Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC AT MALPADA PO PS DIST BALANGIR 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | ₹24.2 L | L1 | Accepted-AOC Agreement drawn and Work Order issued on 30.06.2026 |
| 2 | L2₹25.6 L+₹1.4 L (5.71%)Rejected-Finance AT PO KANTABANJI TUREKLA PIN 767039 DISTRICT BALANGIR ODISHA | KANTABANJI | BALANGIR | ODISHA | 767039 | ₹25.6 L+₹1.4 L (5.71%) | L2 | Rejected-Finance Stand L2 |
| 3 | L3₹28.6 L+₹4.4 L (18.2%)Rejected-Finance ADARSA PADA BALANGIR BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | ₹28.6 L+₹4.4 L (18.2%) | L3 | Rejected-Finance Stand L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to insufficient technical bid documents |
Tender Value
₹30.3 L
EMD Value
₹30,400
Closing Date
20 Apr 2026, 5:00 pmClosed
Superintending Engineer Kantabanji (RandB) Divn.
O/O the Superintending Engineer Kantabanji (RandB) Division
Utility Shifting work for Improvement such as widening and strengthing of Saintala - Titilagarh Road 0/000 km to 30/915 km (except from 3/400 km to 5/700 km) from Womens College to Madan Jal Chowk, Titilagarh
2026_EICCL_127875_6
17/KBJ/2025-26(1)
National Competitive Bid
Electrical Works
Percentage
60 days
KANTABANJI
Please refer tender documents
3 documents required · 3 mandatory
₹6,000
₹30,400
Yes
17 Jul 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
9 Apr 2026 - 15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of other materials for line and sub station
Cost of 11KV Line with 100 mm2 AAAC including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10% | 3.47 | Km. | - | - |
| 2 | Cost of common material for 11KV SP Cut point with 11mtr long GI Joist Pole (Excluding pole & Civil work cost) (100Sqmm) including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10% | - | No. | - | - |
| 3 | Cost of common material for 11KV Line pin point with 11mtr long GI Joist Pole (Excluding pole & Civil work cost) including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10% | - | No. | - | - |
| 4 | Construction of 3-Ph 95mm2 (5 Wire) AB Cable on 9 mtr X 300Kg PSC Pole for LT Line (30 mtr span)(Excluding pole) including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 10% | - | Km. | - | - |
| 5 | Cost of Transormer/Breaker/Joist Pole
Supports of 11 mtr. long 150 X 150 mm Joist GI Pole as per TPWODL norms including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 5% | - | No. | - | - |
| 6 | Cost of PSC Pole
Cost of 9 mtr. Long 300 Kg. PSC Pole for HT line + S/S+ others including 1% LC, T&P @ 2%, Transportation@ 7.5%, Erection Charge @ 20% | - | No. | - | - |
| 7 | Concreting ratio 1:1, 5:3 (M-20 Grade) (500mm x 500mm x1800mm) = 0.45 Cum (Per Pole) including 1% LC | 22.5 | Cum | - | - |
| 8 | Couping Ratio 1:1, 5:3 (M-20 Grade) With dimension (500mm x 500mm x 450mm) = 0.1125 Cum (Per Pole) including 1% LC | 6.75 | Cum | - | - |
| 9 | Stay Concreting Ratio 1:1, 5:3 (M-20 Grade) With dimension (500mm x 500mm x 800mm) = 0.2Cum (Per Stay) including 1% LC | 2 | Cum | - | - |
| 10 | Dismantal cost of LT Line including 1% LC | - | Km. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587179.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.52 MB
DTCNUSST.pdf
Tender Documents • 1.38 MB
BOQ_587179.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .