Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAdmitted-Finance PO PS BOMDILA DISTT WEST KAMENG ARUNACHAL PRADESH 790001 | BOMDILA | WEST KAMENG | ARUNACHAL PRADESH | 790001 | ₹15.0 L | L1 | Admitted-Finance |
| 2 | L2₹15.1 L+₹12,785.40 (0.85%)Admitted-Finance | ₹15.1 L+₹12,785.40 (0.85%) | L2 | Admitted-Finance |
| 3 | L3₹15.5 L+₹46,687.80 (3.11%)Admitted-Finance CAMP TENGA MARKET P O P S TENGA VALLEY DIST WEST KAMENG ARUNACHAL PRADESH PIN 790 116 | WEST KAMENG | ARUNACHAL PRADESH | 790116 | ₹15.5 L+₹46,687.80 (3.11%) | L3 | Admitted-Finance |
| 4 | L4₹15.5 L+₹52,964.70 (3.53%)Admitted-Finance | ₹15.5 L+₹52,964.70 (3.53%) | L4 | Admitted-Finance |
| 5 | L5₹15.9 L+₹86,203.10 (5.75%)Admitted-Finance | ₹15.9 L+₹86,203.10 (5.75%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Paramount Association of India L1 | M/S R P M CONSTRUCTION L3 | M/S MURPHEW ENTERPRISES L4 | M/S SM ANSARI L7 | M/s 99 Enterprise of India L5 | polar agencies L6 | M/S ASHOK CONSTRUCTION L2 | M/S HIGHLANDERS ASSOCIATE OF HIMALAYAS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating over areas, n exc 1.5 m deep and getting out in hard / dense soil complete all as specified and directed | 66.15 | CUM | 652 ₹43,129.8 Lowest | 710 ₹46,966.5 | 700 ₹46,305 | 730 ₹48,289.5 | 660 ₹43,659 | 750 ₹49,612.5 | 660 ₹43,659 | 700 ₹46,305 |
| 2.00 | Rough excavation n exc. 1.5m deep and gatling out in hard/dense soil. Complete all as specified and directed | 52.5 | CUM | 488 ₹25,620 Lowest | 540 ₹28,350 | 550 ₹28,875 | 600 ₹31,500 | 500 ₹26,250 | 560 ₹29,400 | 500 ₹26,250 | 600 ₹31,500 |
| 3.00 | M & L for PCC 1:4:8 type D-2 (using 40mm graded store aggregate )as in foundation bed concrete complete all as specified and directed | 31.15 | CUM | 7,950 ₹2,47,642.5 Lowest | 8,150 ₹2,53,872.5 | 8,000 ₹2,49,200 | 8,250 ₹2,56,987.5 | 8,000 ₹2,49,200 | 8,400 ₹2,61,660 | 8,000 ₹2,49,200 | 9,000 ₹2,80,350 |
| 4.00 | M&L for walling of random rubble uncoursed, well bonded, bedded and solidly hearted built in CM 1:6 complete all as pecified and directed | 131.4 | CUM | 7,000 ₹9,19,800 Lowest | 7,050 ₹9,26,370 | 7,200 ₹9,46,080 | 7,400 ₹9,72,360 | 7,500 ₹9,85,500 | 7,250 ₹9,52,650 | 7,000 ₹9,19,800 Lowest | 9,000 ₹11,82,600 |
| 5.00 | Extra over stone walling for hammer dressing with maximum depression from straight edge held against the dressed surface n exc 40 mm granite or trap stone to face beds and joints as specified of random rubble walling uncoursed or brought upto courses complete all specified and directed. | 105 | SQM | 508 ₹53,340 Lowest | 570 ₹59,850 | 550 ₹57,750 | 600 ₹63,000 | 600 ₹63,000 | 600 ₹63,000 | 530 ₹55,650 | 700 ₹73,500 |
| 6.00 | Returning filling in including spreading levelling watering and well ramming in layers not exc 25 cm thick as in hard/dense soil complete all specified and directed, | 38.85 | CUM | 200 ₹7,770 Lowest | 270 ₹10,489.5 | 262 ₹10,178.7 | 290 ₹11,266.5 | 300 ₹11,655 | 300 ₹11,655 | 250 ₹9,712.5 | 300 ₹11,655 |
| 7.00 | Rernoving excavated material not exc 50 mtr depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed | 79.8 | CUM | 465 ₹37,107 Lowest | 540 ₹43,092 | 510 ₹40,698 | 545 ₹43,491 | 500 ₹39,900 | 550 ₹43,890 | 500 ₹39,900 | 690 ₹55,062 |
| 8.00 | M&L for Hand packing (any thickness )at back filling with broken stone or boulders complete all as specified and directed | 2.84 | CUM | 2,490 ₹7,071.6 Lowest | 2,600 ₹7,384 | 2,550 ₹7,242 | 2,600 ₹7,384 | 3,000 ₹8,520 | 2,500 ₹7,100 | 2,500 ₹7,100 | 4,000 ₹11,360 |
| 9.00 | M&L PCC 1:2:4 type B-1 using 20mm graded stone aggregate as in coping complete all as specified and directed | 2.6 | CUM | 13,400 ₹34,826.6 Lowest | 14,200 ₹36,905.8 | 14,000 ₹36,386 | 14,750 ₹38,335.25 | 13,400 ₹34,826.6 Lowest | 15,000 ₹38,985 | 13,600 ₹35,346.4 | 14,000 ₹36,386 |
| 10.00 | M&L for Precast PCC bonders (for stone wailing) type B-1, 1:2:4 (20mm graded stone agg) in CM 1:6 as in bond stone complete all as specified and directed | 2.3 | CUM | 16,000 ₹36,800 Lowest | 16,800 ₹38,640 | 16,500 ₹37,950 | 17,500 ₹40,250 | 16,000 ₹36,800 Lowest | 17,000 ₹39,100 | 16,300 ₹37,490 | 17,000 ₹39,100 |
Tender Value
₹1.4 L
EMD Value
₹30,000
Closing Date
25 Apr 2026, 6:00 pmClosed
Maj Rohit Gogoi
GE859EWS
REPAIR REPLACEMENT OF RETAINING WALL UNDER PARA 35 OF DWP 2020
2026_MES_760093_1
9007
Open Tender
Civil Works
Item Rate
180 days
TAWNG
As per tender document
7 documents required · 7 mandatory
₹500
Yes
GE 859 EWS
₹30,000
Yes
28 Apr 2026
11 Apr 2026
27 Apr 2026
11 Apr 2026
25 Apr 2026
18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating over areas, n exc 1.5 m deep and getting out in hard / dense soil complete all as specified and directed | - | CUM | - | - |
| 2 | Rough excavation n exc. 1.5m deep and gatling out in hard/dense soil. Complete all as specified and directed | - | CUM | - | - |
| 3 | M & L for PCC 1:4:8 type D-2 (using 40mm graded store aggregate )as in foundation bed concrete complete all as specified and directed | - | CUM | - | - |
| 4 | M&L for walling of random rubble uncoursed, well bonded, bedded and solidly hearted built in CM 1:6 complete all as pecified and directed | - | CUM | - | - |
| 5 | Extra over stone walling for hammer dressing with maximum depression from straight edge held against the dressed surface n exc 40 mm granite or trap stone to face beds and joints as specified of random rubble walling uncoursed or brought upto courses complete all specified and directed. | - | SQM | - | - |
| 6 | Returning filling in including spreading levelling watering and well ramming in layers not exc 25 cm thick as in hard/dense soil complete all specified and directed, | - | CUM | - | - |
| 7 | Rernoving excavated material not exc 50 mtr depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed | - | CUM | - | - |
| 8 | M&L for Hand packing (any thickness )at back filling with broken stone or boulders complete all as specified and directed | - | CUM | - | - |
| 9 | M&L PCC 1:2:4 type B-1 using 20mm graded stone aggregate as in coping complete all as specified and directed | - | CUM | - | - |
| 10 | M&L for Precast PCC bonders (for stone wailing) type B-1, 1:2:4 (20mm graded stone agg) in CM 1:6 as in bond stone complete all as specified and directed | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tender.pdf
Tender Documents • 1.30 MB
particualr.pdf
Additional Documents • 0.75 MB
BOQ_851378.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .