Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | -24.15% | ₹6.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.9 L+₹35,868.20 (5.48%)Admitted-Fee/PreQual/Technical/Finance | -19.99% | ₹6.9 L+₹35,868.20 (5.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹6.9 L+₹35,868.20 (5.48%)Admitted-Fee/PreQual/Technical/Finance | -19.99% | ₹6.9 L+₹35,868.20 (5.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹6.9 L+₹35,868.20 (5.48%)Admitted-Fee/PreQual/Technical/Finance SAMBALPUR MUNICIPAL CORPORATION SAMBALPUR | SAMBALPUR | ODISHA | 768001 | -19.99% | ₹6.9 L+₹35,868.20 (5.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹6.9 L+₹35,868.20 (5.48%)Admitted-Fee/PreQual/Technical/Finance | -19.99% | ₹6.9 L+₹35,868.20 (5.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.6 L
EMD Value
₹8,600
Closing Date
2 Jul 2026, 5:00 pmClosed
Superintending Engineer
O/o the SE, Jajpur Irrigation Division, Jajpur
Canal improvement
2026_CDJID_132142_2
e-Procurement Notice No.01/ 2026-27
Open Tender
Civil Works - Canal
Percentage
180 days
Jajpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹8,600
Yes
8 Aug 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
18 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50m outside the periphery of the working area on pre-measurement depositing the debris away from the work site with all leads, lifts and delifts with cost of labour, T&P, hire and running charges of all machineries including cess etc. complete as per direction of the Engineer-in-Charge. | 25,883 | One Sqm | 2.85 | ₹73,766.55 |
| 2 | Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and breaking clods to maximum 5cm to 7cm including leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge. | 2,950 | One Cum | 175.45 | ₹5,17,577.5 |
| 3 | Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge. | 41 | One Cum | 210.5 | ₹8,630.5 |
| 4 | Filling foundation and plinth with sand with well watered and rammed including cost, carriage, royalty of sand, cess etc. complete as directed by the Engineer-in-charge. | 3 | One Cum | 530.55 | ₹1,591.65 |
| 5 | Providing and laying Cement Concrete (1:3:6) using 40 mm size hard granite metal free from weathered skinned and other deleterious materials including hoisting and laying concrete and curing for required days including all labours T&P, cost, conveyance, royalty all applicable and all incidental charges required to complete the work etc. complete as per direction of Engineer-in-charge. | 3 | One Cum | 6,601.95 | ₹19,805.85 |
| 6 | Providing and laying Cement Cconcrete M-20 with using 20mm and down graded size Crusher broken hard granite chips, sharp sand of approved grading and quality conforming to the specification, mixing by concrete mixer and placing manually on approved surface, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangways and scaffolding, chute with cost, conveyance, labour cess, royalties of all materials, site illumination hire and running charges of machineries required for the work as per approved drawing and specification with all cost incidental to the work etc. complete including labour cess as per the direction of the Engineer-in-Charge | 30.9 | One Cum | 6,832.4 | ₹2,11,121.16 |
| 7 | Rigid and smooth centering and shuttering for R.C.C works including false works and dismantling them after casting including cost of materials, labour css etc. complete as per direction of Engineer-in-charge. | 109.2 | One Sqm | 249.83 | ₹27,281.44 |
| 8 | Conveying supplying and laying 150 mm dia NP-3 Hume Pipe including fixing collar joints with RCC including all labour and cost, conveyance of NP-3 Hume Pipe etc. complete as per direction of Engineer-in-Charge. | 6 | One Rmt | 406.95 | ₹2,441.7 |
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.30 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
TechBidJJPR02.pdf
Tender Documents • 2.04 MB
BOQ_596583.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .