Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC EKLEHARA COLONY PO EKLEHARA DISTT CHHINDWARA M P | ₹18.2 L | L1 | Accepted-AOC Bidder is L1 and has quoted lowest item rates overall |
| 2 | L2₹21.0 LRejected-Finance | ₹21.0 L | L2 | Rejected-Finance Quoted higher rate |
| 3 | L3₹22.6 LRejected-Finance | ₹22.6 L | L3 | Rejected-Finance Quoted higher rate |
Tender Value
₹30.6 L
EMD Value
₹38,300
Closing Date
8 May 2026, 6:00 pmClosed
Staff Officer (Civil), Pench Area
Staff Officer (Civil), AGM Office, Pench Area, P.O. Parasia, Dist. Chhindwara (M.P.) 480441
Balance work at STI Building for renovation which includes tiling work, false celling work and ACP Main Entrance to PRC/STI under GM Unit of Pench Area.
2026_WCL_358837_1
pe3350-civ-s-e005-2026-27
Open Tender
Civil Works - Buildings
60 days
STI / PRC CHHINDWARA
As Per NIT
3 documents required · 3 mandatory
₹38,300
27 May 2026
27 Apr 2026
9 May 2026
27 Apr 2026
8 May 2026
28 Apr 2026
27 Apr 2026 - 1 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil. | 15 | Cum | 188.5 | ₹2,827.5 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand(zone III) : 6 graded stone aggregate 40 mm nominal size) | 5 | Cum | 5,430.4 | ₹27,152 |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.15 | cum | 8,200.9 | ₹34,033.74 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | 249 | kg | 91.7 | ₹22,833.3 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
. | 20 | Sqm | 260.1 | ₹5,202 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) / Cement/Fly Ash bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 7 | Cum | 5,489.2 | ₹38,424.4 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks/cement/Fly Ash of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 49.38 | cum | 6,625.35 | ₹3,27,126.66 |
| 8 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 400 | sqm | 223.25 | ₹89,300 |
| 9 | 6 mm cement plaster of mix 1:3 (1 cement : 3 fine sand) | 465 | sqm | 197.2 | ₹91,698 |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 465 | sqm | 124.3 | ₹57,799.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_371703.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid