Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance | ₹6.5 L | L1 | Admitted-Finance |
| 2 | L2₹7.2 LAdmitted-Finance | ₹7.2 L | L2 | Admitted-Finance |
| 3 | L3₹9.1 LAdmitted-Finance | ₹9.1 L | L3 | Admitted-Finance |
| 4 | L4₹9.3 LAdmitted-Finance | ₹9.3 L | L4 | Admitted-Finance |
| 5 | L5₹10.3 LAdmitted-Finance 202 1ST FLOOR VIVEKANAND PURI MALKAGANJ SARAI ROHILLA NORTH DELHI DELHI 110007 UDYAM DL 01 0065084 | NORTH DELHI | DELHI | 110007 | ₹10.3 L | L5 | Admitted-Finance |
| Rank | Bidder | Total Amount |
|---|---|---|
| L6 | HYDROCON ENGINEERS Bid ID 1690772 | ₹11,74,100 |
| L1 | Raj Engineering Co. Bid ID 1691670 | ₹6,51,950 |
| L3 | CHANDERA BUILDERS Bid ID 1691720 | ₹9,14,500 |
| L4 | paramount systems Bid ID 1691847 | ₹9,26,300 |
| L5 | MITTAL TRADING COMPANY Bid ID 1691515 | ₹10,26,600 |
| L2 | ANKIT SINGH TARAR Bid ID 1691398 | ₹7,16,260 |
| Sl No | Description | Qty | Unit | HYDROCON ENGINEERS L6 | Raj Engineering Co. L1 | CHANDERA BUILDERS L3 | paramount systems L4 | MITTAL TRADING COMPANY L5 | ANKIT SINGH TARAR L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply of horizontal split casing centrifugal pump suitable to handle potable water Having flanged suction & delivery with CI impeller, CI body, S.S. Shaft & S.S. Sleeve suitable for head 40-45mtr., Discharge 522-400 m3 /hr., 1470 RPM Suitable for prime mover (motor) of capacity 100 HP. Make of Pump: - Wilo Matter & Platt/KBL /Lubi/Jyoti/ Any DJB approved make. | 2 | Nos. | 8,16,000 ₹9,62,880 | 3,92,000 ₹4,62,560 | 3,50,000 ₹4,13,000 | 7,00,000 ₹8,26,000 | 4,50,000 ₹5,31,000 | 5,10,000 ₹6,01,800 |
| 2.00 | Dismantling of old pump set after disconnecting from suction and delivery pipeline, decoupling with motor, removing of electric connections from motor i/c taking out old pump from existing system etc., closing of suction & delivery line with the help of suitable size dead flange. | 2 | Job | 30,000 ₹35,400 | 15,000 ₹17,700 | 24,000 ₹28,320 | 20,000 ₹23,600 | 50,000 ₹59,000 | 10,000 ₹11,800 |
| 3.00 | Dismantling and taking out M S Base frame from CC foundation after cutting of nut bolts, Breaking the Damaged RCC foundation of the old pump set by the help of concrete breaker and labour. Also taking out Malba from the pump house by manual labour & dumping the same as per directions. | 2 | Job | 20,000 ₹23,600 | 13,000 ₹15,340 | 24,000 ₹28,320 | 10,000 ₹11,800 | 40,000 ₹47,200 | 10,000 ₹11,800 |
| 4.00 | Providing & making of Safety arrangement like safety Helmet, Gum Boots, Hand Gloves, Safety Belts, Safety shoes, First Aid Box, Caution Tape, Barrier Cone, Torch, etc arranged by the firm at site of work for safe working as per site requirement | 1 | Job | 5,000 ₹5,900 | 4,500 ₹5,310 | 11,000 ₹12,980 | 5,000 ₹5,900 | 10,000 ₹11,800 | 10,000 ₹11,800 |
| 5.00 | Making a RCC foundation of new Pump Set of material Ratio 1:1.5:3 (cement, coarse sand and graded stone aggregates) concrete with foundation/rag bolts as per site requirement. Providing & fixing of M.S base frame of suitable size with nut bolt & washer etc for pump sets as per site requirement. | 2 | Job | 40,000 ₹47,200 | 62,000 ₹73,160 | 82,000 ₹96,760 | 10,000 ₹11,800 | 1,60,000 ₹1,88,800 | 40,000 ₹47,200 |
| 6.00 | Providing & fixing of Suitable size coupling for pump set with Suitable size coupling guard & fixing with nut bolt & washer etc as per site requirement. | 2 | Job | 10,000 ₹11,800 | 27,000 ₹31,860 | 8,000 ₹9,440 | 10,000 ₹11,800 | 40,000 ₹47,200 | 6,000 ₹7,080 |
| 7.00 | Fixing of new pump set in the system by bolting in MS base frame in RCC foundation, coupling with Existing motor including minor civil work required for leveling of pump-motor with suction and delivery line. Installation/fixing of sluice Valves, NRVs, etc and making All electrical connections of motor with suitable size lugs, nut bolt & washer etc as per site requirement | 2 | Job | 50,000 ₹59,000 | 19,000 ₹22,420 | 90,000 ₹1,06,200 | 10,000 ₹11,800 | 50,000 ₹59,000 | 7,000 ₹8,260 |
| 8.00 | Providing and fixing of suitable size MS Gap piece, flange, Suitable size reducer, nut bolts, rubber packing etc and Making suction & delivery connections with pump set with the help of suitable size MS Gap piece, flange, Suitable size reducer, nut bolts, rubber packing etc as per site Requirement by using Gas cutter, welding set, manual labour etc. | 2 | Job | 20,000 ₹23,600 | 11,000 ₹12,980 | 36,000 ₹42,480 | 10,000 ₹11,800 | 50,000 ₹59,000 | 7,000 ₹8,260 |
| 9.00 | Testing the complete system on no load and on full load as per the complete satisfaction of the Engineer –in-charge. | 2 | Job | 4,000 ₹4,720 | 9,000 ₹10,620 | 1,50,000 ₹1,77,000 | 10,000 ₹11,800 | 20,000 ₹23,600 | 7,000 ₹8,260 |
Tender Value
Refer Docs
EMD Value
₹25,100
Closing Date
26 Mar 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (EM) M-11
GREATER KAILASH, PART-I, NEW DELHI
Replacement of very old and damaged Pump set No.2 and 3 installed at J-Pocket water gallery Sarita Vihar under Okhla Constituency AC-54.
2026_DJB_288953_11
NIT No. 31/EE(EM)M-11/(25-26)
Open Tender
Electrical Work/ Equipment
60 days
EXECUTIVE ENGINEER (E/M) M-11
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹25,100
Yes
17 Apr 2026
20 Mar 2026
26 Mar 2026
20 Mar 2026
26 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of horizontal split casing centrifugal pump suitable to handle potable water Having flanged suction & delivery with CI impeller, CI body, S.S. Shaft & S.S. Sleeve suitable for head 40-45mtr., Discharge 522-400 m3 /hr., 1470 RPM Suitable for prime mover (motor) of capacity 100 HP. Make of Pump: - Wilo Matter & Platt/KBL /Lubi/Jyoti/ Any DJB approved make. | |||||
| 2Dismantling of old pump set after disconnecting from suction and delivery pipeline, decoupling with motor, removing of electric connections from motor i/c taking out old pump from existing system etc., closing of suction & delivery line with the help of suitable size dead flange. | |||||
| 3Dismantling and taking out M S Base frame from CC foundation after cutting of nut bolts, Breaking the Damaged RCC foundation of the old pump set by the help of concrete breaker and labour. Also taking out Malba from the pump house by manual labour & dumping the same as per directions. | |||||
| 4Providing & making of Safety arrangement like safety Helmet, Gum Boots, Hand Gloves, Safety Belts, Safety shoes, First Aid Box, Caution Tape, Barrier Cone, Torch, etc arranged by the firm at site of work for safe working as per site requirement | |||||
| 5Making a RCC foundation of new Pump Set of material Ratio 1:1.5:3 (cement, coarse sand and graded stone aggregates) concrete with foundation/rag bolts as per site requirement. Providing & fixing of M.S base frame of suitable size with nut bolt & washer etc for pump sets as per site requirement. | |||||
| 6Providing & fixing of Suitable size coupling for pump set with Suitable size coupling guard & fixing with nut bolt & washer etc as per site requirement. | |||||
| 7Fixing of new pump set in the system by bolting in MS base frame in RCC foundation, coupling with Existing motor including minor civil work required for leveling of pump-motor with suction and delivery line. Installation/fixing of sluice Valves, NRVs, etc and making All electrical connections of motor with suitable size lugs, nut bolt & washer etc as per site requirement | |||||
| 8Providing and fixing of suitable size MS Gap piece, flange, Suitable size reducer, nut bolts, rubber packing etc and Making suction & delivery connections with pump set with the help of suitable size MS Gap piece, flange, Suitable size reducer, nut bolts, rubber packing etc as per site Requirement by using Gas cutter, welding set, manual labour etc. | |||||
| 9Testing the complete system on no load and on full load as per the complete satisfaction of the Engineer –in-charge. | |||||
stage.html
html • 0.03 MB
techsummary_383484.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_383484.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid