Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.6 LAccepted-AOC | ₹80.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹82.6 L+₹2.0 L (2.44%)Rejected-Finance | ₹82.6 L+₹2.0 L (2.44%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical H NO 471 GIANI ZAIL SINGH NAGAR ROPAR RUPNAGAR ROPAR RUPNAGAR PUNJAB 140001 | RUPNAGAR | PUNJAB | 140001 | - | - | Rejected-Technical Requirement not met |
| Sl No | Description | Qty | Unit | INDIAN GEOTECHNICAL SERVICES L2 | Super Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00Exploratory Drilling Works | |||||
| 1.01 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (a) up to 100Km | 4 | Each Trip | 95,000 ₹3,80,000 Lowest | 1,00,000 ₹4,00,000 |
| 2.00 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (b) add extra for every 50Km | 47.2 | Each Trip | 9,500 ₹4,48,400 Lowest | 10,000 ₹4,72,000 |
| 3.00 | Making Approach Path and Cutting of Steps in hilley terrain including cost of labour and T&P complete for 3.0 m wide path | 70 | per 100 m length | 5,000 ₹3,50,000 Lowest | 25,000 ₹17,50,000 |
| 4.00 | Dismantling, transportation and assembling of Drilling
Machines of diff erent capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. (b) up to 500 m lead | 2 | Each machine | 1,25,000 ₹2,50,000 Lowest | 2,50,000 ₹5,00,000 |
| 5.00 | Laying of Temporary Water Supply pipelines (25 mm diameter and above) of varying lengths from the nearest water source and construction of Temporary
Water Retaining Pit of size 2 m x 1 m x 0.5 m complete with cost of all labour, material, T&P and transport as per directions of engineer-in-charge.Including the cost of GI pipes and fittings: upto 750m | 2 | Each | 45,000 ₹90,000 | 25,000 ₹50,000 Lowest |
| 6.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge.In hard rock formation:upto 100m depth | 280 | meter | 14,500 ₹40,60,000 | 10,000 ₹28,00,000 Lowest |
| 7.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform
including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth | 100 | meter | 15,000 ₹15,00,000 | 10,500 ₹10,50,000 Lowest |
| 8.00 | Water permeability tests at different depth:upto 100m. | 94 | Each | 4,500 ₹4,23,000 | 3,500 ₹3,29,000 Lowest |
| 9.00 | Water permeability tests at different depth:upto 100m -300m. | 34 | Each | 6,000 ₹2,04,000 | 3,700 ₹1,25,800 Lowest |
Tender Value
₹74.4 L
EMD Value
₹1.5 L
Closing Date
15 Feb 2023, 4:55 pmClosed
Senior Manager (Elec)
NHPC LTD Pasighat
Exploratory Drilling Works 03 Nos holes 60m each and 01 No hole at min 200 m each at Right and left Bank USMPS at Parong Dam Axi
2023_NHPC_735086_1
NH/Siang Lower/NIT/2023/03 dated 17.01.2023
Open Tender
Civil Works
Works
120 days
Parong
as per tender documents
2 documents required · 2 mandatory
₹1,180
NHPC Limited
₹1.5 L
Yes
31 Jul 2026
18 Jan 2023
22 Feb 2023
18 Jan 2023
15 Feb 2023
18 Jan 2023
18 Jan 2023 - 30 Jan 2023
Amount
Exploratory Drilling Works
Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (a) up to 100Km
Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. (b) add extra for every 50Km
Making Approach Path and Cutting of Steps in hilley terrain including cost of labour and T&P complete for 3.0 m wide path
Dismantling, transportation and assembling of Drilling Machines of diff erent capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. (b) up to 500 m lead
Laying of Temporary Water Supply pipelines (25 mm diameter and above) of varying lengths from the nearest water source and construction of Temporary Water Retaining Pit of size 2 m x 1 m x 0.5 m complete with cost of all labour, material, T&P and transport as per directions of engineer-in-charge.Including the cost of GI pipes and fittings: upto 750m
Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge.In hard rock formation:upto 100m depth
Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth
Water permeability tests at different depth:upto 100m.
Water permeability tests at different depth:upto 100m -300m.
Fabrication and supply of seasoned wooden Core Box of size 1.5 m x 0.3 m x 0.1 m with wooden separators, hinges, handles etc. complete in all respect as per directions of engineer-in-charge.
Providing and laying cement concrete 1:2:4(1cement:2 Coarse sand:4 stone aggregate 20mm nominal size) excluding the cost of centring and shuttering in: (a) Foundation & Plinth.
Centring and shuttering including struting proping etc. and removal of form work for:(a) Foundation and plinth.
Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle /Surki/ Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc by Manual Means and Stacking for hill roads.
Cost of haulage excluding loading and unloading(i)Surfaced Road.
Cost of haulage excluding loading and unloading on hill roads. Haulage of materials by Tipper excluding cost of loading, unloading and stacking. (ii) Unsurfaced Gravel road.
INDIAN GEOTECHNICAL SERVICES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .