Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹10.1 L+₹11,838.19 (1.19%)Rejected-Finance | ₹10.1 L+₹11,838.19 (1.19%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.9 L+₹90,420.23 (9.09%)Rejected-Finance | ₹10.9 L+₹90,420.23 (9.09%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.1 L+₹1.2 L (11.9%)Rejected-Finance | ₹11.1 L+₹1.2 L (11.9%) | L4 | Rejected-Finance L4 |
| 5 | L5₹11.2 L+₹1.2 L (12.4%)Rejected-Finance 16 5 KUMARASAMY STREET KALAIMAGAL SCHOOL ROAD ERODE | ₹11.2 L+₹1.2 L (12.4%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | KARVEMBU AND COMPANY L6 | P.Ragupathy & Co L7 | vivek vijay and company L5 | AMARAPATHI CONSTRUCTIONS L3 | T P R CONSTRUCTION L8 | SRI PARIYUR AMMAN CONSTRUCTION AND HOLLOW BRICKS L4 | KAVYA DARSHANA CONSTRUCTIONS L1 | SRD CONTRACTORS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work : CONSTRUCTION OF 10,000 LITRES CAPACITY SERVICE RESERVOIR - 7.50 m STAGING HEIGHT and EPL At MAJESTIC CITY H/O SULLIPALAYAM PANCHAYAT IN Perundurai UNION | |||||||||||
| 2.00Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification . | |||||||||||
| 3.00 | In hard stiff clay, stiff black cotton soil, hard red earth, sales, soil S.S. 20B | 12.96 | Cum | 237 ₹3,071.52 | 250 ₹3,240 | 270 ₹3,499.2 | 231.6 ₹3,001.54 | 263.78 ₹3,418.59 | 235 ₹3,045.6 | 220 ₹2,851.2 | 214.9 ₹2,785.1 Lowest |
| 4.00 | In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting | 14.26 | Cum | 354 ₹5,048.04 | 370 ₹5,276.2 | 500 ₹7,130 | 344.95 ₹4,918.99 | 276.2 ₹3,938.61 Lowest | 350 ₹4,991 | 350 ₹4,991 | 320.2 ₹4,566.05 |
| 5.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | 1.94 | Cum | 4,965 ₹9,632.1 | 330 ₹640.2 Lowest | 5,500 ₹10,670 | 4,805.85 ₹9,323.35 | 5,754.98 ₹11,164.66 | 5,000 ₹9,700 | 5,200 ₹10,088 | 4,461 ₹8,654.34 |
| 6.00RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc. | |||||||||||
| 7.00 | Column footing below 1.50 m from GL | 2.35 | Cum | 8,224 ₹19,326.4 | 8,650 ₹20,327.5 | 7,500 ₹17,625 Lowest | 8,082.18 ₹18,993.12 | 9,645.4 ₹22,666.69 | 8,300 ₹19,505 | 9,000 ₹21,150 | 7,502.2 ₹17,630.17 |
| 8.00 | 0 to 1.50 m below GL | 1.12 | Cum | 8,099 ₹9,070.88 | 8,550 ₹9,576 | 8,000 ₹8,960 | 7,979.66 ₹8,937.22 | 9,506.63 ₹10,647.43 | 8,100 ₹9,072 | 8,500 ₹9,520 | 7,389.1 ₹8,275.79 Lowest |
| 9.00 | 0 to 4.50 m from GL | 2.2 | Cum | 8,224 ₹18,092.8 | 8,700 ₹19,140 | 8,000 ₹17,600 | 8,084.21 ₹17,785.26 | 9,647.7 ₹21,224.94 | 8,200 ₹18,040 | 8,500 ₹18,700 | 7,504.1 ₹16,509.02 Lowest |
| 10.00 | 4.50 m to 7.00 m. from GL | 2.32 | Cum | 8,476 ₹19,664.32 | 9,000 ₹20,880 | 8,500 ₹19,720 | 8,328.2 ₹19,321.42 | 9,925.59 ₹23,027.37 | 8,500 ₹19,720 | 8,900 ₹20,648 | 7,730.6 ₹17,934.99 Lowest |
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
18 Jun 2026, 3:00 pmClosed
BDO VP
BDO VP
CONSTRUCTION OF 10000 LITRES CAPACITY SERVICE RESERVOIR 7 50 m STAGING HEIGHT and EPL At MAJESTIC CITY H/O SULLIPALAYAM PANCHAYAT IN PERUNDURAI UNION of Erode District under ATHIKADAVU AVINASHI THITTAM CESR FUND 2025 26
2026_RDTN_680228_1
105/2024/B3
Open Tender
Civil Works
Item Rate
180 days
Perundurai Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,500
22 Jul 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work : CONSTRUCTION OF 10,000 LITRES CAPACITY SERVICE RESERVOIR - 7.50 m STAGING HEIGHT and EPL At MAJESTIC CITY H/O SULLIPALAYAM PANCHAYAT IN Perundurai UNION | - | - | - | - |
| 2 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification . | - | - | - | - |
| 3 | In hard stiff clay, stiff black cotton soil, hard red earth, sales, soil S.S. 20B | 12.96 | Cum | - | - |
| 4 | In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting | 14.26 | Cum | - | - |
| 5 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | - | Cum | - | - |
| 6 | RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc. | - | - | - | - |
| 7 | Column footing below 1.50 m from GL | 2.35 | Cum | - | - |
| 8 | 0 to 1.50 m below GL | - | Cum | - | - |
| 9 | 0 to 4.50 m from GL | - | Cum | - | - |
| 10 | 4.50 m to 7.00 m. from GL | 1 | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_817420.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_817420.xls
BOQ • 0.30 MB
Techbid.pdf
Tender Documents • 1.89 MB
Techbid.pdf
PDF • 1.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .