Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.3 LAccepted-AOC BULANDSHAHAR | HATHRAS | UTTAR PRADESH | 203001 | ₹80.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹86.7 LRejected-Finance | ₹86.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.0 CrRejected-Finance H 12 SECTOR DELTA II GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | G B NAGAR | UP | ₹1.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.1 CrRejected-Finance | ₹1.1 Cr | L4 | Rejected-Finance L4 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
12 Feb 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Strengthening and Resurfacing of Rabupura to Parsol Sampark Marg upto Dankaur-Jhajhar Road and R.C.C. drain in Pachokra main road, YEA. WC-06
2026_YEIDA_1111842_11
YEA/GM(PROJECT)/2026/463 DT-29/01/2026
Open Tender
Civil Works
Item Rate
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,372
₹2.4 L
23 Jun 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
Dry brick on edge flooring in required pattern with bricks of class designation 150 on a bed of earth including filling compressed, with M-150 bricks. (DAR/11.2/AR/YEIDA/Based on UPPWD/SOR-2020)
Surfacing dressing of the ground including removing vegetation and not exceeding deep and disposal of rubbish lead upto 50 mtr and lift upto 1.5 mtr
Supplying and Stacking at site.. 63 mm to 45 mm size stone aggregate. (SOR 18/16.3.2)
Supplying and Stacking at site.. 63 mm to 45 mm size stone aggregate. Royalty to be paid extra
Supplying and Stacking at site.. 53 mm to 22.4 mm size stone aggregate. (SOR 18/16.3.3)
Supplying and Stacking at site.. 53 mm to 22.4 mm size stone aggregate. Royalty to be paid extra
Supplying and stacking at site Moorum (SOR 18/16.3.10)
Supplying and stacking at site Moorum Royalty to be paid extra
Providing and applying tack coat With bitumen VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.MORTH/503(UPPWD/SOR-2020)
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.50 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.50 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Royalty to be paid extra
Laying spreading and compacting stone aggregate of specified sizes to WBM specifications including spreading in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate watering and compacting to the required density SOR-18/16.4
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_2055923.xls
BOQ • 0.26 MB
11.pdf
Tender Documents • 1.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].