Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.4 LAccepted-AOC 97D USHA SIDDHI KUNJ OPP HOLY CROSS SCHOOL BURDWAN COMPOUND LALPUR RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹23.2 L+₹6.8 L (41.1%)Rejected-AOC | 2 | Rejected-AOC NOT L1 | |
| 3 | 3₹24.3 L+₹7.9 L (48.0%)Rejected-AOC SHAKTINAGAR SHAKTINAGAR SHAKTINAGAR SONBHADRA UTTAR PRADESH 231222 | SONBHADRA | UTTAR PRADESH | 231222 | 3 | Rejected-AOC NOT L1 | |
| 4 | 4₹26.5 L+₹10.0 L (61.1%)Rejected-AOC B 1 1ST FLOOR AL SHAMS RESIDENCY KANKE ROAD NEAR CHANDANI CHOWK BHITHA RANCHI JHARKHAND 834008 | RANCHI | JHARKHAND | 834008 | 4 | Rejected-AOC NOT L1 | |
| 5 | 5₹29.0 L+₹12.5 L (76.3%)Rejected-AOC NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | 5 | Rejected-AOC NOT L1 |
Tender Value
Refer Docs
EMD Value
₹29,500
Closing Date
8 May 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
OMC-II, DTPS, ANPARA
OVERHAULING OF BOTH APH OF UNIT 7, DTPS, ANPARA
2024_RVUNL_921581_1
W-ANP/D/OMC2/BMD1/6000005179
Open Tender
Power/Energy Projects/Products
Fixed-rate
30 days
Anpara Thermal Power Station
VALIDITY AGREEMENT, TENDER COST AND EARNEST MONEY
2 documents required · 2 mandatory
₹1,180
Dy CAO CFA and BO, DTPS, Anpara
₹29,500
14 Jul 2025
6 Apr 2024
9 May 2024
6 Apr 2024
8 May 2024
6 Apr 2024
Amount
Opening of all the access doors of APH HE & CE for inspection & execution of the work & closing them after completion of work by applying hold it & replacing old asbestos rope with new one.
Servicing of lub oil system of Guide /Support Bearing of APH. One job includes one lub oil system of Guide / Support bearing of APH.
Revisioning / replacement & resetting of HE /CE inboard, interm & outboard radial seals of APH, bypass seals, axial seals, rotor post seals, circumferential seals of APH.
Repairing / replacement of seal ring segment and static seal plate of HE/CE of APH.
Overhauling of air motor of APH
Servicing / repairing of single nozzle cleaning device & checking of its travel of APH
Cleaning of APH heating element in situ cond. with the help of water / air jet along with expansion joints.
Replacement / repairing of eroded / damaged bracing pipes of APH.
Repairing of expansion joints / strengthen of old welding of duct from flue gas /air inlet damper to Flue gas /air outlet dampers of APH.
Revisioning /repairing of air seal housing of APH Hot end/ Cold end.
Repairing of manholes of APH
Checking of fire fighting /water washing pipe & replacement /blanking of eroded nozzles. It also includes the removal of chocking of the pipe & patching over eroded portion.
Removal of scrap material from ash hopper of APH
Fabrication & erection of platforms /structures for facilitating the various works of Air pre-heaters.
Straightening & repairing of bent diaphragm of APH
Replacement/Repairing of eroded 'T' Bar of APH.
Servicing of gate valves and non-return valves of water washing line of Air pre-heaters.
Repairing of Basket removal door and replacement of asbestos rope doors of APH.
Repairing of eroded casing of APHs.
Replacement of cold end baskets.
Cleaning of removed cold end basket with help of fire water jet & air jet
Repairing of eroded baskets of APH (cold end)
Checking of guide bearing housing level.
checking of adjuster rods of sector plate/ axial seal plate & repairing of the same if required.
Replacement of pinion/ speed reducer including fluid coupling of APH. Works to be carried out is as under (a) shifting of new reducer gear/ pinion from central store to the work place. (b) draining of oil from the reducer. (c) opening of air seal cover of pinion. (d) decoupling of electric & air motor & removal of speed reducer from its place. (e) removal of pinion from the drive shaft. (f) mounting of the new pinion on the shaft & checking of its run out. (g) placing of speed reducer at its original place and its alignment with electric and air motor. (h) checking of root gap and top bottom gap between pin rack and pinion. (i) closing of air seal cover of pinion with air pipe. (j) filling of fresh oil in the reducer up to the level (k) alignment of gear drive with motor and successful trial run.
Replacement of eroded end plates at hot end/cold end.
checking of level and levelling of sector plate, main rotor and axial seal plate level of APH.
Measurement of critical distance of guide bearing & rectification.
Checking of support bearing level.
Levelling of support bearing of APH.
Removal of Ash accumulated over the space in between the rotor shell and APH outer body shell.
Servicing/Replacement of gear box, counterweight & related accessories of single nozzle cleaning device of APH
Repairing/replacement of fluid coupling of APH
Replacement/Repairing / adjustment of adjuster bolt of axial seal plate / Radial sector plate of APH.
Fixing of Sealing bar & Sealing strip over hot end baskets of APH.
Reclamation/Repairing/Conversion of worn out basket of APH (Hot End & Intermediate).
In-situ repairing/replacement of cold end grating.
JEYES ENGINEERS AND CONTRACTORS PVT LTD
S. S. ENGINEERING AND CO
TECHNO HITECH PVT. LTD.
M/s Krishna Engineering Works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .