 700 ₹57,400 | 840 ₹68,880 |
| 6.00 | Collecting, conveying & supplying IRC Grade-III metal of size 22.4mm to 53mm of approved quality, laying over the compacted excavated portion of existing road pavement to the required slope and level& filling the interstices with required granite stone quarry dust as per MORTH specification, compacting by smooth wheeled VRR of minimum 8 to 10 Ton Static Weight including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, all kind of testing charges, water sprinkling, royalties, tollage, taxes excluding GST etc. all complete as directed by the Engineer-in-charge. (N.B. : Barricading the site if required) | 145.5 | Each Cubic Meter | 2,070 ₹3,01,185 | 1,000 ₹1,45,500 Lowest | 1,850 ₹2,69,175 | 1,298 ₹1,88,859 | 3,000 ₹4,36,500 | 1,700 ₹2,47,350 | 1,701 ₹2,47,495.5 | 1,850 ₹2,69,175 | 1,800 ₹2,61,900 | 1,900 ₹2,76,450 | 1,800 ₹2,61,900 | 1,200 ₹1,74,600 | 1,800 ₹2,61,900 | 1,700 ₹2,47,350 | 1,930 ₹2,80,815 |
| 7.00 | Supplying, mixing, transporting, laying in proper level & grade of cement concrete 1:3:6 (1 cement: 3 Coarse aggregate : 6 hard granite graded chips of 20mm & below size Crusher Broken) for Dry Lean Cement Concrete, hoisting, mixing in Batching Plant, laying over compacted surface, compacting with smooth wheeled vibratory road roller of minimum 8 to 10 Ton capacity, finished smooth to the exposed surface, including form works made of ply/steel shutters, curing etc with supply of all materials, labour, T&P, engagement, hire & running charges of all machineries, all kinds of testing charges, transportation charges, water charges, taxes excluding GST etc. all complete as directed by the Engineer-in-charge. (N.B- Barricading the site if required) | 626.5 | Each Cubic Meter | 3,600 ₹22,55,400 | 6,259.1 ₹39,21,326.15 | 5,100 ₹31,95,150 | 3,600 ₹22,55,400 | 5,000 ₹31,32,500 | 3,500 ₹21,92,750 | 2,931 ₹18,36,271.5 | 3,100 ₹19,42,150 | 4,200 ₹26,31,300 | 3,400 ₹21,30,100 | 3,500 ₹21,92,750 | 3,000 ₹18,79,500 | 4,013 ₹25,14,144.5 | 3,100 ₹19,42,150 | 1,850 ₹11,59,025 Lowest |
| 8.00 | Providing and laying at or near work site precast kerb stone of (1:2:4) grade cement concrete in position to the required line, level and curvature, placing in position jointed with cement mortar 1:3, (1 cement:3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curves shall not to more than 5 mm), including making drainage opening wherever required including all labour and materials, curing , centering and shuttering, fuel, tools and other equipments, gate entry fees, cost of water, taxes but excluding GST, tollage and all complete as direcred by Engineer in Charge. (length of finished kerb edging shall be measured for payment). N.B.: Excuding reinforcement but including centering and shuttering. | 73.8 | Each Cubic Meter | 8,100 ₹5,97,780 | 8,376.15 ₹6,18,159.87 | 5,800 ₹4,28,040 | 4,480 ₹3,30,624 | 6,500 ₹4,79,700 | 2,800 ₹2,06,640 Lowest | 4,931 ₹3,63,907.8 | 4,500 ₹3,32,100 | 4,000 ₹2,95,200 | 4,000 ₹2,95,200 | 5,500 ₹4,05,900 | 5,422 ₹4,00,143.6 | 3,577 ₹2,63,982.6 | 4,200 ₹3,09,960 | 3,000 ₹2,21,400 |
| 9.00 | Cement concrete of M-35 grade as per approved Design Mix for RCC road work, mixing in a Batching plant, transporting the concrete by tranist mixture truck, hoisting, laying on prepares surface for pavement slabs in panels of required size, compacting by mechanical vibrator with 60mm needle and plate vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, all testing charges of construction materials, compressive strength test of concrete cubes, core cutting, cost for design mix, cost of water, engagement, hire & running charges of all machineries, taxes excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc all complete as directed by Engineer in Charge. (N.B. : (1) Two separate Mix Design shall be conducted with different Cement brand for RCC work by using 12mm. to 20mm. size cursher broken chips, (2) Calibaration Certificate of Bathcing Plant is mandatory, (3) Ducket of every batch must be furnished to the Division for record purpose & (4) 25% fo concrete quantity will be held up from each bill and will be released after acceptance of testing cetificate ) | 1,566.25 | Each Cubic Meter | 5,400 ₹84,57,750 | 7,000 ₹1,09,63,750 | 6,666 ₹1,04,40,622.5 | 5,300 ₹83,01,125 | 5,500 ₹86,14,375 | 5,300 ₹83,01,125 | 4,831 ₹75,66,553.75 | 5,100 ₹79,87,875 | 4,800 ₹75,18,000 | 5,800 ₹90,84,250 | 5,000 ₹78,31,250 | 4,100 ₹64,21,625 Lowest | 6,900 ₹1,08,07,125 | 4,856 ₹76,05,710 | 5,330 ₹83,48,112.5 |
| 10.00 | Supplying and laying 125 Micron polythene separation membrane with overlapping of 300 mm at joints including cleaning the surface before placing the membrane including cost of all materials, labour, T&P, tollage, taxes excluding GSTetc, all complete as directed by the Engineer In Chrage. (N.B. : No payment will be made for overlapping.) | 6,265 | Each Square Meter | 9 ₹56,385 Lowest | 35.6 ₹2,23,034 | 40 ₹2,50,600 | 45 ₹2,81,925 | 20 ₹1,25,300 | 20 ₹1,25,300 | 42 ₹2,63,130 | 12 ₹75,180 | 15 ₹93,975 | 40 ₹2,50,600 | 12 ₹75,180 | 10 ₹62,650 | 19 ₹1,19,035 | 20 ₹1,25,300 | 10 ₹62,650 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
9 Nov 2020, 5:00 pmClosed
N Patro ,EE, HWD-II,PPT
Office of the Harbour Works Division No.II, Engineering Department, Paradip Port Trust, First Floor, Administrative Building, Tele -06722-223001 Mob-9556898061
Strengthening of the road by concreting leading from L and T junction to CISF junction point of Sector-21 (Fishery Harbour Road).
2020_MoS_592301_1
CE/HW-II-W-08/20/369
Open Tender
Civil Works
Works
180 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD.
₹2.5 L
Yes
18 Jan 2021
21 Oct 2020
11 Nov 2020
21 Oct 2020
9 Nov 2020
21 Oct 2020
Amount
Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, tollage etc. complete as directed by the Engineer-In-Charge.
Scarifying bituminous road upto 50mm. thick by mechanical means, stacking serviceable and unserviceable materials separately and disposal of dismantled unserviceable materials up to a lead of 5000 metres or at identified location including all labour, machineries, materials, T&P, taxes excluding GST, fuel, hire and running charges of all machineries etc. all complete as directed by Engineer-In-charge. (N.B : Barricading the site if required)
Dismantling of existing structures like pathway, culverts, bridges, retaining walls and other structures made of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 5000 metres by any means including all labour, fuel and other equipments, taxes excluding GST, tollage and complete as directed by Engineer-In-Charge. N.B.: Steel scraps, pipes etc. if any found during dismantling need to be returned to PPT Central store.
Earth work excavation in all kinds of soil from the existing ground level etc. with all leads and lifts disposing and spreading the excavated material within a lead of 5 km. at identified locations as directed with supply of all labour, materials, T&P, hire & running charges of all machineries, tollage, taxes excluding GST etc. all complete as per direction of Engineer in charge. (N.B. : Barricading the site if required)
Collecting & supplying of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the prepared subgrade surface, compacting with VRR and Earth vibrator for both Dry & Wet rolling all complete including cost of all materials, labour, T&P, royalties, hire & running charges of all equipments, operator expenses, cost of water, tollage, fuel, lubricants, taxes excluding GST etc all complete as directed by the Engineer in charge. (N.B. : Barricading the site if required)
Collecting, conveying & supplying IRC Grade-III metal of size 22.4mm to 53mm of approved quality, laying over the compacted excavated portion of existing road pavement to the required slope and level& filling the interstices with required granite stone quarry dust as per MORTH specification, compacting by smooth wheeled VRR of minimum 8 to 10 Ton Static Weight including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, all kind of testing charges, water sprinkling, royalties, tollage, taxes excluding GST etc. all complete as directed by the Engineer-in-charge. (N.B. : Barricading the site if required)
Supplying, mixing, transporting, laying in proper level & grade of cement concrete 1:3:6 (1 cement: 3 Coarse aggregate : 6 hard granite graded chips of 20mm & below size Crusher Broken) for Dry Lean Cement Concrete, hoisting, mixing in Batching Plant, laying over compacted surface, compacting with smooth wheeled vibratory road roller of minimum 8 to 10 Ton capacity, finished smooth to the exposed surface, including form works made of ply/steel shutters, curing etc with supply of all materials, labour, T&P, engagement, hire & running charges of all machineries, all kinds of testing charges, transportation charges, water charges, taxes excluding GST etc. all complete as directed by the Engineer-in-charge. (N.B- Barricading the site if required)
Providing and laying at or near work site precast kerb stone of (1:2:4) grade cement concrete in position to the required line, level and curvature, placing in position jointed with cement mortar 1:3, (1 cement:3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curves shall not to more than 5 mm), including making drainage opening wherever required including all labour and materials, curing , centering and shuttering, fuel, tools and other equipments, gate entry fees, cost of water, taxes but excluding GST, tollage and all complete as direcred by Engineer in Charge. (length of finished kerb edging shall be measured for payment). N.B.: Excuding reinforcement but including centering and shuttering.
Cement concrete of M-35 grade as per approved Design Mix for RCC road work, mixing in a Batching plant, transporting the concrete by tranist mixture truck, hoisting, laying on prepares surface for pavement slabs in panels of required size, compacting by mechanical vibrator with 60mm needle and plate vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, all testing charges of construction materials, compressive strength test of concrete cubes, core cutting, cost for design mix, cost of water, engagement, hire & running charges of all machineries, taxes excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc all complete as directed by Engineer in Charge. (N.B. : (1) Two separate Mix Design shall be conducted with different Cement brand for RCC work by using 12mm. to 20mm. size cursher broken chips, (2) Calibaration Certificate of Bathcing Plant is mandatory, (3) Ducket of every batch must be furnished to the Division for record purpose & (4) 25% fo concrete quantity will be held up from each bill and will be released after acceptance of testing cetificate )
Supplying and laying 125 Micron polythene separation membrane with overlapping of 300 mm at joints including cleaning the surface before placing the membrane including cost of all materials, labour, T&P, tollage, taxes excluding GSTetc, all complete as directed by the Engineer In Chrage. (N.B. : No payment will be made for overlapping.)
Supply of Fe-500 steel of SAIL/ VIZAG/ TISCON steel brands conforming to IS-1786 specifications including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge with supply of all materials, testing charges, labour, transportation, T&P, taxes excluding GST, tollage, etc. all complete as directed by the Engineer-in-charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.
Supplying & forming by cutting grooves of size 12mm wide x 85mm deep longitudional joints by fixing 10 mm dia 450mm long HYSD bars @ 420mm C/C painted with anti-corrosive paint including providing & fixing salitex board, painting one side of concrete surface with bituminous black paint, sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials, reinforcement, T&P, labour, Hire and running charges of all machineries, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
Supplying & forming by cutting grooves of size 12mm wide x 60mm deep contraction joints by fixing 25 mm dia 450mm long mild steel round dowel bars @ 300mm C/C including painting two third of the bars with anticorrosive paint & covering the same with 125 micron polythene fitted and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials including dowel bars, T&P, labour, Hire and running charges, of all machineries, taxes excluding GST etc. all complete as directed by Engineer-In-Charge.
Forming 25mm wide x 250mm deep expansion joints by fixing 25 mm dia 450mm long mild steel dowel bars @ 300mm C/C including painting 275mm length of bars with anti-corrosive paint & covering the same with 125 micron polythene fitted and HDFC/G.I. cap of 100 mm long at the other end including fixing 25mm thick & 220 mm deep joint filler Board (Shalitax or equivalent) painting one side of concrete surface with bituminous black paint & sealing the groove with bitumastic filler etc, all complete with cost & supply of all materials including reinforcement, T&P, labour, Hire and running charges, of all machineries, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
Providing rigid, smooth, leak proof, good quality centering & shuttering for form works made out of new ply/ steel shutters for raft, pavement slab, retaining wall, or any other structure as per required, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period over including staging/ scaffolding with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, taxes excluding GST etc. all complete as directed by the Engineer-in-charge etc.
Painting the kerb stone with two coats of weather coat over a coat of primer of approved brand and manufacture of required colour to give an even shade including all labour, fuel, tools, and other equipment, taxes excluding GST, etc. all complete as directed by Engineer-In-Charge.
Marking center line, stop line etc on road as per IRC patern with thermo plastic paint of approved quality and make with 8% glassbeads laid on the road surface at temperature 160 degree cent. Etc wih supply of all labour and materils, all machineries, T&P, taxes but GST, transportaion , royalities, etc. all complete as directed by Engineer-In-Charge.
M/S BHAIRAB CHARAN SWAIN
M/S Kailash Chandra Samal
Skater Infratech India Pvt. Ltd.
M/s.BASUDEV CONSTRUCTION
M/s Laxmidhar Mohanty
SUSANTA KUMAR SWAIN
SUBRAT KUMAR BEHURA
Gyana Ranjan Mohanty
CCC Builders Merchant Private Limited
Ms Gangadhar Jena
SURYAA CONSTRUCTION
Aakar Infra Engineers PVT Ltd
M/S CHINMAYA RANJAN PARIDA
SINGO ENGINEERING INDIA PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_622153.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .